Stakeholder Engagement

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Strategic Environmental Assessment: Methodology Mary M. Matthews, Ph.D. SEA Consultant for European Delegation.
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Administrative burden in Impact Assessments for Commission proposals November 2012 – February 2013 Dr. Marianne Klingbeil Deputy Secretary General European.
Project Appraisal Module 5 Session 6.
GHANA CLIMATE CHANGE IMPACTS Seven (7) REDD+ demonstration (pilot) projects have been selected across the country for implementation. Terms of Reference.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
Project Detailed Business Case
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Valuing Nature Campaigns. Communicating the benefits of Mexico’s protected areas Studied the goods and services provided by the country’s protected areas.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.
Planning for sustainable buildings MAV Environment Conference 2014 Thursday 1 May 2014 Elizabeth BrantAndrea Skraba Yarra City CouncilWhitehorse City Council.
Marine Planning: The role of the MMO and Partnerships Steve Brooker Head of Marine Planning.
Ecosystem Services & their Role in Poverty Alleviation in Suynik Province, Armenia Armenia.
Fairfield Local Government Area has over businesses, with some of the largest industrial estates in Australia. Sustain ‘n’ Save is a voluntary ‘partnership’
Severn Tidal Power Feasibility Study Severn Estuary Forum 2009 Juliet Austin – Environmental workstream lead, STP study, Department of Energy & Climate.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Guidelines for Impact and Adaptation Assessment Design versus Implementation Issues RICHARD J.T. KLEIN POTSDAM INSTITUTE FOR CLIMATE IMPACT RESEARCH (PIK)
Consultation on River Basin Planning Guidance Volume 2 and the updated WFD Impact Assessment Rory Wallace WFD Implementation.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Federal Aviation Administration NextGen Environmental Management System (EMS)
New Brunswick Energy Policy Overview June 23, 2015.
Background very brief summing up of the NSS conclusions Background very brief summing up of the NSS conclusions Dr. Elewa.
APPROACHES TO REGULATORY AND ADMINISTRATIVE REFORM Regulatory Impact Assessments: Case study from Uganda.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Economic, Social and Environmental Benefits Better Planning and Operational Decisions in Water Management Decision Making Capacity and Institutions; Stakeholder.
Project management Topic 4 Business Case.
Arctic Connections Policy frameworks for regional co-operation TOWARDS AN EU POLICY and the ARCTIC INFORMATION CENTRE INITIATIVE Jaime Reynolds DG Environment.
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
Planning Scotland’s Seas consultation Seas Consultation 2013.
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Better regulation in the Commission Jonathon Stoodley Head of Unit C.1 Evaluation, Regulatory Fitness and Performance Secretariat General of the European.
Regional Sediment Management Policy and Implementation Workshop April, 2009.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
ISO Session 3 Environmental Management and Ethics in Management.
JSGS Professional Workshop Series Copyright ©Heather McWhinney, 2016 WRITING A CABINET DECISION ITEM.
Haida Gwaii Community Electricity Plan
East Coast utility EV Initiative
New EGNRET Concept Notes
Monitoring & Evaluation Processes A A walkthrough of the whole process
Rights and Interests Program
Module 8 : Implementing Port Reform
GIFT and IBP Pilot PROJECT on PUBLIC PARTICIPATION
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
QUALITY DEVELOPMENT IN COLOMBIA AND LATIN AMERICAN
Severn Tidal Power Feasibility Study
Module 5 The Climate Expert and your role as a consultant
Addressing fish barriers
Guidance on application of Article 4.7
Progress of the preparations for a White Paper on Adaptation to Climate Change Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit.
GCF business model.
Severn Tidal Power Sustainable Development and Severn Tidal Power
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
‘BOAT CHART’ PROJECT WORKPLAN
REGULATORY IMPACT ANALYSIS: COMPARING BENEFITS AND COSTS
Global SNA Implementation Strategy
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Kateřina Fialková, Director,
European Commission, DG Environment, Marine Unit
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Data for Fisheries Management
Water economics State-of-play of ongoing studies Lie Heymans
Presentation transcript:

Stakeholder Engagement SEVERN TIDAL POWER FEASIBILITY STUDY – INDICATIVE HIGH LEVEL WORKPLAN 2008 2009 2010 Internal stop/continue review points Policy analysis - Stage 1 High level consideration : economic issues (costs, possible subsidy mechanism, energy market impact, ownership structure, Government role); environmental issues including regulatory compliance; regional social and economic impacts including on ports in the Severn; engineering and technical issues etc Policy analysis – Stage 2 Detailed issues analysis; cost benefit analysis and assessment against alternative investments in low carbon energy; initial work on planning and consents; scoping of implementation phases etc Public Consultation High level evidence analysis and Government recommendations Question: should Government support a Severn Tidal Power project and if so on what terms? Consideration of responses and Government Decision Strategic Environment Assessment – Scoping Stage Activities - High level assessment of options for tidal power development in the Severn estuary - Collect information for environmental baseline and decide on approach to be used for data gathering and analysis etc Strategic Environment Assessment – Data Gathering and Analysis Activities - Survey, consultation and assessment processes Commission additional related studies as needed - Stakeholder workshop meetings etc Stakeholder Engagement