ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.

Slides:



Advertisements
Similar presentations
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
André Augustinus 16 June 2003 DCS Workshop Safety.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
D etector C ontrol S ystem HMPID SB G. De Cataldo CERN-CH, A. Franco & A. Nardulli INFN Bari, I 1 HMPID Updates and prototyping HMPID DCS with.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
TPC-Meeting : Københaven Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
11/03/2003LHC GCS - JCOP ER1 LHC GCS Renaud Barillère – CERN IT-CO.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Chiller control system Lukasz Zwalinski – PH/DT.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
60kW Thermosiphon control system
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Alice TOF Production Readiness Review Gas Control Systems.
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
TPC Detector Control System
Presentation transcript:

ALICE TPC Ne/CO2 Gas System

Mixing Rack

CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack

Pumping and Storing Rack

Gas system Racks : Getting ready Individually PLC-controlled --> connect functionality

CO 2 - Purging Mode

Ne/CO 2 - Running Mode

User interface panels for ALICE TPC gas control system PVSS Prepared by IT/CO team under R.Barillere First panel prototypes are available

PVSS Pumping module PVSS Mixer module

Purifier module Purifier column sub-panel

TPC Gas Controls Milestones First versions of all necessary PLC modules available by the end of With this we can operate individual racks, test and hardware --> debug them… Full PVSS version by Q (dependant on UNICOS library updates) Full test of gas system + controls on test volume by Q2 2003

Connection: Gas System --> DCS Parameter list: (T, P) --> in, out, compressor, - cleaning, supply bottles, (O 2, H 2 O)--> in, out, Ne/CO 2 --> mixer V_drift--> Goofie

Goofie Drift Velocity Monitor 2 monitors In cave T_stabilized P = TPC Vdrift = in & out G G

Goofie Control Card: Preamplifiers shapers Digitizer : Altro - veccio Profibus Controller Applicom --> Labview --> Analysis

Goofie Control Status : Detector--> PT ready Card layout --> ready Mounting--> pending Plc-programming --> pending Labview Analysis--> On to do list DCS connection--> Go to to do list

Summary : TPC Gas System Hardware ready --> end 2002 Local Control--> end 2002 PVSS controlled--> mid 2003 PVSS - DCS--> end 2003 Goofie--> ???