Development, Safety Oversight and

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

AIR OPERATOR CERTIFICATION
RECORD KEEPING Cooperative Development of Operational
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Module N° 6 – Prescription/Performance based environment.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
SAFETY MANAGEMENT WORKSHOP
Safety Oversight System in India 20 TH SCM of COSCAP-SA 05 April 2011.
© Integra A/S SAFETY MANAGEMENT WORKSHOP Karachi - January 2006 PRESENTERS: PETER THORSEN STEFAN REIB.
ICAO Safety Oversight Audit and Safety Oversight Status in Nepal
ICAO Dangerous Goods Inspector Workshop
1 Welcome Safety Regulatory Function Handbook April 2006.
1 Regulation. 2 Organisational separation 3 Functional Separation.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Session No. 3 ICAO Safety Management Standards. The Big Picture Two audience groups Two audience groups States States Service providers Service providers.
Global Aviation Safety Plan
NPA WG : Single and multiple releases
Foreign Air Operator Validation & Surveillance Course
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
ALLPIRG/4 MEETING PARTICIPANTS (Montreal, 8 February 2001) Briefing to The ICAO Universal Safety Oversight Audit Programme.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Foreign Air Operator Validation & Surveillance
Foreign Air Operator Validation & Surveillance Part I ~~ History.
ICAO State Safety Programme (SSP) Implementation Course
Prescription / Performance
Module N° 6 – SMS regulation
David Gamper, Director, Safety and Technical Affairs ACI World PRE-CONFERENCE WORKSHOP for the ICAO AIR NAVIGATION CONFERENCE ICAO HEADQUARTERS MONTREAL.
Module N° 7 – Introduction to SMS
Module N° 9 – SMS operation
ICAO Part 139 Review Aerodrome Certification Rule Design Proposal
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Vision: A strong and capable civil society, cooperating and responsive to Cambodias development challenges 1.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
FAA Office of Airports Airport Fuel Storage and Handling
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
1 Auckland Airport Martin Fryer Sustainability Advisor.
Checking & Corrective Action
Dr. Olli M. Turpeinen (C/MET/AIM)
Directorate-General for Energy and Transport Information and Communication A European Community Contribution to World Aviation Safety Improvement Singapore.
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
By Nadia Konzali COSCAP-GS Project Coordinator
Nadia Konzali Project Coordinator, COSCAP-GS
Enabling air transport growth in the Asia Pacific region Oct 2014 Air Traffic Controllers’ Guild (India) Seminar, New Delhi.
ICAO Provisions for Safety Management
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA 1973 to 2004.
What SMS means for an Operator’s relationship with the CAA
AUDITS AND INSPECTIONS
Frankie Yick HKSAR Legislative Councillor (Transport Functional Constituency) 26 th February, Hong Kong’s Shipping and Logistics Sector – Challenges.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
The Implementation of Aviation Safety Management System in Taipei FIR Ms Chia-CHi Liu Chinese Taipei.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
PARLIAMENTARYPORTFOLIOCOMMITTEEONTRANSPORT 6 APRIL 2005 CAPE TOWN.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
PERSONNEL LICENCING REGULATIONS  Afiland adapts ICAO Annex 1 SARPS  Except  Flight Navigator,  Flight Engineers  Flight Radio telephony Operators.
ICAO Requirements on Certification of Aerodromes Module - 2
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
EU rules for Third Country operators ??
Foreign Air Operator Validation & Surveillance Course
Drones, RPAS, UAV’s, UAS Unmanned aircraft.
Sri Lanka's Experience with ICAO TCB Projects
Screeners and the Screener Organisation
AFILAND FEDERAL CIVIL AVIATION REGULATIONS
Department of Civil Aviation Ministry of Information & Communications
Foreign Air Operator Validation & Surveillance Course
Aerodrome Certification Workshop
Presentation transcript:

Development, Safety Oversight and Safety Management System (SMS) Of Business Aviation (BA) in Hong Kong (HK) Michael Lau Senior Operations Inspector Flight Standards and Airworthiness Division Civil Aviation Department (CAD) Hong Kong SAR

Outline BA Development in Hong Kong Safety Oversight SMS Challenges ahead

Business Aviation Development in Hong Kong

Hong Kong Financial centre A place for international business A hub High volume of business activities Over 50 million population in the Pearl River Delta Region

Asia Pacific Region International Monetary Fund (IMF): GDP annual growth Strategic location of Hong Kong Hong Kong as a gateway to Mainland China Mainland China 1.3 billion population 2nd largest economy in the world Highest foreign exchange reserves Great demand for air services World Asia Pacific Region 2009 1.8% 3.8% 2010 3.4% 5.5%

Within five hours flight time 1 hr 2 hr 3 hr 4 hr

Growth of Civil Aviation in HK Passenger throughput Cargo throughput 45 million 3.3 million 3rd in Asia 1st in Asia

Average 20% growth each year Developments of BA in HK from 2005 to 2009: Aircraft movements and Passengers had doubled Average 20% growth each year

A Comparison of HK BA Operator activities of 2009 with that of 2005 Year No. of Operator No. of Aircraft 2005 2 8 2009 21

Types of Business Jet on HK register include: Global 5000 CL 604/605 Gulfstream G300 and more coming ... Boeing BBJ Citation 560XL CL850

Location of the Hong Kong Business Aviation Centre (BAC) Hong Kong International Airport O7L 25L O7R

HKBAC Total size about 65,000 m2 Executive terminal building and two hangars providing one-stop-shop services

Business Aviation Safety Oversight

Application and Continuous Surveillance Hong Kong Air Operators Foreign Air Operators for Non Schedule Flights

Hong Kong Commercial Air Operators Application Operations Manual Training Manual Organisational Structure Key Staff Members Arrangements and Facilities of Maintenance Security Programme Pre AOC Audit Operations Airworthiness Proving Flight Yes Findings No Air Operator's Certificate (AOC) Granted for one year Surveillance Start of Operations HKCAD has the right to suspend the AOC in case of any safety concerns Flight Inspections Station Inspections Document Inspection Simulator Approval Authorised Examiner Ramp Inspections Maintenance facilities Maintenance records Remedial Actions Findings Yes Findings resolved No Air Operator's Certificate renewed for one year

Foreign Commercial Air Operators for Non Schedule Flights Application Primary Responsibility State of Operator State of Registry 3 Days 2 weeks for new Operators Documents check Permit / Clearance Start of Operations Surveillance Findings from other Authorities' Reports or ICAO Audit or ATC Reports Ramp Inspections Serious Follow up with operators and Authorities Operations of aircraft may be grounded in HK Findings Significant safety concerns No Ramp Inspection Report

Business Aviation Safety Management System

ICAO Annex 6 and HK Legislation Background Systematic approach ICAO Annex 6 and HK Legislation 4 types of Service Providers shall implement SMS Identify safety hazards and mitigate risks Remedial actions Continuous monitoring Continuous improvement

Acceptance Requirements SMS development plan Nomination of key personnel Identify hazards and mitigate risks Safety assurance Training and Communication SMS Manual Gap analysis report Proactive safety culture Continuous improvement Further enhancement

Compliance Status in Hong Kong Implementation of SMS in HK   SMS Effective Date Compliance Status in Hong Kong Airports Nov 2003 Yes Air Traffic Control Nov 2005 Airlines and Air Operators Jan 2009 Yes   Aircraft Maintenance Organisations

Challenges ahead

Challenges for the Regulator Ad hoc nature of Business Aviation Flexible Collaboration Numerous types Ops Manual to cover all types Suitably qualified personnel Training Organization / Simulators Training Org / Authorities Initial assessment by the Operators

Challenges for Aircraft and Airport Operators Rapid growth Single airport in Hong Kong capacity issues How do we increase capacity Equipment 3rd Runway Infrastructure - midfield

“Committed to a Safe and Efficient Air Transport System” HKCAD VISION “Committed to a Safe and Efficient Air Transport System”

1. An application for permission (DCA122 form) to operate non-scheduled services; 2. A valid air operator's certificate or equivalent document to indicate type of aircraft authorized, area(s) of operations, and type(s) of services authorized; 3. Current Certificate of Airworthiness, and Certificate of Registration of the aircraft to be used; 4. The aerodrome operating minima to be used at the Hong Kong International Airport together with the instructions relating to the application of those minima; 5. Noise certificates to show that aircraft complies with ICAO Annex 16 Volume I Part II Chapter 3 noise standard ; 6. Information as to how the pilot's route and airport qualification is to be established for Hong Kong; 7. Insurance Certificate that insures the operator in respect of any liability which may be incurred by him/her in respect of Third Party, Passenger, Baggage, Cargo, and Mail for any one event to a Combined Single Limit required in accordance with the Civil Aviation (Insurance) Order; and 8. Confirmation on whether the aircraft is equipped with TCAS II, and has full navigational capability and sufficient fuel to divert to alternate airfield.

1. Type of aircraft; 2. Nationality and registration marks of the aircraft; 3. Name of operator; 4. Name of ground handling agent in Hong Kong; 5. Proposed dates and times of arrival and departure; 6. Confirmation that there will be no fare-paying passengers or commercial cargo on board; 7. Insurance Certificate that insures the operator in respect of any liability which may be incurred by him/her in respect of Third Party, Passenger, Baggage, Cargo, and Mail for any one event to a Combined Single Limit required in accordance with the Civil Aviation (Insurance) Order; 8. Noise Certificate to show that aircraft complies with ICAO Annex 16 Volume I Part II Chapter 3 noise standard; and 9. Confirmation that the aircraft has full navigational capability and will carry sufficient fuel to divert to its alternate airfield from overhead Hong Kong