WA105: Order Status IFAE Thorsten Lux.

Slides:



Advertisements
Similar presentations
05/31/131 MicroBooNE photon collection system 1. Introduction 2. PMT unit 3. Installation 4. Performance 5. Conclusion Teppei Katori for the MicroBooNE.
Advertisements

WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
PMT Support Structure. Final Design. Enrique Calvo Alamillo KOBE - 3 March 2008.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ECAL LED monitoring system upgrade R&D status V. Egorychev, P. Shatalov, A. Zhokhov (ITEP, Moscow, Russia) E. Chernov, Yu. Guz, V. Obraztsov (IHEP Protvino,
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Compressor status AWAKE Technical Board meeting 19 August 2015.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
Argontube Detector design Laffranchi Marco, Meregaglia Anselmo, Messina Marcello, Rubbia Andre’ Bern,
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Information about Multi-conductor cables of the Remote HV option Wednesday Tile upgrade meeting 10 February 2016 François Vazeille (LPC Clermont-Ferrand)
ECAL LED monitoring system upgrade status 04/09/20131.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
CERN Giovanna Lehmann, Xavier Pons
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Teleconference ACS – FREIA 31th May 2017
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
Installation of the T600 at Fermilab
Plans for this week MWPC: wire stretching today
QXF Coil Fabrication & Tooling Reaction / Impregnation
Cabling for LHCb Upgrade
Ti/SS transitions A.Basti INFN-PISA*
HF Test station at P5 A.Mestvirishvili.
Status of different Parts Budget Summary
Preliminary Y-chamber specifications – First draft
T1 Electronic status Conclusions Electronics Cards:
PMT cabling Gian Luca Raselli INFN Pavia
Warm structure requirements :
Plans from last meeting
Requirements of the support mechanics
PMT system production, QA and installation
Far Detector Activities Late 2017 – Early 2018
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Status with crucial LSS5 kicker transmission line cables
Parts exchange for HL-LHC AUP Q1&Q3
Prototype cryomodule development
UPPSALA UNIVERSITY_GERSEMI PROJECT
Simplified Procedure Draft
Presentation transcript:

WA105: Order Status IFAE Thorsten Lux

PMT Shipment Carrier identified First offer received last summer Only new quotation will be needed Acrylic plates to protect photocathode surface and TPB coating during transport and storage already at IFAE

TPB Coating Until new schedule update still foreseen for April/May 2018 Has to be done this year! TPB provider identified: Sigma-Aldrich New offer need to be requested Short delivery time (at least the last time) 5 g cost 230 Euro => will need probably 50-60 g

SHV for Instrumentation Flange 36 SHV feedthroughs (242-SHVDF50 from Allectra) for PMT HV following web page 405 Euro each Not clear who will produce flange Bern told me Allectra but Sebastien told me that this is not guaranteed Waiting for Sebastien to give input for order Told me that flange is his smallest problem in respect of possible delay

PMT HV Cables 36 PMT HV cables needed with singled sided SHV connector 2 Options: RG-303 or HTC-50-3-2 RG-303 used in Double Chooz and inside cryostat but very expensive HTC-50-3-2 standard, red CERN HV cable much more cost effective Attenuation length similar for both as Antonio measured Currently planning to use HTC-50-3-2, also for cost scaling to final detector Base material will be ordered from CERN store and then assembled at IFAE Waiting for input from Yann-Axel for length => exact cable routing still not defined

Optical Fibers Various fibers were tested Favorite fiber diameter currently 400 or 600 um Tubing probably stainless steel with black sheath => still to check bending radius with Thorlabs Length still not defined => as for PMT HV cables waiting for final routing from Yann-Axel For tests at CIEMAT some fiber samples are available Final fibers will be probably ordered afterwards ( about 220 Euro per piece)

Summary PMT TPB Coating at CERN: Shipment prepared and can be launched when needed TPB supplier found and order can be placed when necessary SHV connectors for instrumentation flange: waiting for Sebastien PMT HV cables: pieces and their providers identified but waiting for input from Yann-Axel Provider of optical fibers identified => some more tests needed and waiting for input from Yann-Axel Manpower: 1 mechanical technician for PMT installation