Glasgow University Staff Survey 2012 University Services Presentation Ian Black, HR Director University of Glasgow.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

The Fall Messier Marathon Guide
Water Quality in the Caddo Lake Watershed Caddo Lake Water Quality Cypress Creek Clean Rivers Program.
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Sequential Logic Design
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Development and Implementation of a Recovery-Based System: Comparison of Instruments for Assessing Recovery Jeanette M. Jerrell, Ph.D. Professor of Neuropsychiatry,
1 1  1 =.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
The 5S numbers game..
1 A B C
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
- D A N I S H A G I N G R E S E A R C H C E N T E R - Fatigue – an indicator of early aging? Why do we age so differently? Anette Ekmann.
Frequency Tables and Stem-and-Leaf Plots 1-3
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Problems, Skills and Training Needs in Nonprofit Human Service Organizations Dr. Rick Hoefer University of Texas at Arlington School of Social Work.
Progressive Aerobic Cardiovascular Endurance Run
Evelyn CP School Foundation Stage Results (Specific Learning Goals – Reading, Writing and Number) 2013 Reading (Expected) 77% Writing (Expected) 43% Number.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
: 3 00.
5 minutes.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
& dding ubtracting ractions.
Select a time to count down from the clock above
Chapter 8: Dialysis Providers 2014 ANNUAL DATA REPORT VOLUME 2: E ND -S TAGE R ENAL D ISEASE.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Glasgow University Staff Survey 2012 Science & Eng College Presentation Ian Black, HR Director University of Glasgow.
Glasgow University Staff Survey 2012 Social Science College Presentation - Ian Black, HR Director University of Glasgow.
Glasgow University Staff Survey 2012 MVLS College Presentation Ian Black, HR Director University of Glasgow.
Glasgow University Staff Survey 2012 Joint Union Consultative Committee July 12 th 2012 Ian Black, HR Director University of Glasgow.
Glasgow University Staff Survey 2012 Arts College Presentation Ian Black, HR Director University of Glasgow.
Presentation transcript:

Glasgow University Staff Survey 2012 University Services Presentation Ian Black, HR Director University of Glasgow

Purpose of GU 2012 Staff Survey 1. To measure: – Staff Involvement – Staff Commitment – Staff Wellbeing 2. To determine: – Actions for building on favourable findings – Actions for addressing weaknesses 3. Where possible, to compare with 2009 survey findings – To look for continuous improvement Restructure has limited comparison Date tbiGU 2012 staff survey - University Services

GU Response Rates by College/US Population as at March 2012 – Base: 5,144; reduced from 6,056 to exclude: invigilators; adult education lecturers; tutors etc – Response: 1,780 (33%) Date tbiGU 2012 staff survey - University Services CollegeResponsePopulationResp. Rate 01.Arts % 02.MVLS % 03.Science & Eng % 04.Soc Sc % 05.University Services % 99.Not Disclosed55-- University Total %

GU Response Rates by Gender & Job Family CategoryResponsePopulationResp. Rate Male % Female % Not Disclosed120-- University Total % 1. R&T % 2. MPA % 3. Tech % 4. Ops % 5. Clinical % 99.Not Disclosed55-- University Total % Date tbiGU 2012 staff survey - University Services

University Services – Response by Service Area 1 Date tbiGU 2012 staff survey - University Services Service AreaSample nPopulation N% response Campus Services Corp Comms DAO E & B Finance HSW HR IT LTS 1133

University Services – Response by Service Area 2 Date tbiGU 2012 staff survey - University Services Service AreaSample nPopulation N% response Library Hunterian 1133 RIO R & E Stud Services Other Not Disclosed 124

US Response by Gender & Job Family Date tbiGU 2012 staff survey - University Services Univ ServicesResponsePopulationResp. Rate Male % Female % Not Disclosed28-- US Total % R&T % MPA % Tech299232% Ops Clinical0-- Not Disclosed21-- US Total %

10 question items used as GU KPIs Date tbiGU 2012 staff survey - University Services KPI Question ItemMeasure (%) KPI 1: Understanding of team aimsVG + Good + Satis KPI 2: Understanding of performance expectationsVG + Good + Satis KPI 3: How often praised for a job well doneAt least 6 monthly KPI 4: How often do you discuss with manager how to improve working practices At least annually KPI 5: How often given performance feedbackat least annually KPI 6: How good are communications within your work teamEx + Good + Satis KPI 7: how good are communications with other teams in School/RI/SEx + Good + Satis KPI 8: How well are GU-wide changes communicated?Ex + Good + Satis KPI 9: I enjoy working in the UniversityStr Agree + Agree KPI 10: I feel loyal and supportive to the UniversityStr Agree + Agree

Average of all GU KPIs 1-10 Date tbiGU 2012 staff survey - University Services **Heterosexual/straight and LGBT, as worded in the questionnaire *Disability Reported or No Disability Reported

Average of all US KPIs 1-10 Date tbiGU 2012 staff survey - University Services

KPI 1: Understanding of team aims (VG + G +S) Date tbiGU 2012 staff survey - University Services

KPI 2: Understanding of performance expectations (VG + G +S) Date tbiGU 2012 staff survey - University Services

KPI 3: How often praised for a job well done (at least 6-monthly) Date tbiGU 2012 staff survey - University Services

KPI 4: How often discuss working practice (at least annually) Date tbiGU 2012 staff survey - University Services

KPI 5: How often given performance feedback (at least annually) Date tbiGU 2012 staff survey - University Services

KPI 6: How good are communications within work team (Ex + G + Satis) Date tbiGU 2012 staff survey - University Services

KPI 7: How good are communications with other School/RIs? (E+G+S) Date tbiGU 2012 staff survey - University Services

KPI 8: How well are GU-wide changes communicated? (Ex + G + Satis) Date tbiGU 2012 staff survey - University Services

KPI 9: I enjoy working in the University (SA + A) Date tbiGU 2012 staff survey - University Services

KPI 10: I feel loyal and supportive to the University (SA + A) Date tbiGU 2012 staff survey - University Services

HSE Stress Measurement Tool - Findings

HSE UK benchmark for work-related stress Classifications are derived from HSE survey of 136 UK organisations ( ), using their methodology – 35 questions measure 7 key work design factors – scored 1-5; 5 is least stress HSE traffic light scoring scheme for 7 factors Date tbiGU 2012 staff survey - University Services ColourCommentRange of UK benchmark Doing very well - need to maintain performanceAt or above 80 th percentile Good, but need for improvement. 50 th - 80 th percentile Clear need for improvement.20 th – 50 th percentile Urgent action neededBelow 20 th percentile

HSE benchmark factors for work-related stress Date tbiGU 2012 staff survey - University Services RedYellowAquaGreen Factor (stressor) Less thanBetween Greater than 1. Demands: workload, work patterns and the work environment Control: how much say staff have in the way they do their work Support: encouragement, sponsorship, resources provided by: a. The organisation and line management b. Colleagues Relationships: promoting positive working to avoid conflict and dealing with unacceptable behaviour Role: whether staff understand role within organisation and whether the organisation ensures they do not have conflicting roles Change: how organisational change (large or small) is managed and communicated in the organisation

HSE Scores: GU2012 by Gender, Job Family Date tbiGU 2012 staff survey - University Services Notes Stress FactorGU2012GU MGU F1.R&T2.MPA3.Tech4.Ops5.Clinic 1.Demands Control a.Managers' Support b.Peer Support Relationships Role Change

HSE Scores for University Services Date tbiGU 2012 staff survey - University Services Stress FactorGU20125.US 1.Demands Control a.Managers' Support b.Peer Support Relationships Role Change