Describe measures that will be used to place and finish concrete within the requirements of By-Law Number N-200 – Respecting Noise and minimize effects.

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Trying to get the shingling finished in a snowstorm.
Click to edit Master title style The Adkins Project … and the third little pig made his home from concrete treated with FIBERMESH ®. No huffing and puffing.
Measuring Concrete Work
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
Skyscraper Construction
5. HEAVY TIMBER FRAME CONSTRUCTION
Evaluate area for vertical shore placement and determine length for header and sole. Header and sole will utilize 12” O.H. for outside vertical posts and.
Johanna Mikitka AE-390 October 13, 2004
1 South Slough Bridge # APWA National Project of the Year Transportation Category, Projects Less Than $2 million.
Presentation to Maxwell Place Homeowners Association 1.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
UO Lewis Integrative Science Building CUG Meeting - Schematic Design Wednesday, October 7.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
University Health Building Thesis Final Presentation
School of the Built Environment Construction Technology D19SC Unit 4 SUBSTRUCTURE DESIGN – WALLS FLOORS & BASEMENTS 1 Unit 4 SUBSTRUCTURE DESIGN - FLOORS,
2001 Winter Presentation. Site Location Site View.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Site # Former Motorola Facility Harvard, Illinois 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:
Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Snow Measurements NOAA/NWS Current Standard Observing Practices ASOS, Snow Paid and Snow Spotters NOAA/NWS Current Standard Observing Practices ASOS, Snow.
Book 1: Chapter 4 Control of the Oil Movements. Objectives After reading the chapter and reviewing the materials presented the students will be able to:
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
Light Wood Frame Construction
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Co-Housing Design Project in Point St. Charles Krys Wodzicki # Design Project I Professor P. Sijpkes April 18th, 2000.
Plastic Shrinkage Cracking How to make sure it happens!
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Brad Oliver – Structural Option Advisor – Professor Memari.
A Prefabricated Framing and Enclosure System. The Problem.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
North Augusta High School Design Development Presentation.
Week 6 Timber based columns
Safe by Design Safe by Design Operation Maintenance and Repair
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
North Hall | American University| Washington D.C.
Prepared by Kim Randall Development Officer Hastoe House Association
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Design of a Commercial Shopping Center
Common Structural Forms
Dalston Lane, Hackney Wayne Yeomans – B&K Structures
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
Minuteman Vocational Technical Regional High School Progress
Value of contract: Length of contract: Contract start date:
TCU-PROJECT: 7TH Semester Course
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Masonry Bearing Walls.
North Augusta High School – Phase 2A and 2B
Presentation transcript:

Describe measures that will be used to place and finish concrete within the requirements of By-Law Number N-200 – Respecting Noise and minimize effects on neighbours Review schedule of concrete placements

Attempt for an early morning start time within the by-law requirements Goal is to get concrete in early so that it sets up early to allow finishing to start and be completed earlier. If necessary, could be started later in the day to accommodate weather forecasts, inspections, etc.

Sequence slab placements in a south to north direction to provide a buffer between work and South Street after initial placement.

Place slab in thirds to cut down on the volume of concrete to be placed and finished

Plywood barrier approximately 4 feet high erected to cut down on wind and sound transmission.

Lights when required to be directed away from South and LeMarchant Streets.

Money to be spent on admixture additives placed in the concrete to shorten set time

Traditional method with tower crane on site is to use concrete bucket for slab placements which is time consuming.

Slabs to be placed using a concrete pump which will increase the rate that the concrete is placed.

Supplement concrete pump with deck placer from level 3 to roof. Articulating arm eliminates need to drag hoses over slab increasing placement rate.

When concrete placements occur, Aecon site office will be open and personnel can be contacted at Estimated 26 slab placements to occur First placement scheduled is basement slab on grade in mid-May 3 placements every 2 weeks once level 3 slab is completed and typical floors start Completion of concrete work scheduled for early November