G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Slides:



Advertisements
Similar presentations
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
Advertisements

1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
G2P Target installation and Beyond. Schedule Pivot before.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
20to2T5m100cm Images Van Graves February 13, 2014.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
G2P Installation Readiness. Fast raster & Calorimeter.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Subject: INJECTION SYSTEM Junction LINAC4-booster
CLAS12 Beamline Configurations
PREX II Vacuum Box, Shielding and Septum Design Status
Spectrometer Layout (Isometric View)
SoLID Magnet - Engineering and Cost
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
HRS at small angles for e+/ e- pair for APEX
Additional Upstream Coil Shielding
Extract from today’s talk given to DCB
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
Additional Upstream Coil Shielding
Cryomodule Assembly Plan
Hall C Dump Status Beam Resuscitation Review
XY Scanner Mount.
NPS Status Feb 01, 2019 Paulo M & Steven L.
Four Jaw Collimator.
Cu67 Isotope Radiator & Target
Polarized 3He target installation
Presentation transcript:

G2p Hall Infrastructure Alan Gavalya May 2011

Overall g2p Target on Pivot in Hall A

Target Upstream Raised 9cm Septum In

Target Upstream Septum In

Target on Pivot Septum Out

Dump with Removable Cartridge Lead Shielding Removable Cartridge Fabricated by UVA

Sieve Slits Added Sieve Slit Assemblies Fabricated by UVA Tungsten Dump

Cooling Lines with BeO Viewer Cooling Plates BeO Beam Viewer

Dump Mount with Camera + Light Adjustment Cartridges Fabricated by Tel Aviv Univ Light W/ Camera He Enclosure Dump Mount

Weldment on Pivot Dump Support Plate with Carriage Fabricated by Rutgers

Septum Magnet Guard Shield

Septum Magnet Coils Added Manifolds for coil cooling installed Beam line to Dump will be Welded in Situ

Adding Target Beam 0 degree Beam 20 degree Beam 90 degree

Cartridge Vertically Extracted Cartridge Extraction Device Removable Cartridge Extracted from Dump

Moved Upstream for Clearance Rails Permit Cartridge to be Moved 3.5 Upstream

Cartridge Fully Extracted Rails Permit Cartridge to be Moved 36off Beam Line

Remaining Design Items Camera/Light Mount Lead Shield/Top Plate Details Cooling Lines for Low Power Dump He Bags (Upstream and Downstream connections) Means to Elevate Target Position 9cm above Beam line Revise Low Power Dump to Accept Beams with Target in Raised position.