Inter-Commission Coordination Group On WIGOS

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Advertisements

Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA VI Jochen Dibbern, RA-VI Focal Point WMO Regional Association.
RA-VI WG-TDI-3 RA-VI WORKING GROUP ON TECHNOLOGY DEVELOPMENT AND IMPLEMENTATION Report of the Chairman Jochen Dibbern Prague, Czech Republic, February.
World Meteorological Organization Working together in weather, climate and water Status of Regional WIGOS Implementation Plans and Challenges of the WIGOS.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
Overview of WIGOS activities in RA-IV Curaçao 2 December 2015.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in RA-VI Outcomes from RA-VI WIGOS Workshop Belgrade,
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
WORLD METEOROLOGICAL ORGANIZATION INTER-COMMISSION COORDINATION GROUP ON WIGOS (ICG-WIGOS-5) FIFTH SESSION José Arimatéa de Sousa Brito, Chair RA III WG-ITD.
WIS -WIGOS 21 deliverables and 39 activities are planned for for WIS and WIGOS.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Southeast Asia Primary Learning Metric (SEA-PLM) II CONSULTATIVE MEETING.
ICG-WIGOS-6 Report from the Commission for Basic Systems
Regional Association III
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
Monitoring Forest Resources for SFM in the UNECE Region
The Plan, Status and First Results
Concept Proposal for RA-III Regional WIGOS Centre
WIGOS Data Quality Monitoring System (WDQMS)
Regional WIGOS Centres
1st Session of the Task Team on WIGOS Data Quality Monitoring System
Ivan Čačić President RA VI
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
WIGOS Data Quality Monitoring System (WDQMS)
5th Session of the Task Team on WIGOS Metadata
(Dakar, Senegal, 28 – 30 September 2016)
Regional Basic Observing Network Concept
The Plan, Status and First Results
Sue Barrell, Bertrand Calpini
Regional WIGOS Centres
WIGOS Pre-operational Phase
Roadmap to Enhanced Technical Regulations of WMO
Regional WIGOS Center in RA VI
Documentation Overview
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS Project Office, WMO Secretariat
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Purpose of the Workshop President of RA VI (Europe)
Overview of the WMO Integrated Global Observing System (WIGOS)
Dr Sue Barrell, Australia
Inter-Commission Coordination Group On WIGOS
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
4.2 CLIMATE SERVICES, ACTION AND RESILIENCE
Co-chair Introduction
WDQMS NWP Pilot Project
Decisions and Recommendations for the
Flood Forecasting Initiative
Monitoring System (WDQMS)
Contributing to RWCs and RMICs
WMO Information System
Status of RA II WIS Implementation Plan
Status and Plan of Regional WIGOS Center (West Asia) in
WMO RA-II WIGOS Workshop Workshop summary and recommendations
WIGOS Pre-Operational Phase;
Guidance on WIGOS Data Partnerships Draft v1.0
Regional WIGOS Centre Tokyo
Proposed functionalities of RWC
WIGOS Implementation in Region IV
WIGOS regulatory and guidance material
Regional WIGOS Centre Plans of India
The WIGOS Pre-Operational Phase
WIGOS - Regional and National Implementation Planning
The status and Plan in 2019 for the WIGOS centers in RA II
Commission for Basic Systems, Technical Conference
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Inter-Commission Coordination Group On WIGOS Eightieth Session Geneva, Switzerland, 24-26 January 2019 ITEM: 4.5 INSTITUTO NACIONAL DE METEOROLOGIA Concept development and initial establishment of Regional WIGOS Centres (Regional Association III) RA-III WG-ITD

DIVISION OF RESPONSIBILITIES NEXT STEPS ASSISTANCE NEEDED SUMMARY OF THE PRESENTATION RA-III APROACH PROCESS AND PLANS DIVISION OF RESPONSIBILITIES NEXT STEPS ASSISTANCE NEEDED

PROCESS FOR THE ESTABLISHMENT OF RA-III WRC INITIAL PROPOSAL SUBMITTED BY THE CHAIR OF WG-ITD ENDORSEMENT OF THE CONCEPT BY RA III MANAGEMENT GROUP REVIEW BY GT-IDT , ESTABLISHMENT OF TASK TEAM AND DESIGNATION OF EXPERTS TT-WIGOS-RA3 CONCLUDED DRAFT PROPOSAL WORKING ONLINE AND DURING WIGOS WORKSHOP. PROPOSAL DISCUSSED WITH PRs DURING RA-III RECO PROPOSAL SUBMITTED AND APPROVED BY AR-III (SANTIAGO, NOVEMBER 2018)

APPROVED CONCEPT FOR RA III RWC (17TH RA-III, Santiago, Chile, November 2018) RA-III RWC Coordination Committee OPERATIONAL ORIENTED and TECHNICAL ORIENTED (Distribution of activities under discussion) BRAZIL ARGENTINA Mandatory functions and Optional functions Mandatory functions and Optional functions

GENERAL LIST OF RA-III RWC FUNCTIONS OPERATIONAL ASPECTS Regional WIGOS metadata management (OSCAR/Surface) Regional data monitoring & data quality management (WDQMS) Integration with DCPC Buenos Aires and GISC Brasilia Support to capacity development and training in the implementation of WIGOS Integration with operational networks (Hydrological, AMDAR) and others TECHNICAL ASPECTS Regional network management (network design and coordination), including RBON Assistance to national observing network management Linking WIGOS to external entities/establishing partnerships Assistance to and coordination of regional/sub-regional and national WIGOS projects CAPACITY BUILDING AND GOVERNANCE ASPECTS  Act as Regional information resource for Members concerning various aspects of WIGOS implementation Collect and document regional experience with WIGOS implementation and its benefits Collect and document regional technical issues with WIGOS implementations Review of the RWCs governance mechanism and relationship with regional working bodies and partners Coordination and cooperation with relevant bodies  

PRINCIPLES OF GOVERNANCE The proposed governance mechanism for the RA III RWCs is as follows: Each RA III RWC component will be autonomous, executing the assigned set of functions; Mandatory and optional functions will be assigned to each RWC component (in accordance with the Technical Guidance), meeting the needs and particularities of the Region; The RA III Management Group will designate and coordinate the work of the RWC Coordination Committee to be formed with experts from Brazil and Argentina; The RA III Management Group and the Coordination Committee will consolidate the Terms of Reference of each RWC component and of the Coordination Committee; The chair of the Coordination Committee will be selected on a rotation basis for a mandate of two years.

INITIAL IMPLEMENTATION ARGENTINA AND BRAZIL ARE DISCUSSING THE IMPLEMENTATION OF INITIAL ACTIVITIES: Regional WIGOS metadata management (work with data providers to facilitate collecting, updating and providing quality control of WIGOS metadata in OSCAR/Surface) Regional WIGOS performance monitoring and incident management (WIGOS Data Quality Monitoring System) and follow-up with data providers in case of data availability or data quality issues Selected support functions and governance

STEPS ON THE IMPLEMENTATION OF RA-III WRC CONTINUE DISCUSSIONS ON SPECIFIC TASKS FOR ARGENTINA AND BRASIL (FEB-MAY 2019) GT-IDT PROPOSAL TO RA-III MANAGEMENT GROUP (JUN 2019) RA-III MG ASSIGN RESPONSIBILITIES TO BOTH COUNTRIES (JUNE 2019) IMPLEMENTATION OF INITIAL ACTIVITIES (JULY 2019) BEGINNING OF THE TRANSITION PROCESS FROM PILOT TO OPERATIONAL MODE (DECEMBER 2019) INCORPORATION OF ADDITIONAL FUNCTIONS: BEGINNING 2020

ASSISTANCE NEEDED FROM RA-III MEMBERS: PR´s continuous commitment More engagement of middle managers in NMHSs Designation of pro-active WIGOS/OSCAR focal points Identification of national and regional champions (experts) Participation in WIGOS Seminars and Workshops FROM THE SECRETARIAT: Limited support for coordination meetings Targeted Seminars and Workshops

Thank you!