Gas Customer Forum 28 July 2008

Slides:



Advertisements
Similar presentations
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Advertisements

UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Code Governance Review Major Policy reform Proposals Gas Customer Forum 26 January 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
European Developments Transmission Workgroup 3 rd May 2012.
Modification Proposal 0283 Update
EU Implementation Programme
Review of System Alerts
Transmission Planning Code – Draft Document
Review of UNC Section Q “Emergencies”
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
SO Incentives Consultation
Transmission Planning Code
Introduction of Code Contingency Guidelines Document
- GDP 2011 versus 2010 – increase by 5.5%
Transmission Planning Code
SO Incentives from April 2010
UNC Trader User – Licence obligations
Gas SO Incentives from April 2010
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
DSC ChMC CSS update 8th August 2018
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Publication of Zonal Flex Data
Consideration of issues raised by UNC Modification Proposal 0244
Update on Exit Capacity Substitution and Revision
Enduring NTS Exit Capacity Arrangements - Update
Rebecca Hailes For 15 March 2018
Transmission Planning Code Review
Gas SO Incentives Rollover
QSEC auction timetable
Flow Swaps at NTS / LDZ offtakes
Introduction of Code Contingency Guidelines Document
Proposed Environmental Incentive
PARCA Timeline.
Proposed Transitional Gas Exit Arrangements
Proposed Changes to UNC Section O
EU Developments.
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Reinstatement of NTS Interruption
Generic Revenue Driver Methodology
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
Transmission Workgroup July 2012
Incremental Entry Capacity Release Methodology Statement
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Data Enhancement Project - Update
2015 January February March April May June July August September
Presentation transcript:

Gas Customer Forum 28 July 2008 Transmission Update Gas Customer Forum 28 July 2008

Updates Ofgem Exit Reform Impact Assessment TBE process Transmission Planning Code

Exit Reform Impact Assessment Ofgem Workshop 22 July 2008

Exit Reform Impact Assessment Ofgem published its initial impact assessment on Offtake Arrangements on 21 July 2008 The IA covers all seven UNC modification proposals Ofgem held a workshop to discuss the impact assessment on 22 July Responses to the IA document are due by 29 August 2008 Ofgem are seeking an Authority decision on implementation by 30 November 2008 Implementation to be effective from April 2009 IA document and presentation available on Ofgem’s website www.ofgem.gov.uk/Networks/Trans/GasTransPolicy/offrev/Pages/offrev.aspx

TBE 2008 Update

TBE 2008 Update TBE Summer Event well attended Copies of “Development of NTS Investment Scenarios” document and presentation material is available on our website http://www.nationalgrid.com/uk/Gas/OperationalInfo/TBE/ Deadline for consultation feedback on document is 10 August 2008 Any feedback on the event or process welcome, please email gary.dolphin@uk.ngrid.com

Transmission Planning Code update

Transmission Planning Code Framework document relating to the planning and development of the NTS Contains methodology to determine the physical capability of the NTS Detailed supply/demand assumptions National Grid must comply with and maintain the code We must review and undertake consultation process at least every 2 years Modifications must be approved by the Authority

Update & Next Steps TPC due to be implemented from 1 October 2008 Requires Ofgem approval prior to implementation Series of workshops held in April, May, June & July Industry consultation published 11 July 2008 www.gasgovernance.com/Code/Workstreams/TransmissionWorkstream/2008Meetings/ Responses due 15 August 2008 Please send to ntsinvestment@uk.ngrid.com