Command Control Device

Slides:



Advertisements
Similar presentations
INDIVIDUAL PROJECT BY R.KARTHIKMANOJ
Advertisements

Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Team: Justin Dick, Ngon Du, Lassen Loop, & Travis Taylor Sponsor: Idaho Dept. of Fish and Game/Land Owners Advisors: Dr. Brian Johnson & Dr. Richard Wall.
3D Graphical Display Ararat Adamian Brian McDonald Tyler Blair Adrian Williams.
HELMET TRACKING SYSTEM (HTS) Group 8 Andrés F. Suárez (EE) Brian Maldonado (EE) Rígel Jiménez (EE)
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
SDP 11 PDR Team Goeckel Group: Adebayo Adeyemi, Joseph Hayward, Mark Kohls, Simon McAuliffe Advisor: Dennis Goeckel MDR Keeping The Secret.
SDP 11 CDR Team Goeckel Group: Adebayo Adeyemi, Joseph Hayward, Mark Kohls, Simon McAuliffe Advisor: Dennis Goeckel CDR Keeping The Secret.
SDP 11 FPR Team Goeckel Group: Adebayo Adeyemi, Joseph Hayward, Mark Kohls, Simon McAuliffe Advisor: Dennis Goeckel FPR Keeping The Secret.
1 Electrical and Computer Engineering Cam Proctor Ramsey Khudairi Tom Gilbert Chad Young Project Orion TekBand.
Ping Project Justin Knowles Kurt Lorhammer Brian Smith Andrew Tank ECEN 4610.
Ping Project Justin Knowles Kurt Lorhammer Brian Smith Andrew Tank ECEN 4610.
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
RememberAll Team 3 Boris, Jason, Kartik, Mike. Laptop Laptop Bluetooth Processor Device Bluetooth LEDs Batteries.
ZigBee Calvin Choy David Kim Jason Chong Devin Galutira.
Palm Wireless Morgan Demers Erik Golen. Presentation Agenda  Project Definition  Technical Specifications - Hardware - Communication Protocol - Chat.
Vigilant Sensing Technology VST1000 Remote Sensing System Preliminary Design Review Development Team: Patrick Hauser Joel Keesecker Mark Kien.
Speaker Timing System for the Western Protective Relay Conference ECE 480 Senior Design Review April 27, 2006 Team Time’s UP! Frank Gonzales Tim Montoya.
TelosB Charging and Energy Meter Kit(Dec1201) Group Leader: Tomas Mullins Communicator: Casey Liebl Webmaster: Shiya Liu Team Members: Andrew Gurik & Qiao.
Team May1310 Team Members: Taylor Bouvin – CPRE Kok Aun Chee (Kodi) – EE Anna Grimley – EE Mike Kinsella – CPRE Jake Kyro - EE Advisor: Professor Wang.
BLANE CHESNUT CHRIS DONNELLY ADAM RASMUSSEN JOHN PRITCHARD ZACH BRUCE ADVISOR: DR. AHMED E. KAMAL Wireless Mesh Bear Tracking.
Wireless Automated News Display (W.A.N.D.) Daniel Karnik, Eric Scott, David Thompson, Ted Wilcox.
L/O/G/O FOUR CHANNEL WIRELESS TRANSMITTER AND RECEIVER.
Smart Home for disabled people Students: Atara Gutman and Anastasia Logvinenko Instructor: Alexander Kinko Midterm Presentation Semester Spring
Locate Wildlife Attach to Arrow Access Arrow Attach to Wildlife Does not alter Shot Detach from Arrow Link to Animal Remains attached during Flight Protect.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
DEC0905 Remote Control of Home Appliances ABSTRACT The objective of this project is to enable users to remotely control home appliances and systems over.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Matthew Dahms – EE Justine.
Remote Control of Home Appliances Using the Internet
Bluetooth Controlled Robot USART communication. This project aims in wireless control of the robot from a bluetooth app in a mobile device through USART.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Automated Nightlight May06-19 Project May06-19 Website: seniord.ee.iastate.edu/may0619 Client: ECpE Senior Design Faculty Advisor: Dr. Degang Chen
Wireless Test Instrumentation System for Rotating Parts ECE Team 167 Lawrence Bogan Jeremy Neaton Adam Bienkowski Michael Golob ME Team 29 Sean Handahl.
Team 03 Department of Electrical and Computer Engineering 15 October 2014 Digital Fitness Trainer PDR.
Mike Baer – Team Leader Tyler Davis – Chief Engineer TJ Binotto – The Mediator Eric Dixon – The Do All Electric Guy Ben Shelkey – Every Team Needs a Crazy.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Android Laser Pointer Control Client System Block Diagram Functional Requirements Development Platform.
Remote Control of Home Appliances PROJECT PLAN Team: ◦ Elie Abichar –CE ◦ Chris Tefer –CE ◦ Ananta Upadhyaya.
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell October 31, 2011.
Safety Motion Detector Final Presentation Senior Design I December 1, 2011.
Soil Moisture Radar – Ongo-02d ABSTRACT During times of increased flood problems, soil moisture becomes a paramount concern among geologists due to the.
Safety Motion Detector Mid-Semester Presentation Senior Design I October 4, 2011.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Plasma Sense Amplifier
Device Interface Board for Wireless LAN Testing
Short to Medium Range Positional Device With Security (Car Locator) Hong J. Kim Thomas Na Ja Heon Ku Hong J. Kim Thomas Na Ja Heon Ku.
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer SPALDING GYMNASTICS SCOREBOARD Client: Spalding Advisor: Zhao Zhang.
1 Wireless LED Display ECE4007-L03 Mekre Mesganaw Mark Reed Paul Simmons Chris White March 12, 2009.
Mid-Semester Presentation Senior Design II October 2, 2012 Humidity-Activated Bathroom Fan.
Final Presentation Senior Design I April 19, 2012 Humidity-Activated Bathroom Fan.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
TV Remote As A Wireless Mouse For PC.
Serial/Fiber-Converter - IE-MCT-1RS232/485-1SC/ST
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Inertial Measurement Unit. Project Advisor: Dr. Basart Client: Matt Nelson Team Members (491): Matt Ulrich Luis Garcia Amardeep Jawandha Julian Currie.
Interfaces 101 Interfaces provide connectivity for the drawers to virtually any POS device (printer, terminal, tablet etc.) in the industry.
Wireless Lighting control system
Solar-Powered Mobile Power Station (MPS)
Vehicle Occupancy Detection System
TEAM 2 – FALL 2006 PRESENTATION 1 LPM: Ahmad Omari.
More than just an LED Group: Sddec1107 Advisor: Ahmed Kamal
Comprehensive Design Review
Solar Telematics System
Spectrum Sensing with Software Radios
Autonomous Rescue Vehicle (Team 10)
Solar Telematics System
PRESENTATION BASED ON EMBEDDED SYSTEM. SUBMITTED BY MAMATA YADAV.
Presentation transcript:

Command Control Device Scott Coffin Adam Faucher Jason Graika Brian Voelz Advisor: Dr. Zhengdao Wang

Project Description Short range wireless control device Honeywell is client Contact: Justin Young Four deliverables Transmitter, Receiver, Programming Dongle, and GUI Desired outcome of this project is for the transmitter to communicate with receiver and have the receiver do a particular command that was programmed by the wireless dongle.

System Block Diagram

Tx Block Diagram

Rx Block Diagram

Functional Requirements Minimum 50ft between Rx and Tx Minimum 5ft between programming dongle and Rx Receiver shall have 2 LEDs Tx and Rx battery life should last at least 8 hrs. Minimum 25ft talk back from Rx

Non-Functional Requirements Tx and Rx less than 1" X 1.5" X 2.5" Tx and Rx should withstand rain and drop Temperature range -25F to 160F (-31.67C to 71.11C) Tx and Rx should have a self contained power source Rx shall not have external antenna

Stretch Goals Minimum 100ft between Rx and Tx Tx and Rx less than .5" X 1" X 2" Easy access to Tx and Rx power Tx shall not have external antenna Tx and Rx battery life should last at least 24 hrs. Full talk back from Rx

Constraints and Technology Considerations Transmission distance Long Battery life User friendly interface Size – device must fit in small housing (less than 1" X 1.5" X 2.5") Environment -25F to 160F Withstand rain and drop from 3ft.

Risks and Mitigation Limited knowledge of Bluetooth technology Limited experience with PCB design Limited knowledge of programing of microcontrollers Will work with Honeywell and Dr. Wang for help with many issues that we may encounter

Tasks and Schedule

Cost Estimates Product Price ($) Qty RN-41 $55 2 LEDS $5 3 Batteries $80 Uart Cable $20 1 Uart Connector $45 PCBs $60 Componets $10 NA Solder Switches 4 Housing $40 Dongle $25 Microcontroller $50 labor 16000 800   Cost (no labor) $400 cost (w/labor) $16,400

Any Questions?