PG&E EV Fleet Program.

Slides:



Advertisements
Similar presentations
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
Advertisements

NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Chatsworth Water Works Commission
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Biodiesel Production: Government Regulations (IL) Barry Latham, M.A.Ed. Biodiesel Production & Curriculum Chemistry & Physics Instructor Chicago Heights,
NEW YORK Market Profile July NEW YORK Market Service Map Market Size: $21.7 Billion Market Potential 20.9 Million Potential Customers.
ELECTRICAL ENERGY. Old style Residential Electric Meter.
Genesis Solar Module Brochure ™
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Electric Vehicle Infrastructure and Education Program Overview
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Vehicle-Grid Integration (VGI) © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved.
Pg. 1 Energy Intelligence Program Monitor your industrial facility and save energy! Tool that provides real-time feedback to help you manage energy in.
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Alternative and Renewable Fuel and Vehicle Technology Program (ARFVTP) Jacob Orenberg Emerging Fuels.
2009 Bidders Workshop Attachment D August 3, 2009.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
OUC’s EV Roadmap Near Term Planning Activities Develop a flexible framework and visionary roadmap Collect actionable information Business models Charging.
How to Help Your Customers Read Their Electric Bills and Apply for Incentives Charley Budd, KEMA.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
M ICHIGAN P UBLIC S ERVICE C OMMISSION Energy Optimization Plans 2011 Biennial Review Pre-Filing Update Rob Ozar, Manager Energy Optimization Section March.
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
© 2000 PACIFICORP | PAGE 1. © 2000 PACIFICORP | PAGE 2 Current Conditions – Utah Plug in Vehicles.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 12/17/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
SCE Green Rate and Community Renewables Programs 2016.
Pay-As-You-Go Final 2012 Report. Agenda PAYG Refresher Pilot Goals & Overview Voice of the Customer Front Office Impacts Back Office Impacts Financial.
“Compressed Natural Gas (CNG) Fueling Systems – Integrating Alternative Fuels on NJ’s Brownfield's” Chuck Feinberg - Greener By Design Michael Sylvester.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Agenda 1 – 1:10pm Introductions 1:10 – 1:30pm Context & Draft EV Charging Infrastructure Requirements 1:30 – 2pm EV Charging Requirement Options & Costing.
New Jersey Energy Efficiency, Generation & Resilience Funding Update
Sunverge Energy – SGIP Overview
California Product Offerings
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
Cisco Capital Open Pay Consumption Model
PEV Adoption: Preliminary Forecast
Interreg Atlantic Area Programme Partner Budget & Eligibility Rules
Time of Use Rates: A Practical Option – If Done Well
A CNG Overview Justin Stiff Sales Staff Consultant January 13, 2014.
Market Operations Engagement Group EVSE Working Group – Principles
SMUD - Whole Foods Energy Storage System
Funding presentation Ashley Reynolds & Jaime R. Lemus
Light-Duty ZEV Incentive Programs
Maximizing Grid Benefits of DERs through Rate Design
Current as of 12/12/2017 RES-BCT.
Rose Drive Friends Church Solar Project Proposal
City of Lebanon, Missouri Electric Department
Net Metering John McComb: P.E.
Customer Dedicated Solar
This event will begin at 10:00 AM
Net Metering John McComb: P.E.
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Metropolitan Mayors Caucus Illinois Energy Bills
Mike Mumper & Brian Kick Good afternoon
ODOT purchased five Nissan Leaf Sedans in 2011
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Energy for What’s Ahead Lisa Arellanes
Fleet Electrification
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Energy Savings for Business Program
SMUD Commercial EVSE Programs
PG&E EV Fleet Program.
Transportation Electrification Programs Overview
SMUD Commercial EVSE Programs
Medium & Heavy Duty Electric Transportation Rate Designs at SCE
Presentation transcript:

PG&E EV Fleet Program

EV Fleet Program Overview PG&E will help you install EV infrastructure for medium- and heavy-duty fleets $236 million Support conversion of commercial and public fleets to electric Examples: Delivery vehicles, school buses, transit buses, and more… budget over 5 years from 2019-2023 700+ sites supporting 6,500 new EVs

EV Fleet Program Overview Over 700 sites will support 6,500 new EVs Medium Duty Delivery (class 2-6) Truck Stop Electrification Transport Refrigeration Units Port Cargo Trucks Airport Ground Support Equipment Off-Road Heavy Duty Transit* (class 7-8) *15% minimum of total required School bus (class 6-7) Other (class 7-8) Forklifts* *10% maximum of total allowed

EV Fleet Ownership—Customer-owned PG&E pays for infrastructure cost up to the customer meter Customer-owned1 PG&E pays for, constructs, owns, and maintains electrical infrastructure to the meter panel Customer pays for, constructs, owns, and maintains make-ready infrastructure from meter to the charger 1 At PG&E discretion. PG&E will determine eligibility based on project scope and associated costs. Some exceptions may apply to customers who hold Primary Service with PG&E.

EV Fleet Ownership—Customer-owned PG&E pays for infrastructure cost up to the customer meter Customer-owned1 Customer-owned infrastructure Eligible for incentive up to capped amount based on vehicle sector Vehicle type Per vehicle incentive cap2 Transit buses & Class 8 trucks $9,000 per vehicle Transportation refrigeration units, truck stop electrification, ground support equipment & forklifts $3,000 per vehicle School buses, local delivery trucks, and other vehicles $4,000 per vehicle PG&E pays for, constructs, owns, and maintains electrical infrastructure to the meter panel Customer pays for, constructs, owns, and maintains make-ready infrastructure from meter to the charger 1 At PG&E discretion. PG&E will determine eligibility based on project scope and associated costs. Some exceptions may apply to customers who hold Primary Service with PG&E. 2 Limited to 25 vehicles per site; sites with more vehicles to be considered on an individual basis.

EV Fleet Ownership—Customer-owned PG&E pays for infrastructure cost up to the customer meter Customer-owned1 Charging equipment rebates for Schools, Transit Agencies and Disadvantaged communities EVSE power Max. rebate amount3 Up to 50kW $15,000 per charger 50-150kW $25,000 per charger 150kW+ $42,000 per charger Program participant pays for charging equipment Customer-owned infrastructure Eligible for incentive up to capped amount based on vehicle sector Vehicle type Per vehicle incentive cap2 Transit buses & Class 8 trucks $9,000 per vehicle Transportation refrigeration units, truck stop electrification, ground support equipment & forklifts $3,000 per vehicle School buses, local delivery trucks, and other vehicles $4,000 per vehicle PG&E pays for, constructs, owns, and maintains electrical infrastructure to the meter panel Customer pays for, constructs, owns, and maintains make-ready infrastructure from meter to the charger 1 At PG&E discretion. PG&E will determine eligibility based on project scope and associated costs. Some exceptions may apply to customers who hold Primary Service with PG&E. 2 Limited to 25 vehicles per site; sites with more vehicles to be considered on an individual basis. 3 EVSE rebate amounts subject to change based upon EVSE RFQ. Rebate not to exceed 50% of charger equipment and installation costs. EVSE must meet minimum and standard requirements to be eligible for rebate.

EV Fleet Ownership—PG&E-owned PG&E pays for a significant portion of the total costs PG&E-owned1 Program participant pays for charging equipment Charging equipment rebates for Schools, Transit Agencies and Disadvantaged communities EVSE power Max. rebate amount2 Up to 50kW $15,000 per charger 50-150kW $25,000 per charger 150kW+ $42,000 per charger PG&E pays for, constructs, owns, and maintains all electrical infrastructure 1 At PG&E discretion. PG&E will determine eligibility based on project scope and associated costs. Some exceptions may apply to customers who hold Primary Service with PG&E. 2 EVSE rebate amounts subject to change based upon EVSE RFQ. Rebate not to exceed 50% of charger equipment and installation costs. EVSE must meet minimum and standard requirements to be eligible for rebate.

How to Prepare What we need from you… Demonstrate commitment to procurement of a minimum of 2 electric fleet vehicles Demonstrate long-term electrification growth plan and schedule of load increase Provide data related to charger usage for a minimum of 5 years Own or lease the property where chargers are installed, and operate and maintain vehicles and chargers for minimum of 10 years

EV Fleet Customer Process A high level view of steps to participate in the program SOLUTION DESIGN 3-5 months EXECUTION 6-8 months Submit Application Start Issue rebate / Activate Complete Capacity check / desktop review Site walk and preliminary design Calculate ROM cost estimate Sign contract Execute construction

Proposed Commercial EV (CEV) Rate Structure1 1. Customers choose subscription level, based on charging needs $184 / 50 kW connected charging Subscription Charge Customers that want to manage charging loads can opt for a lower subscription level 2. Subscription remains consistent month-to-month If site charging power exceeds subscription, customer pays an overage for that month 3. Energy usage is billed based on time-of-day pricing Subscription charge is similar to the familiar “data plan” model used for cell phone pricing Subscription is significantly lower than demand charges today, helping lower-utilization sites save considerably compared to current rates (an equivalent demand charge on current A-10 rates would be 3x higher) Customers can change their subscription level throughout the year if needed, within limits of billing/customer service systems Subscription charge for CEV-small rate is $25 and increments are in 10 kW of connected load. Overage charge is equivalent to 2X a subscription charge (e.g. $368 for CEV large) for each additional unit of subscription PG&E proposes a 3-month grace period when customers sign up for CEV rates, before overage charges would be incurred. Energy rates are consistent year-round – no seasonal variations or weekend/weekday pricing. Low cost charging is available 18 hours of the day Energy Charge 11¢ / kWh 30¢ / kWh 9¢ / kWh Midnight 9am 2pm 4pm 10pm Charging is cheapest mid-day, when PG&E has higher levels of renewable energy generation Customers should avoid charging during peak hours from 4-10 p.m., when possible 1 CEV rates are not yet approved. Values above represent CEV-Large secondary proposed rates. CEV-Small proposed rate has a lower subscription charge ($25 per 10 kW connected charging)

Estimated Bill Savings Model1 For modeled customer sites, new CEV rates can enable significant savings compared to existing commercial rate plans Values translated to cost/mile are included off the page – often more relevant for fleets than cost per kWh. Note: actual bill impacts will vary for each customer depending on charging usage patterns 1 Rate and billing estimates are preliminary and only reflect the sample site modeled. Actual costs will vary based on approved rate values, as well as individual site energy usage.

And I welcome your questions. Thank you. And I welcome your questions. Ann Camperson Channel Partner Lead Ann.Camperson@pge.com 925-459-2122

Helpful Resources / Links EV Fleet Website EV Fleet Fact Sheet EV Fleet Interest Form EV Fleet Application EV Fleet Rebate Calculator (for charger) EV Fleet Incentive Calculator (for infrastructure) EV Fleet Rate Calculator EV Fleet List of Approved Charging Vendors EV Fleet Terms and Conditions EV Fleet Customer Information Sharing Agreement EV Fleet Non-Disclosure Agreement EV Fleet Additional Funding Filtering Tool PG&E Service Territory Map