Italian Lab Meeting-CETARA 13-14 September 2010 Padova Scanning lab. Umut KOSE INFN-Padova Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Microscopes Scanning was stopped about 1 month due to some hardware problems (Bari meeting). Thanks to Gabriele, with his help the problem understood (X-axis encoder is broken) and solved. The scanning resumed 5 August. For a quick solution, we exchange the stage with the new one which was bought for the second microscope. Therefore the construction of the second mic. delayed for awhile. Broken stage have been sent to MICOS company, Germany on 30 August. We are waiting for detail information. Microscopes Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Some questions.. What kind of events would be glued, edge or all? Not glued!!! Not glued!!! Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Brick Handling: For several bricks, emulsion films was not in a correct order!!!! What happens? Can we see the web page in which all CS scanning results stored, from outside of LNGS? Glued!!! Not glued!!! Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Quick check of CS predictions 70% CC 71% with muon 45% 4/4 and 55% ¾ 77% of the tracks 4/4 + 23% 3/4 43% convergence pattern seen (%67 with muon + 33% no muon) 29% single track on CS (75% muon + 25% hadron) and (25% 4/4 + 75% 3/4) 30% NC 45% of the tracks 4/4 + 55% 3/4 50% convergence pattern seen Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Software: SYSAL.net cuba-libre edition.. Last version of ScanGrid.. Standard scanback location procedure is followed.. Updated decay search procedure .. Man power: 1 expert + 1 shifter Looking for Master/Ph.D students Current speed 4events/week Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 2009run CC NC Total Events 29* 10 39 CS-ECC connected 27 7 34 Not connected 2 3 5 Located in ECC 21* 26 Penetrating the brick 4 6 Interesting event 1*** 1 *2 black CS events. ***there is a problem to extract downstream brick by the BMS Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Charm candidate 1ryvertex 64104.5 26713.0 -7926.9 pl51 base 0.0394 0.0609 64415.3 27198.0 2.9 (muon) -0.1855 -0.0853 62636.8 26035.8 2.8 -0.2076 -0.2671 62459.1 24596.2 0.8 -0.3876 -0.0773 61030.7 26098.7 1.9 -0.0500 0.1355 64197.7 26723.9 1.4(parent) Event number: 9317000655 Brick number: 59278 Black CS Event type: CC 1ry vertex at pl51 base Decay vertex between pl51-52 in lead Decay vertex 64061.1 26781.9 -7182.7 pl52-51 in lead plate 0.0319 0.2462 64288.3 28551.7 2.2 0.0996 0.2041 64776.6 28247.3 0.9 -0.0798 -0.1044 63489.2 26031.6 1.5 Trident topology Trident topology, FL: 750micron. No nuclear fragments were observed on pl52. To do full kinematic analysis of the event, downstream brick is requested. Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 2010run CC NC Total Events 1 CS-ECC connected Not connected Located in ECC Penetrating the brick Interesting event Italian Lab Meeting-CETARA 13-14 September 2010
Italian Lab Meeting-CETARA 13-14 September 2010 Future prospects Start scanning with second microscope, When 2nd mic. ready for scanning, plate changer would be attached and configured. With current speed 4 events/week could be finished. With second microscope we could increase the number of located events.. Italian Lab Meeting-CETARA 13-14 September 2010