BOX PUSHING TECHNOLOGY

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Excavation Lesson 3 M. S. Martin Sept De - Watering The removal of ground water and / or accumulated rainwater from within excavations or earthworks.
Measurement for Civil Engineering works
Chp12- Footings.
Concrete Box Culverts (CBC)
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
TEQIP-II Institutions
PIPE CULVERT By CH. VENKATARAMAIAH.
WEAR OF RAILS Engr. Muhammad Hussain.
Split Sole 45 Degree Raker
Tunnelling Methods.
OSHAX.org - The Unofficial Guide to the OSHA
GROUNDWATER CONTROL.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Jute Geotextile – Potential and Application in Road Works
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
At-Grade Intersection
CONSTRUCTION.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
1 Pertemuan 07 GEOTEKNIK Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
Reinforced Concrete Design II
Bridge Engineering (4) Foundations – Caisson Foundations 1. *Caisson foundations 1.1 IntroductionIntroduction A caisson is basically a structure.
TRENCHLESS TECHNOLOGY
Chapter 2b Foundations Shallow & Deep Foundations.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
Folded Plate Bridge: Steel Alternative for Short Span Bridges Maury Tayarani Accelerated Bridge Program MassDOT.
Plain & Reinforced Concrete-1 CE-313
ROAD WITHOUT DRAIN A GREAT DISASTER - A case Study By Er. Nandanandan Das Ex. E.I.C cum Secretary, Works, Govt. Of Odisha 1.
Bridge Engineering (5) Substructure – Abutments and Piers
BOX JACKING. EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is.
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Highway Subgrade (1) Introduction
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
OSHA Office of Training and Education
Project work For Integrated Course No Presented By Sri M. K.Chattopadhyay AEN/HQ/ Fairlie place /E Rly /Kolkata Sri N.C.Mondal ADEN/ Works/ Nagpur.
PRESENTED BY- Namrata M. Lolge (09CM16F) M. Tech. 1 st sem NITK.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
CAISSON FOUNDATION.
FOUNDATIONS.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
WEAR OF RAILS. TYPES 1. Wear on head of rail 2. Wear on ends of rail 3. Wear of rail on curve.
Leads Institute of Technology & Engineering
DESIGN AND CONSTRUCTION GUIDELINES
Concrete Box Culverts (CBC)
Concrete Repair.
Investigation of Road Project By S.N. Nanaware
BOX JACKING.
{Graduation Project} An-Najah National University
Investigation of Road Project
Building Planning and Drawing
Bridge engineering.
Objectives Upon completion of this module you should be able to:
CEN 180: Civil Engineering Drawing II
B.V.Patel Institute of Technology-Diploma studies
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Jute Padding 1974 TCS before removal
Course Contents Culverts Bridges Buildings 20 November 2018.
WEAR OF RAILS.
Arch205 building construction floor & Roof systems
Govt. Polytechnic,Manesar
What is CONCRETE SLUMP TEST –
ActivRACTM 30P Mobilized Storage System
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
By :Dr. Aeid A. Abdulrazeg
Geometric design of Highways
STANDING WATER FOOTBRIDGE
Well Foundations Dr.K.V.Krishna Reddy.
Presentation transcript:

BOX PUSHING TECHNOLOGY By - Akshit Rajan

Conventional method Open cut system Demerits Excavation Placing Covering Demerits Increased time for execution Interruption in traffic Cost factor was high

NEED FOR THE ALTERNATIVE Present day Intensity of Traffic, both Rail & Road due to the fast development, is very heavy it cannot the disturbed, for construction of under bridges or Canal Crossings, drainage etc by conventional i.e. open cut system. Box Pushing Technique is developed where in R.C.C. Boxes in segments are cast out side and pushed through the heavy embankments of Rail or Road by Jacking.

METHODOLOGY Excavation Casting of Thrust Bed Fabrication of Front and Rear shield Box Casting and placing Pushing-shifting-pushing operation Miscellaneous works Precautions

Excavation and casting of Thrust Bed Open excavation is carried out for construction of Thrust bed

Fabrication of Front Shield It is fabricated for cutting action and to provide support , to prevent caving in of soil.

Fabrication of Rear Shield It is provided by anchoring steel plates on the face of bottom slab of RCC box to suitably distribute the jacking load.

Box Casting And Pushing The RCC Box is cast in segments of convenient lengths of Total pushing length. The Box section is designed as per IRS / IRC codes of practice for loading. Concrete grade normally kept as M- 35.  

Precautions Cutting edge of front shield is fabricated with adequate thickness of steel plate and the front edges of the steel plate are sharpened to facilitate penetration into the soil. To prevent caving of earth during excavation quantity of earth shall be removed to barest minimum duly following the slop of cutting edge. Guide channels to be provided in the thrust bed to guide the segments to ensure straight alignment The level of the boxes should be continuously checked. The Speed limit should be set to 20 km/h At the site of construction The work should be stopped when a train is passing over the work.

Photo Gallery

THANK YOU