Instrument Overview Larry Springer HMI Program Manager

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Sun Earth Connection Coronal and Heliospheric Investigation STEREO and SECCHI Status Consortium Meeting, Abingdon July 2001 Russ Howard.
Page 1SDO System Requirements Review/System Concept Review (SRR/SCR) – April 8-10, 2003 Lockheed Martin Space Systems Company Advanced Technology Center.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Advanced Technology Center 1 HMI HMI - Scherrer Stanford University SDO System Concept Review Lockheed Martin Space Systems Company Advanced Technology.
1.B – Solar Dynamo 1.C – Global Circulation 1.D – Irradiance Sources 1.H – Far-side Imaging 1.F – Solar Subsurface Weather 1.E – Coronal Magnetic Field.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Overview and Calibration Status HMI/AIA Science Meeting February 13, 2006 Jesper Schou.
SDW2005, juin, Taormina The Corot Space instrument.
LSU 10/09/2007System Design1 Project Management Unit #2.
HMI Optics Package HMI Electronics Box The Solar Dynamics Observatory will be placed into an inclined geosynchronous orbit to maximize sunlit hours while.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Space-Qualified Hardware for the CALIPSO Lidar
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Telescope Integration and Tests Tuesday Afternoon.
Solar Dynamics Observatory
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
Page 1lOhcO 9 meeting From MDI to HMI Jesper Schou Stanford University
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Henry Heetderks Space Sciences Laboratory, UCB
HMI Major Science Objectives The primary goal of the Helioseismic and Magnetic Imager (HMI) investigation is to study the origin of solar variability and.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Camera PDR/CD1 Planning 19 September 2008
Rose Navarro HMI Lead Thermal Engineer
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Gayle K. Martin November 14, 2016
Solar-B Science Working Group
P07203 Dynamometry Laboratory Infrastructure
Enterprise Algorithm Change Process
2K CB FDR Overview:  Agenda, Charge, Review Process
Russell Lindgren Electronics Lead
HMI Science Investigation Overview
Peer Review Agenda (Suggested).
Image Stabilization System (ISS)
Precision Oven Thermal Design
Jesper Schou Instrument Scientist
Integration, Test, and Verification
Henry Heetderks Space Sciences Laboratory, UCB
GLAST Large Area Telescope:
Overview Instrument Role Science Niches Consortium science
Systems Engineering Bob Goeke.
SLAC DOE Program Review
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Launch and On-orbit Checkout
Instrument Performance Requirements
Camera Systems Overview
HMI Top Level Requirements
GLAST Large Area Telescope:
Introduction and Overview
Optics Alan Title, HMI-LMSAL Lead,
Project Management Unit #2
Presentation transcript:

Instrument Overview Larry Springer HMI Program Manager larry.springer@lmco.com 650-354-5793

HMI Heritage HMI evolved from the MDI instrument on SOHO SOHO was Launched in 1995 MDI is still providing excellent data after taking 75 million images The HMI Mechanism designs are based on those used on MDI, TRACE, and other programs (C,D,F) The HMI detectors are similar to the 4k x 2k CCDs developed by e2v and used on a previous program (D) The HMI camera electronics is based on the camera electronics developed by RAL for a previous program (F) The HMI structure is an evolution of the structure developed for a previous program (D) The HMI electronics design is an evolution of the electronics designs used on MDI, TRACE, other programs (C,D) The HMI Software is built on the software developed for previous programs (A,C,D,F)

HMI Instrument Components The HMI Flight Instrument consists of the following components The HMI Optics Package The HMI Electronics Box The HMI Intra Instrument Harness The HMI Software

HMI Optics Package Subsystems The HMI Optics Package Includes the following subsystems: Optics Filters Mechanisms CCD Cameras Mechanical Structure Thermal control Image Stabilization Split between Optics Package and Electronics Box

HMI Optics Package

HMI Electronics Box HMI Electronics Box Mounted inside the SDO Spacecraft Contains: Power Converters Control Computer CCD Camera Interface and Data Compressor Mechanism Controllers ISS Electronics Housekeeping The Oven Controller and Limb Sensor Preamp are in the OP

HMI Reliability HMI has the following features to enhance system reliability Redundant Power Converters Redundant Computer and Bridge Board Cross strapping between Camera interface boards and Compressor boards allows one compressor to handle the full HMI data stream Redundant mechanisms for wavelength tuning and polarization selector. Multiple mechanism controllers boards designed with failure isolated in combination with redundant mechanisms controlled by different boards eliminate potential single point failures Redundant Limb Tracker sensors Redundant Filter Oven Thermal Control The Reliability presentation will provide more detail

HMI Peer Reviews leading to PDR September 17, 2003 Mechanisms Optics Package Structure October 8, 2003 Electronics Flight Software October 15, 2003 Optics Package Thermal October 22, 2003 Optics Filters October 29, 2003 Telescope Focal Plane Assembly Reviews had LMSAL experts in each discipline as Peers The SDO Project participated via Telecon connection Review Minutes and Action Items are maintained on the HMI website Action Items tracked to closure by HMI systems engineer Action Items reviewed periodically at the HMI Team Meeting

HMI Summary Schedule

HMI Risk Management Plan The HMI Risk Management Plan (2H00075) was provided to the SDO Project on 1 July 2003 as part of the HMI Concept Study Report It was written to be compatible with the then current SDO Risk Management Plan An updated SDO Risk Management Plan - (464-PLAN-003) was received on 3 October 2003 The HMI Risk Management Plan will be updated to make it compatible with the revised SDO Risk Management Plan after Comments on the original plan are received.

HMI Risk Assessment The large format high speed CCD Camera systems are a technical and schedule risk Assessment: Moderate reducing to low after delivery of Evaluation CCDs Mitigation: Excellent vendors started early in program to provide evaluation devices and developmental camera between the PDR and CDR. Precision Michelson Interferometers key to science observation Assessment: Low, MDI shows that it can be done Mitigation: Excellent vendor (MDI & GONG experience) selected with early evaluation of the polarizing beam splitter (the heart of the Michelson) to reduce risk Precision control of filter oven key to science observation Assessment: Low, MDI shows it can be done Mitigation: Early development of a brassboard oven & controller to demonstrate performance. Redundant oven controller to improve reliability Hollow Core Motors and Shutters require 80 Million operation lifetime Assessment: Low, Not a large step beyond reliability demonstrated on MDI Mitigation: Life test to 160 Million operations with several samples, and redundant critical mechanisms