Test Beam models in Mokka

Slides:



Advertisements
Similar presentations
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Geant4-based Simulation Status and Plans Dhiman Chakraborty, Guilherme Lima, Jeremy McCormick, Vishnu Zutshi Calorimetry Working Group ALCPG 2004 Winter.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
8/17/031 Geant4 Simulations Guilherme Lima, Jeremy McCormick General Comments Test Stand (JM) Test Beam (GL)
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Test Beam models in Mokka Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Inside the new Mokka release Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
Certifying Geant4-based calorimeter simulations for the LCD Dhiman Chakraborty, Guilherme Lima, Jeremy McCormick, Vishnu Zutshi NICADD, NIU ALCWG-Cal Meeting.
1 Calice UK s/w meeting RHUL 24/1/06D.R. Ward David Ward Have previously reported on comparison of Feb’05 DESY data with Geant4 Monte Carlos. Issues with.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
International Workshop on Linear Colliders, Geneve Muon reconstruction and identification in the ILD detector N. D’Ascenzo, V.Saveliev.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
The development of SDHCAL in Mokka Gabriel Musat, Ran Han, Gerald Grenie
TB model improvements in Mokka and status of MC production Fabrizio Salvatore Royal Holloway University of London.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
CaTS and Dual Readout. CaTS – Calorimeter and Tracker Simulation Describe detector in gdml file (xml like) Define.
The Q Weak Experiment Event tracking, luminosity monitors, and backgrounds John Leacock Virginia Tech on behalf of the Q Weak collaboration Hall C Users.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Update on pion and muon showers Erik van der Kraaij & Przemyslaw Majewski CERN LCD May 17, 2010.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
MOKKA - recent developments Gabriel Musat, L.L.R. – Ecole Polytechnique.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
1 CALICE Tail-Catcher Muon-Tracker(TCMT) Preliminary Test Beam Results Kurt Francis NICADD/Northern Illinois University For CALICE Collaboration ALCPG.
Michele Faucci Giannelli
the CALICE test beam set-up and running experience
Geant4-based Simulation Status and Plans
Beam Gas Vertex – Beam monitor
Preparation for CERN test beam
CALICE scintillator HCAL
Tracking System at CERN 06 and 07 test beams
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
ScECAL+AHCAL+TCMT Combined Beam FNAL
DESY TB05: Drift Chambers simulation
Rick Salcido Northern Illinois University For CALICE Collaboration
DESY drift chambers efficiency and track reconstruction
Cosmic ray test of RPC for the ATLAS experiment
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Michele Faucci Giannelli
Geant4 Activities at NICADD / NIU
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

Test Beam models in Mokka Fabrizio Salvatore (RHUL)

Pre-release of Mokka now available A preliminary release of Mokka is now available for download: Mokka v06-02-pre02 There are several improvements in the simulation and all the test beam models for the Desy and CERN test beams are available for first test of MC productions The models are not completely tested, so please report any problem you might experience

Coordinate system The Z = 0 plane is on the back face of the carbon fiber module 3. Since some of the beam tests are done by using only the Ecal, the coordinate system has to be tied to the Ecal rather than to the Hcal. When testing different angular positions, the modules 1 and 2 are shifted with respect to module 3 along the +/- X axis. The (X,Y) origin of the coordinate system is a point on the end face of module 3 that corresponds in Y with the centre of the active area, and in X with the symmetry centre of the end face. The slabs are staggered along the X direction.

Desy 2006 test beam Model is complete and has been thoroughly checked

Detector model TBDesy0506 - I Drift Chambers (FS): same as for the 05 test beam gas mixture is non-flammable (96% Ar, 4% Ethane) 4 drift chambers (72x72x88 mm3) hits written out in LCIO format To reduce number of hits, only hits with Erel > 0.001 are written in output Trigger scintillators (FS): 3 scintillators (one 120x120x8 mm3, two 200x200x8 mm3) used in the trigger hits simulated as ‘calorimeter’ hits

Detector model TBDesy0506 - II Finger counters (FS): 2 scintillators (5x100x5 mm3) placed in T shape to monitor beam position hits written out in LCIO format hits simulated as ‘calo’hits ECAL (G.Musat): 3 modules (5 slabs) tungsten thicknesses = 1.4, 2.8, and 4.2 mm. silicon planes divided into wafers 6x6 cells (10x10 mm2), guard-rings (1 mm width). Two separate hits collections, one for hits in cells and the other for hits in guard-rings.

CERN Aug 2006 test beam Complete, but HCAL position needs to be checked Should be 90 mm higher in y ECAL, TCMT and Tracking are OK

Detector model TBCern0806 - I Cerenkov detector (FS): only material is simulated Drift Chambers (FS): provided by CERN (50% Ar, 50% CO2) 3 drift chambers (108x108x44 mm3) hits written out in LCIO format To reduce number of hits, only hits with Erel > 0.001 are written in output Trigger scintillators (FS): 3 scintillators used in the trigger (one 30x30x15 mm3, two 100x100x15 mm3) One veto scintillator (200x200x15 mm3) hits simulated as ‘calo’ hits

Detector model TBCern0806 - II ECAL (G.Musat): same as for TBDesy0506 HCAL (O.Wendt): 35 layers (900x900x30 mm³). Each layer is composed by an iron absorber and scintillating material and is sub-divided into 90x90 mm2 cells of 10x10mm² Cell numbering scheme (from lower left corner of each layer) i = row, j = column, k = layer TailCatcher (G.Lima): 16 layers (absorber+air+readout module) 2 different absorber thicknesses (19 mm - layers 1 to 8, 101 mm – layers 9 to 16). Readout modules: 9.5 mm. All absorbers in place, but only 8 readout modules (1,4,7,10 – vertical strips; 2,5,8,11 – horizontal strips). Layers 3,6,9,12-16 have no readout modules and 32mm-thick air gap Muon Counters (FS): 2 scintillators (1000x1000x9.5mm3) steel (1mm) + plastic scintillator (7.5mm) + steel (1mm) hits simulated as ‘calo’ hits and written out in LCIO format

CERN Oct 2006 test beam Complete, but not fully checked yet

Detector model TBCern1006 - I Cerenkov detector (FS): same as TBCern0806 Drift Chambers (FS): same as for TBCern0806 Trigger scintillators (FS): ECAL (G.Musat): same as for TBDesy0506

Detector model TBCern1006 -II HCAL (O.Wendt): 30 layers (900x900x30 mm³). Each layer is composed by an iron absorber and scintillating material and is sub-divided into 90x90 mm2 cells of 10x10mm² (virtual cell scheme) Cell numbering scheme (from lower left corner of each layer) i = row, j = column, k = layer TailCatcher (G.Lima): 16 layers (absorber+air+readout module) Fully instrumented: 2 different absorber thicknesses (19 mm - layers 1 to 8, 102 mm – layers 9 to 16). Readout modules: 9.5 mm. Air gaps are 22 mm thick Muon Counters: 1 scintillator (1000x1000x9.5mm3) steel (1mm) + plastic scintillator (7.5mm) + steel (1mm) hits simulated as ‘calo’ hits and written out in LCIO format

MOKKA web site http://polywww.in2p3.fr:8081/MOKKA All information about the detector models are kept updated at this site Check for any inconsistency and report any problem Pre-release of Mokka 06-02 is already available for download from this site

Summary Pre-release of new version of Mokka (06-02) is available for download from the Mokka WEB site All test beam models for the 2006 test beams are available TBDesy0506 - complete and fully checked TBCern0806 - complete, but some checks are still to be done (e.g. HCAL y position) TBCern1006 - complete, not yet fully tested Please report any problem you might find when using this pre-release (will speed up the process of a final Mokka relese) Planning to have a final stable release during/just after Valencia