Advanced Implantation Detector Array (AIDA)

Slides:



Advertisements
Similar presentations
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Advertisements

Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics & Astronomy The University of Edinburgh presented by Tom Davinson.
Technical Solutions for High Vacuum Compatible FEE for the EXL Recoil Detector Vacuum operating pressure? bakeout temperature? what’s in the vacuum system,
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh.
RIBF P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration Tom Davinson.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh.
AIDA Update presented by Ian Lazarus on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy.
Advanced Implantation Detector Array (AIDA): Update & Issues presented by Tom Davinson on behalf of the DESPEC-DSSD/AIDA collaboration Tom Davinson School.
ROGER CABALLERO FOLCH, FRS User meeting GSI, 28 th November 2011 S410 EXPERIMENT GSI – SEPTEMBER 2011.
ROGER CABALLERO-FOLCH Universitat Politècnica de Catalunya 26 de febrer de 2013 NUSTAR ANNUAL MEETING GSI Darmstadt, Germany Beta dELayEd Neutron.
Advanced GAmma Tracking Array
AIDA Update presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy.
ROGER CABALLERO FOLCH, Barcelona, 9 th November 2011.
The BEta deLayEd Neutron emission measurements
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Decay Spectroscopy at FAIR with AIDA presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson.
Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented.
Thoughts on the E(U)RICA DAQ Hidetada Baba RIKEN.
M. Labiche - INTAG workshop GSI May Se - D prototype for the focal plane of the PRISMA spectrometer (Task4) Digitisers for SAGE & LISA (task1)
Tom Tom Davinson School of Physics DESPEC DSSD Working Group Status & Open Issues.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Setups (BELEN, MONSTER  D. Cano-Ott/ CIEMAT) Implantation detector (SIMBA, AIDA (>autumn 2010) ) Beams N=50 (78Ni): 124Sn (?) N=82 (132Sn, 130Cd): 136Xe,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Ciemat Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas D. Cano-Ott DESPEC/HISPEC Coll. Meeting, 15th-16th of June 2005-Valencia.
R-process experiments at the National Superconducting Cyclotron Laboratory Giuseppe Lorusso NSCL at Michigan State university.
DESPEC A Algora IFIC (Valencia) for the Ge array working group.
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
Development of a Segmented Planar Germanium Imaging Detector
FAIR (Facility for Antiproton and Ion Research) (Darmstadt, Germany) low-energy cave MeV/u fragmentation/fission ~1GeV/u fragment separator 350m.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Hidetada Baba Research Associate Computing and Network Team RIKEN Nishina Center.
Status of the Advanced Implantation Detector Array (AIDA) BRIKEN Collaboration Workshop Valencia, July 2015 Alfredo Estrade on behalf of the AIDA collaboration.
Jorge Agramunt Ros BRIKEN DAQ Status. DAQ Integration, tests and background measurements at RIKEN. Jorge Agramunt Ros 3º BRIKEN Workshop July 2015.
PJ Woods University of Edinburgh In-ring detector systems.
Useful information's on the site / equipment available at RIKEN for the BRIKEN project Gabor Gyula KISS RIKEN Nishina Center Radioactive Isotope Physics.
3 rd BRIKEN WORKSHOP: Welcome! 3 rd BRIKEN WORKSHOP, IFIC, Valencia 22-24/07/2015 C. Domingo-Pardo IFIC (CSIC-University of Valencia)
2 nd BRIKEN WORKSHOP: An Overview of the Project 2 nd BRIKEN WORKSHOP, RIKEN Nishina Center 30-31/07/2013 C. Domingo-Pardo IFIC (CSIC-University of Valencia)
AIDA: introduction Advanced Implantation Detector Array (AIDA) UK collaboration: University of Edinburgh, University of Liverpool, STFC Daresbury Laboratory.
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions Zhong Liu University of Edinburgh On behalf of the AIDA Collaboration (Edinburgh,
Off-line Event Building
Beam diagnostics from GSI
Proton emission from deformed rare earth nuclei: A possible AIDA physics campaign Paul Sapple PRESPEC Decay Physics Workshop Brighton 12 January 2011.
Study of Hypernuclei with Heavy Ion Beams (HypHI) at GSI Shizu Minami GSI, Germany on behalf of HypHI collaboration Introduction Phase 0 experiment R.
RIBF DAQ Hidetada Baba.
Strangeness Prospects with the CBM Experiment
Hybrid Pixel R&D and Interconnect Technologies
Status of the AGATA installation at GANIL
Status of 100Mo based DBD experiment
Luminosity Monitor Status
Status of the AGATA installation at GANIL
Decay spectroscopy with LaBr3(Ce) detectors at RIKEN and GSI
DSSSD for b decay investigations of heavy neutron-rich isotopes
SIGMA: a detector for γ-ray spectroscopy & imaging Dr Laura AGATA/GRETINA Collaboration Meeting
Possible Upgrades ToF readout Trigger Forward tracking
Theme group for b-delayed neutron measurements
Status of n-XYTER read-out chain at GSI
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions
AIDA: introduction Advanced Implantation Detector Array (AIDA)
Fixed Decay Station at ISOLDE
Local coordinator: S. Nishimura
The CMS Tracking Readout and Front End Driver Testing
AIDA Commisioning Test
Implantation detector as active stopper Rakesh Kumar, P. Doornenbal, I
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Presentation transcript:

Advanced Implantation Detector Array (AIDA) HISPEC/DESPEC meeting 26 September 2017 presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy The University of Edinburgh

AIDA: Current Status 98Kr Operational Commissioning tests (3x MSL type BB18-1000 DSSSDs) May 2015 First experiments (6x DSSSDs) June 2016 NP1306 Estrade et al., NP1512 Recchia et al. 98Kr Preliminary analysis courtesy Phong Vi

BRIKEN: Current Status High efficiency detector design (A. Tarifeno et al) Polyethylene moderator with ~160 3He counters Optionally include 2x HPGe clover detectors in close geometry Successfully installed July 2016 First commissioning tests 1-6, 7-8 and 24-30 November 2016 Experimental program commenced May-June 2017 30+ days approved beamtime (including AIDA+dTAS)

AIDA @ GSI AIDA hardware to be used for an internal spectrometer for storage ring 32+ AIDA FEE64 and support infrastructure delivered In discussion with CRYRING collaboration to develop multi-purpose, modular XUHV chamber for silicon detectors and gas jet target Possible to use this AIDA hardware for a DESPEC programme from 2018 (say) AIDA will provide 4x MSL type BB18(DS)-1000 DSSSDs (8cm x 8cm) to support FATIMA and dTAS experiments AIDA already has 2x MSL type BB18(DS)-1000 (24cm x 8cm) To Do Purchase AIDA DSSSDs Purchase DSSSD-FEE64 cabling and adaptors Design and fabricate new AIDA mechanical support assembly Upgrade AIDA MACB firmware to white rabbit – hardware tests at GSI in prep Timestamping & online analysis S4 layout

DAQ Correlation – October 2016 Timestamping DAQ Correlation – October 2016 AIDA Master MACB TRIGGER RIBF DAQ Trigger @ B3F TRIGGER 50MHz RESET RIBF LUPO @ F11 RIBF ADC @ F11 RESET TRIGGER 25MHz BRIKEN SIS3316 Digitizer BRIKEN SIS3820 Scaler BRIKEN SIS3100 VME Sequencer BRIKEN NIM clock BRIKEN BNC PB-5 Real-time DAQ synchronisation monitor developed

BRIKEN Data Analysis Pipeline Online Data Analysis BRIKEN Data Analysis Pipeline AIDA RAW DATA AIDA LuckyDoll (RIKEN; Phong) AIDAsort (Edin./CMU; Chris/Oscar, Neerajan) AIDA Root TTree Valencian Merger Tool (J.Agramunt et al.) BigRIPS RAW DATA BigRIPS Root TTree BigRIPS Anaroot (RIKEN; Matsui) BRIKEN RAW DATA BRIKEN Root TTree BRIKEN BRIKEN sort(?) (Valencia; Jorge, Alvaro) AIDA/BigRIPS/BRIKEN time-ordered data streams → merged, time-ordered derived data Courtesy Alfredo Estrade Vaz & Jorge Agramunt

Acknowledgements AIDA collaboration http://www2.ph.ed.ac.uk/~td/AIDA/welcome.html BRIKEN collaboration https://www.wiki.ed.ac.uk/display/BRIKEN/Home RIKEN Nishina Centre for Accelerator-Based Science S.Nishimura, G.Kiss, K.Matsui, P.Vi et al.

MSL type BB18 128 x 128 strips (16384 pixels) multi-guard ring 0.560mm strip pitch 1mm wafer thickness

MSL type BB18 384 x 128 strips (49152 pixels) multi-guard ring 0.560mm strip pitch 1mm wafer thickness

May 2015 Test: online DAQ synchronisation test Courtesy J.Agramunt, J.L.Tain

May 2015 Test: online DAQ synchronisation test Courtesy J.Agramunt, J.L.Tain

Accepted RIKEN Proposals Masses and b-decay properties of r-process nuclei around N=56 Estrade Vaz et al. Measurements of new beta-delayed neutron emission properties around doubly-magic 78Ni Rykaczewski, Tain, Grywacz, Dillman et al. BRIKEN Neutron Detector – Detector Construction Proposal BRIKEN collaboration Studies of r-process nuclei around A~100 Measurement of b-delayed neutron emission probabilities relevant to the A=130 r-process abundance peak Estrade Vaz, Lorusso, Montes et al.