EST 70m Polar Ice-class 5 Ocean Oil Skimmer Ship.

Slides:



Advertisements
Similar presentations
The Oil Pollution Act of 1990 A National Law By: Jordan Conger.
Advertisements

0 SPANISH MARITIME SAFETY AGENCY SASEMAR 8th MCMP, March 2005.
The Monza Fast Patrol Attack Craft Model MPA-17 From Marine Industries Plc. Marine Industries Plc is a public limited company incorporated June 2013 and.
SeaCycler AST2 Surface Piercing Profiler Technology.
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT ww.osh-project.org Oil Recovery Systems.
Why it Happened? On April 20, 2010, the oil rig Deep water Horizon had a dire malfunction. Both its manual and emergency blowout preventers failed to.
On April 20, 2010, an explosion on the Deepwater Horizon oil platform in the Gulf of Mexico led to the worst oil spill in United States history. An.
Started the 20th April Capped 15th July Permanently sealed 20th September.
Marine Coatings All products supplied and technical advice or recommendations given are subject to our standard Conditions of Sale. Intershield ® 163 Inerta.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
EST 70m Polar Ice-class 5 Ocean Oil Skimmer Ship.
Exxon Valdez Oil Spill Response Oil Spill Response 25 Years After the Exxon Valdez and in the Wake of Deepwater Horizon University of New Hampshire Center.
Ship’s measurement Lesson 3.
Managing the Environmental Challenge 1 Gateway to Asia Conference November 2014.
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
Growth that doesn’t cost the earth. Renewable Energy.
PART SIX Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be.
Unit 4: Primary Resources Energy from the Oceans.
Oil Spills: The Underwater Crisis
Question: What will happen if you pour oil into water? Why?
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
Measuring Sea Level Change
Copyright Coast Guard Auxiliary Association, Inc.
SHELL ALASKA Program Update March 2015.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
AUSTRALIA. Tidal Barrage Company/Organization – CleanTechCom, Woodshed Technologies Technology/Plant Name - Tidal Delay Technology Genre - Tidal Barrage.
5.3.1Analyze the risk associated with offshore oil production The offshore oil industry accounts for 29% of reported oil releases/spills. P Oil.
U.S. Coast Guard Unclassified
Pág. 1 Presentación Corporativa CTN. © CNT 2009 WS5- Blue economy in the maritime sector: innovation & technology in marine- maritime industries Conclusions.
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org Introduction to.
Ancillary Services UNIT 10.
AquaRET 2 LEONARDO DA VINCI - Transfer of Innovation AquaRET 2 Online Survey results Bilbao, 05/10/2010 E. Mavrou Environmental Scientist, MSc CRES - Greece.
BY CHRISTOPHER. FACTFILE  Main port: Sullom Voe (Shetland) (oil terminal).  Oil vessels: Oil rig  Supply vehicles: Bristow helicopters and oil supply.
Pollution prevention preparedness and response Kristján Geirsson Environment Agency of Iceland EPPR-meeting 10 Nov
1990 AMENDED IN DECEMBER. 29, 2000 TULLY BURGOON Oil Pollution Act (OPA)
Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be offset.
The Oil Pollution Act of 1990 By: Kevin Lee (Period 1) Name: Oil Pollution Act (OPA) Draft Year: 1990 Amendment Year: Never Amended International / National.
By: Makenna Kressley.  It comes from inside the earth  It is made out of fossils Fossils- dead plants and animals.
Progress Report of the Russian Federation Project 2013 “Development of Safety Systems in Implementation of Economic and Infrastructural Projects in the.
Measuring Sea Level Change NSF DRL What is sea level? Or should we say what is mean sea level?
Main Channel Columbia River Channel is filled in to an unknown level with debris & sediment to mile 18 and maybe more. The Columbia River Jetty’s have.
Innovation quality reliability Komara 7 Skimmer System (Formally Komara Mini) December 2015.
Objective: Clean a simulated oil spill and evaluate methods. Catalyst: What steps in the Jardine filtration process might be effective in preventing oil.
Innovation quality reliability Vikoma Vikoflex Boom System December 2015.
The Oil Pollution Act of 1990 Year Drafted: 1989 Year Amended: 1990 National Act Lawrence Jiang Period 1.
 Solar Energy is renewable energy that is powered by the sun.  Solar energy can be converted into other forms, such as heat and electricity.
Oil Spills on Land and Water. Land Oil Spill – Much of marine oil pollution comes from oil spills on land – 12 spills per 4000 L are reported in Canada.
Innovation quality reliability Vikoma Bulkhead Boom System December 2015.
Innovation quality reliability Successful Containment During Ship to Ship Operations Peter Hoyle November 2015.
Innovation quality reliability Vikoma MOSS Skimmer System (Multi Oil Skimming System) December 2015.
Regional Response Team IX Quarterly Meeting November 5, 2014.
(Formally Kormara Midi)
Innovation quality reliability Vikoma Neoprene Shoreguardian Boom System December 2015.
Improving California’s Oil Spill Prevention & Response A Summary of Senate Bill 414 Amy Trainer, Executive Director Environmental Action Committee of West.
Innovation quality reliability Delta Skimmer System December 2015.
Tsunami. The name ‘tsunami’ is Japanese. It means harbor wave. Tsunamis used to be called tidal waves, but they actually have nothing to do with the tides.
AIS/WX Project Disseminating Environmental Information to Mariners via AIS Technology Bill Benning Chief Technology Officer Marine Exchange of Alaska.
Spill Containment Methods
Systems Model and Offshore Oil
THE OIL SEA HARVESTER SYSTEM :
Oil Spills.
FlexfloTM Surge Relievers
Energy and the Environment
Welcome to Globodyne Industries
A.I. and the Automation of Oil Clean Up
NAVSEA SUPSALV Mission
9.0 Getting Started What’s the secret to making good popcorn?
The Oil Pollution Act of 1990 (OPA)
The Oil Pollution Act of 1990
Methods of Oil Spill Cleanups
Presentation transcript:

EST 70m Polar Ice-class 5 Ocean Oil Skimmer Ship

Preventing catastrophic damage The key to preventing catastrophic damage and liability in a marine environment is a very fast and effective cleanup response in rough seas and dynamic ice. Extreme Spill Technology (EST), a Canadian company, has developed this ability and now manufactures a line of ocean-going skimmer vessels. Our 12m coastal skimmer is currently under construction for the Canadian Coast Guard.

A word about EST In 2011 EST won the Ocean Environmental Protection Award presented in London at the Sustainable Shipping Awards ceremony. EST was chosen in the first round under the Canadian Innovation Commercialization Program. EST is a shareholder in a Canadian-run, HK boatbuilding company that manufactures vessels to ABS standards. These vessels contain the EST system. The EST technology is manufactured 100% in Canada.

The ocean-going FAST 25.0m

Details on the FAST 25.0m This high-speed (30+ kts), Canadian design can recover oil in very high seas. It incorporates the proprietary EST oil recovery system. The FAST 25.0m is an excellent patrol, standby, rescue, firefighting and oil spill vessel. The 15,000 litres per minute oil transfer pumping system can also pump water with no conversion needed (firefighting) Capable of crossing any ocean in any season it only needs 1.5 m of water, which allows use in deltas etc.

The oil rig supply vessel or escort tug with EST oil recovery barges

The EST oil spill system

How it works A vacuum pump on top fills the sealed, oil-trapping tower with water, like a straw sucking up a drink. The vessel then drives over the oil slick and the floating oil slides under the vessels flat bottom. When the submerged oil reaches the underwater opening of the oil tower it floats upwardly to the top of the tower. When enough oil accumulates in the upper region of the sealed tower, sensors activate an oil transfer pump.

No moving parts, no close tolerances and built like a tank

Similar to the Lamor JBF-DIP

But much improved…………….. The JBF needs a conveyor belt and bow V-sweeps. These devices limit the working speed and are easily disrupted by wave impact, ice and oil entrainment. With close tolerances and delicate features, they are prone to breakdown. Maintenance is high. EST has no need of conveyor belts, bow V-sweeps, rotating brushes, discs and drums etc. ESTs system is rugged and simple!

Tank-testing ESTs prototype HITT skimmer for BP in Alabama in 2010

Tank-testing an EST model with bunker C for Altinex ASA in 2006

And for the Arctic…………………….

You need ESTs Polar Ice-class 5 oil skimmer ship, not light equipment

The EST Arctic oil skimmer ship 70m x 23m with a 5m draft This vessel can skim for oil at 4 kts It stores 2900 cubic metres of recovered oil Its a multifunctional ship It can steam at 2 kts in level, first-year ice It can stay on-station cleaning oil for 30 days It has accommodations for 12 extra persons

Success requires new thinking

EST _ built for Canadian seas