CIS 480 Systems Analysis and Design

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

1 After completing this lesson, you will be able to: Compose, address, and send messages. Format the body of a message. Attach a file to a message. Check.
1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
How To Use Google Forms to Create A Test Quick Easy Self-Graded!! Instant Reports.
Precedence Diagramming
Projmgmt-1/12 Depaul University Scheduling Tasks In MicroSoft Project Instructor: David A. Lash.
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
CP Chapter 4 Schedule Planning.
Project Management from Simple to Complex
Management Information Systems [MOIS470]
Project Scheduling: Lagging, Crashing, and Activity Networks
TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
Integration Integrating Word, Excel, Access, and PowerPoint
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Addition 1’s to 20.
Excel Lesson 12 Creating PivotTables and PivotCharts Microsoft Office 2010 Advanced Cable / Morrison 1.
MIS 460 ( PM in IT ) 1 MICROSOFT PROJECT Instructor SARTAJ FATIMA.
OPSM 639, C. Akkan Before starting this section SAVE AS YOUR EXISTING MS PROJECT FILE AS -part3-1 -part3-1.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Microsoft Project.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Dr. Neal CIS 480 MS Project Concepts Dr. Greg Neal CIS 480 Systems Analysis and Design.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
ELC 347 DAY 2. Agenda Questions Working with MS Project 2003 Making a PB & J Sandwich.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
OPSM 639, C. Akkan1 OPSM 639 Project Management Introduction to Microsoft Project - Part 2: Developing a Network Plan.
Microsoft Project Presentation By Corey Johnson 10/11/00.
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Chapter 6 Introduction to Microsoft Project
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
PROJECT MANAGEMENT 3RD YEAR UNDERGRADUATE UNIT U13451 PRMAN DL Tutor: Kathy Parker WEEK FIVE Adapted from slides by Dr Philip J. Scott MSc PhD FBCS CITP.
A tutorial on MS Project James Burns. Outline  Setting up MS Project  Defining Tasks (activity definition)  Activity Subordination (WBS)  Activity.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
Microsoft Project Tutorial Jesal Bhuta
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
A tutorial on MS Project James Burns. 22 Learning Objectives  Entering Tasks in the Gantt View  Task subordination  Linking of Tasks  Setting start.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
1 Microsoft Project 2010 Demo Part 2. 2 Problem 2.8: Enter Tasks Enter tasks and times for problem 2.8. Be sure to click Project/Project Information to.
Managing the Information Systems Project Cont’d
WHAT IS A GANTT CHART.
Software project mgt. session # 3– lab manual.
A tutorial on MS Project
CHAPTER 6 PROJECT TIME MANAGEMENT
MS Project 2016 Level II
ENGINEERING MANAGEMENT (GE 404)
Guide to Project.
Software project mgt. session # 3– lab manual.
Microsoft Project 2007 Demo Part 1
ENGINEERING MANAGEMENT (GE 404)
Entering the Task List Dr. George.
Microsoft Project 2007 Demo Part 2
CHAPTER 6 PROJECT TIME MANAGEMENT
Microsoft Project 2013 Demo Part 2
Presentation transcript:

CIS 480 Systems Analysis and Design MS Project Concepts CIS 480 Systems Analysis and Design Dr. Morgan CIS 480

Outline Project Configuration Creating tasks Creating dependencies Setting the project start date Setting the calendar Creating tasks Task Summary task Milestone task Creating dependencies Type of dependency Calculation of slack time Gantt Chart Pert Network Dr. Morgan CIS 480

A Standard calendar has weekends off Setting Up the Project A Standard calendar has weekends off Project->Project Information… Project Start date Dr. Morgan CIS 480

Creating a Task Type in the task name Adjust the task duration The start and finish are calculated based on the project start Date and dependencies Type in the task name Adjust the task duration Dr. Morgan CIS 480

Creating a Summary Task Use pointer to rearrange tasks Note summary task shown in black Use double ended arrow to subordinate tasks Dr. Morgan CIS 480

Milestones have zero duration Creating a Milestone Milestones have zero duration Make milestone Dr. Morgan CIS 480

Task Dependencies Finish-to-Start (FS) Start-to-Start (SS) Task B cannot start until task A finishes (most common) Start-to-Start (SS) Task B cannot start until task A starts (both start the same time) Finish-to-Finish (FF) Task B cannot finish until task A finishes (both finish at the same time) Start-to-Finish (SF) Task B cannot finish until task A starts Dr. Morgan CIS 480

Dependency Gantt Examples FinishStart(FS) StartStart(SS) StartFinish(SF) FinishFinish(FF) Dr. Morgan CIS 480

Lead and Lag Dependencies 1 day Lag 1 day Lead Dr. Morgan CIS 480

Adding Dependencies Dr. Morgan CIS 480

Detail Dependency Information Setting for dependency type and lag Dr. Morgan CIS 480

Adding Display Columns Right click on a column heading to add a new column of data before it Select the column you want to add to the display and click OK Dr. Morgan CIS 480

Understanding Calculations Take the following project with the predecessors (dependencies) listed Dr. Morgan CIS 480

How are Calculations Performed? Early Start times are determined by a forward pass analyzing the predecessor. The calendar is used to skip the weekends. Late Start is determine by looking at the end finish date and making a backward pass to calculate when the latest time the task can start without effecting the project timeline. Slack Time is the difference between early start and late start Dr. Morgan CIS 480

Task List A difference between Early-start and late-start Indicates slack time Slack Difference Early-Late Late Start Early Start Critical Path Dr. Morgan CIS 480

1,2 & 3 all start at beginning Gantt Chart 1,2 & 3 all start at beginning 3 7 9 Note the predecessors Dr. Morgan CIS 480

Calculation of EarlyStart, LateStart,Slack Task 9 has predecessor of 7 and 7 has predecessor of 3 Calculation of EarlyStart, LateStart,Slack Task Three (3 days) EarlyStart (Project Start on 6/1/06) LateStart = Task 7 LateStart – Task 3 duration: 6/2/06 Task Seven (6 days) Task 7 StartFinish predecessor of Task 3 EarlyStart =Task 3 Finish 6/5/06 + 1 day: 6/6/06 LateStart = Task 9 LateStart – Task 7 duration: 6/7/06 Task Nine (3 days) Task 9 StartFinish predecessor of Task 7 EarlyStart = Task 7 Finish 6/13/06 + 1 day: 6/14/06 LateStart = Task 10 Start – 3 days: 6/15/06 Forward Calculation Slack 1 day Backward Calculation Dr. Morgan CIS 480

Red task boxes represent the critical path Pert Network View->Network Diagram Red task boxes represent the critical path Dr. Morgan CIS 480

Working Backward from a Completion Date from Project Menu select - Project Information In dialog box pick schedule from Project Finish Date Enter the target finish date Dr. Morgan CIS 480

Highlighting the Critical Path From the Format Menu select the Check the Critical Tasks Check box Dr. Morgan CIS 480

Creating and Assigning Resources Select the Resources main menu choice and click on the Assign Resources Tab Double click on new resource on the dialog box that appears. Dr. Morgan CIS 480

Creating and Assigning Resources (Continued) Add your resources name and any other appropriate information on the general tab, Move to the costs tab and enter at least a standard rate and look at the other options The Notes tab is used for any descriptive info needed,: about skill sets, etc. When finished click OK to save Repeat for as many resources as you will be using for the project. Dr. Morgan CIS 480

Creating and Assigning Resources (Continued) With the assign resources dialog displayed Click on a task on the Gantt chart You are now ready to assign resources to the selected task. The R/D column stands for Request/Demand and those are the 2 choices The Units column allows you to specify the percentage of effort of the resource that will be allocated to the task You do not fill in the cost column that value is calculated Click on assign when you have specified the units you want. Dr. Morgan CIS 480

Dr. Morgan CIS 480

Adjusting Duration by Adding Resources If more than 100% of person’s time is assigned to a task, an icon appears in the task mode allowing you options for adjusting the schedule Pick reduce duration if workers were added to speed up a task on the critical path. Dr. Morgan CIS 480