Calice Tile-HCal and Tail-catcher/Muon Tracker

Slides:



Advertisements
Similar presentations
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Advertisements

Introduction Felix Sefkow HCAL main meeting February 14, 2006.
The Tile-HCAL Physics Prototype; concept, status, time plan Volker Korbel, DESY, for the CALICE Coll. Montpellier, France, November 2003 Groups involved:
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Muon Detector R&D Vishnu V. Zutshi NIU/NICADD. RPC based.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
1 H-Cal front-end ASIC Status LAL Orsay J. Fleury, C. de la Taille, G. Martin, L. Raux.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
NICADD Participation in Fermilab Linear Collider Activities Linear Collider activities at NIU are rather diverse –Beam Physics & Diagnostics –Calorimeter.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
JRA3 Institute of Physics ASCR Prague
Final CALICE OsC meeting: Status and summary of project
CALICE Oversight Committee
Test Beam Request for the Semi-Digital Hadronic Calorimeter
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Felix Sefkow DESY LDC at Vienna November 17, 2005
CEPC 数字强子量能器读出电子学预研进展
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
SiD Calorimeter R&D Collaboration
Construction and Testing of a Digital Hadron Calorimeter Prototype
CALICE scintillator HCAL
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
10/month is the present production rate 2 FTE + sporadic contributions
C. de La Taille IN2P3/LAL Orsay
Towards a realistic Scintillator HCAL with SiPM read-out
Tail-Catcher/Muon Tracker Prototype
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Rick Salcido Northern Illinois University For CALICE Collaboration
Vishnu V. Zutshi for NIU/NICADD
Test Beam: Calorimetry
Scintillator HCal Prototype
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

Calice Tile-HCal and Tail-catcher/Muon Tracker Vishnu V. Zutshi Northern Illinois University

Proposed Test Beam Setup Joint development of test beam prototype simulation software within MOKKA framework lead by DESY/NIU 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

Overall Responsibilities Mechanics DESY,ITEP Tile-Fiber System ITEP Si-PM MEPhI, ITEP Cassette assembly LED DESY, Prague FEE LAL, MEPhI, JINR DAQ UK Groups APD Option Prague, DESY Slow Control DESY, LPI Software + Simulation DESY, NIU Tail-catcher Coordination DESY, ITEP 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

Tile-Cal Schedule Jun04 Jul04 Aug04 Sep04 Oct04 Nov04 Dec04 Jan05 Tiles SiPM Tile+SiPM Cassette LED Stack FEE Chip DAQ Commissioning Mold produced Full production First 500 good Full prod. + selection Second batch of 5000 Tests start 1st 5K ready 2nd 5K  Mech. proto. Assembly of 1st with tiles Full set (mech.) Assembly with tiles continues  Design ready Prototype ready Production continues  Absorber structure ready Scanner 1st submission delivery final submission Delivery  Prototype board in hand Full production (5 boards) ready 1st cassette w/ FEE & DAQ 1st half of hcal ready Jun04 Jul04 Aug04 Sep04 Oct04 Nov04 Dec04 Jan05 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

Tile-Fiber-SiPM Testing 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

Front End Chip Being developed at LAL, Orsay 5/22/2019 100nF 10pF Variable Gain Charge Preamplifier Variable Shaper CR-RC² 10kΩ 5pF 1pF in 2.5pF 100f … 100MΩ 1.6pF 3.2pF 100kΩ 500fF 8-bit DAC 1-5V ASIC Being developed at LAL, Orsay 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

Tile-HCal Cost Estimates Item K Euro Tile-Fiber System 35 Photo-detectors 70 Cassettes 50 Absorber + Table 60 HV System 20 LED System 30 Front-End Electronics 40 DAQ Total 375 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 Contributions Investments: Germany  ~350K Russia  40K for prod. infrastructure and 10K for electronics production (JINR/BMBF) USA  20K for Si-PM photo detectors Czech Republic  25K for APD option 35-40 FTE + travel funds from all collaborating institutions ~35 FTE + travel funds from all collaborating institutions 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

Tail-Catcher/Muon Tracker (TCMT) Optimization of strip width Optimization of strip thickness 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 Extruded Strips >10 p.e./mip 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 TCMT Cassette Layout Separate covers Mirrored end connector Si-PM Co-axial cables 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

TCMT Schedule Scintillator Strips SiPM Cassette LED Stack Cart Commissioning Pre-prod prod For 1st cass. Full sample done for 1st cass. arrive for 8 cassettes arrive Mech. Proto. ready 1st cassette ready 8 cassettes ready Full set done Design ready prototype ready Production cont.  Design ready Absorber structure ready Design ready With some motion 1st cassette w/ FEE & DAQ 8 cassettes of TCMT readout Jun04 Jul04 Aug04 Sep04 Oct04 Nov04 Dec04 Jan05 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 TCMT Cost Estimates Item K Euro Strip-Fiber System 5 Cassettes 8 Module (design+assembly) 15 (FNAL) Cart (design+assembly) LED System 7 Total 50 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 Status and Plans Tile-HCal prototype has entered its construction phase. Unique in its ability to explore the whole range of readout options from the purely digital to the fully analog Inclusion of a tail-catcher/muon tracker for studying shower tails, leakage and muon identification/reconstruction in the PFlow paradigm will allow the full realization Calice test beam program. Program has nurtured and benefited from its truly international character. This trend is expected to intensify…. The next step is the exposure of the prototype to a hadron test beam to not only gain operational experience but even more importantly test, influence and validate the hadronic shower simulations leading to further development of PFlow algorithms. Need to take test beam together with the ECal in the period 2005-2006 if conceptual detector design choices are to be made in time for the proposed 2015 start of the LC. 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 Backup 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 Lateral Size 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 5/22/2019 V. Zutshi, DESY PRC Meeting, May04

V. Zutshi, DESY PRC Meeting, May04 5/22/2019 V. Zutshi, DESY PRC Meeting, May04