IE 2030 Lecture 5: Project Management Drawing Gantt Charts Time on horizontal axis, Activities on vertical axis. 1 bar per activity Length of bar = required.

Slides:



Advertisements
Similar presentations
Spring 2008, King Saud University Arrow Diagramming Dr. Khalid Al-Gahtani 1 Network Schedule Predominant Network Scheduling Techniques: –Critical Path.
Advertisements

Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 10 Project Scheduling: PERT/CPM
Chapter 6: Developing a Project Plan
Project Management 6e..
Chapter 17 Project Management McGraw-Hill/Irwin
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
Developing the Project Plan
Start D finish A B C E I G H F J KL N M ActivityDescription AExcavate BFoundation CRough wall DRoof EExterior plumbing FInterior.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Finding the Critical Path
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Developing a Project Plan
SE503 Advanced Project Management
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
Introduction to Management Science
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
Project Scheduling Tools As part of CSA3040 © 2003, 2004 – Dr. Ernest Cachia.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Operations and Supply Chain Management, 8th Edition
BA 333 Operations Management
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management (專案管理)
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management: PERT/CPM
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
deterministic Fixed and known in advance, representing a
Project Scheduling Lecture # 1.
Project Management and scheduling
Projects: Critical Paths
معرفي روش هاي برنامه ريزي شبكه و محاسبات زمان
Project Planning and Budgeting
Critical Path Analysis
Project Management CPM Method Tutorial-p1
Exercise – A small building.
AOA A style of project network diagram in which arrows
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Presentation transcript:

IE 2030 Lecture 5: Project Management Drawing Gantt Charts Time on horizontal axis, Activities on vertical axis. 1 bar per activity Length of bar = required activity time Left end of bar at ES=Earliest Start Time Concepts: –Slack Time – Earliest Start Time

IE 2030 Lecture 5: Gantt Charts Slack time example The first 2-time-unit activity has slack 0, and the second has a slack of 1. Either (but not both) could be delayed without delaying the project

IE 2030 Lecture 5: Gantt Charts Gantt Chart Pros and Cons Easy to understand, visual Can show how large a staff is needed Good for small projects Poor at showing precedence relations Poor at showing ``practical slack Doesnt deal with variability or uncertainty

IE 2030 Lecture 5: PERT/CPM How to draw PERT/CPM networks Concepts: Critical Path, Early Time, Late Time How to compute values. Why a good algorithmic method is needed. A model for dealing with uncertainty: PERT, Beta distribution, central limit theorem. Formulas that make assumptions.

IE 2030 Lecture 5: PERT/CPM How to Draw Networks Each activity is represented by a unique arc (branch) Start node, Finish node Parallel arcs not permitted: 2 arcs may not share both head and tail nodes Use dummy arcs as needed for precedence Nodes may be thought of as events such as the end of an activity

A D B E C F Critical Path: A,D,F. Early start time of D,F = Late time = 12 Early start time of B,C = 4; Late start time=5

A D B E C F Critical Paths: A,D,F; A,B,C,F; A,D,E,F.

Earliest Start Times -- Forward Computation

Earliest Start Times -- Forward Computation Note: Early Finish Time = Early Start Time + Activity Time

Latest Finish Times -- Backward Computation Note: Late Start Time = Late Finish Time - Activity Time Early S (F) Time = Late S (F) Time for critical path arcs