WP 10 Service Activities: Access to data products and knowledge

Slides:



Advertisements
Similar presentations
ERA-LEARN Supporting the ERA-NET Learning Platform by creating a toolbox for the ERA-NET community Roland Brandenburg, FFG.
Advertisements

February 2007 Dissemination Policy for OECD Statistics: The role of the Statistical Data Warehouse.
W. Wobbe; Support for the coherent development of policies Regional Foresight as a Tool for Research and Innovation Open Days 2005 Seminar on.
2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating.
Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month.
Web-site Design Strategy.  For P5, learners need to draw up plans for the evaluation of the website design.  The plans should include consideration.
DBI209 demo Deploy & Future Proof Monitor & Manage Share & Collaborate Mash-up & Analyze Connect & ProvisionFind & Access.
More than Knowing At Mercy College Karin Gilbert & Michelle Cotter.
What is SharePoint? Module 1. Module Overview  Defining SharePoint  Understanding How SharePoint is Used  Interacting with SharePoint.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Observatory 1 - FRAM.
Stirling oct 97dp/rm p.1 E-learning and the eUniversity Professor Robin Mason Institute of Educational Technology The Open University Milton Keynes.
Group 6 Andrew Gonzalez Nicholas Petrilli Sa Zhang.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Learn > Succeed WebEx University. 2 Online Self-Paced Training: Anytime, Anywhere! What is Self-Paced Training? WebEx Interactive Learning features a.
WP.29 Informal Working Groups Changes to the distribution of documents UNECE secretariat Geneva, 26 June 2012 Informal document WP agenda item.
Psychiatry-Oriented Analysis of Multimedia Impact on E-Commerce CMMI maturity level 2 An improvement path for advertising efficiency.
General Assembly Meeting – SA Session | Crete Oct SA Observatory 15 PYLOS – Southern Ionian Sea water column and seabed observations to access deep.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
NA2 objectives The „v.E.R.C.“ (virtual Earth System Resource Center) v.E.R.C is: A (technical) infrastructure to improve the utilization of the ESM core-infrastructure,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Quality Plan for EGEE III Geneviève.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP 7 SERVICES AND DATA ACCESS.
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
MAP-IT! Review Meeting 5 March Brussels Project Next Steps Cybion Srl.
REAKT Strategies and tools for Real Time Earthquake Risk Reduction WP8: Dissemination Sandra Laskowski, Friedemann Wenzel (KIT) REAKT - 1st Annual Meeting,
Knowledge Management Standard (A hypothetical). Establish the context Establish the context Establish the strategic, organisational context in which the.
Connect. Communicate. Collaborate educonf Coordinated support of European videoconferencing under the GN2 SA6 framework Dimitris Daskopoulos, GRNET, AUTH.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
PROJECT ACTIVITIES (WP4) Dissemination session 17 NOVEMBER 2015 KTH, STOCKHOLM, SWEDEN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Mlmguruji.in is an mlm classified website in india.
BENCH-CAN Internal evaluation 2nd semester
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
Tools, Resources, and Assessments
RESOLUTIONS FROM THE NATIONAL LOTTERIES COMMISSION’S INDABA 2015
How to Federate with Lync Online
Introuduction to MOODLE
Presenter Organisation(s)
WP4 – Knowledge platform and communication
PROMOTION OF BEST PRACTICES FOR NATIONAL ENVIRONMENTAL INFORMATION
Second pro-iBiosphere Management Meeting
SA E2-M3A – SOUTHERN ADRIATIC DEEP WATER FORMATION, HEAT BUDGET, AND CARBONATE SYSTEM TO ASSESS CLIMATIC VARIATION AND OCEAN ACIDIFICATION OGS, Trieste,
Math 6 – 12 Content networking
General MS procedure UNECE WP6 panel session Draft 2
Presenter Organisation(s)
Network side issues in WLAN Interworking
AzMerit Online Testing
MSDs and combined metadata reporting
Unit 4 Project Design, implementation and evaluation
SESSION 10.1 Latest developments with TUFMAN

Expectations of the Regional Networks
Strategic Board Business Management Group (joint with BSAB)
Q
RECARE set-up Rudi Hessel on behalf of coordination team
Monitoring and Measurement Cluster
SA X.1 Trans-observatory Data Tool - EarthVO
Unit4 Customer Portal Knowledge User Access.
Animal-Borne Instrument Task Team ABI TT Terms of Reference
GEOSTAT 1B – presentation of the call for proposals
Presenter # 1 • Presenter # 2 • Presenter # 3
Technical Resources & Training
Q
Harmoni-CA initiative
SOA initiatives at Istat
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Rannis Kick off meeting 29. January 2019, Oslo
PROGRAM PLANNING IN COMMUNITY DEVELOPMENT
WISE and INSPIRE By Albrecht Wirthmann, GISCO, Eurostat
ECO/561T ECONOMICS ECO/561T ECONOMICS The Latest Version A+ Study Guide All Apply and Practice
Presentation transcript:

WP 10 Service Activities: Access to data products and knowledge FixO3 Service Activity session WP 10 Service Activities: Access to data products and knowledge all products and related data must be online by month 18 latest evaluation of SAs by the Service Activity Panel in months 18 and 36 independent international reviewing board what will be parameters for the evaluation? design of a check-list development of a FixO3 SA portal linking to individual SA sites and their products could be done e.g. by a dynamic map D4.6 monitoring of SA access (probably combined with SA evaluation, month 18) D4.7 reports on SA procedures, developments and dissemination and how activities are connected to the user community (month 20) Important upcoming tasks 1

What could be done with this? FixO3 Service Activity session What could be done with this? developing a set of multi-platform parameters harmonisation of methods/ approaches from several platforms designing an overall-platform data-product 2