Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005

Slides:



Advertisements
Similar presentations
L.T Circuit Breakers.
Advertisements

Back-End Bonding H&K 710 bonder Glue Pitch Adaptors Robot I&J2500 Glue Beetle Chip to Hybrid.
Adhesives And Their Uses
How to install the Insert Alpha Q Tutorial Bert Hull Feb 8, 2005.
ATLAS Module building at Glasgow
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
Curing Concrete. Curing n Moisture n Temperature n Time Curing requires adequate — If any of these factors are neglected, the desired properties will.
Over-Current Protection. Overview  Protection circuitry is required to ensure that electrical components are protected during malfunction  Battery cell.
Adhesion Testing for Protective Coatings
Joining Metals.
FCAL silicon sensors at INP PAN Cracow Current status Our plans Some remarks FCAL Hardware WGArkadiusz Moszczynski INP PAN Cracow1.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
Silicon sensor module production for PHENIX FOCAL S.H. Lim Yonsei University.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Status report on studying and preventing ageing in the LHCb OT S.Bachmann (on behalf of the LHCb OT group) Physikalisches Institut Heidelberg Many thanks.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
14/12/20111 Chip in board encapsulation Julien Bonis
The Golf Ball Challenge Intro to Forces. Design Challenge: Points of Contact ?!
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Shear test with irradiated samples NA62 - DIPTEM Genova – UCL
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
Specification section 3.4
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
ATHENA - Module Construction P. Riedler, J. Rochet.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Quality-evaluation of Cesium Iodide photocathodes for the ALICE/High Momentum Particle Identification detector by means of a VUV-Scanner system Herbert.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Creating Fiberglass Components Using the Lost-Foam Method.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Warm Vessel Leveling Islands (Piers)
Toughest acrylic and Epoxy adhesives
ATLAS pixel module assembly flow
Hybridization Studies: SU8, Assembly
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Report on Bonding at Catania
CCPD Hybridization AIDA-2020 Annual Meeting – WP6 DESY, 15 June 2016
Shear test with irradiated samples
Equipment for Assembly – UK Experiences
Joining Metals.
Module/Ladder Assembly
Capacitor Assembly K. McFarlane 9/30/02 9/30/2002 TRT meeting Oct 2002
Module Production in Brussels
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Joining Metals.
Home Insurance and a Home Protection Plan What’s the Difference?
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005 Protective cover of glue on the bonding pad site on the back of the cms module, HV contact. Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005

EPOTEK 87GT Best glue Epotek 87GT , epoxy type , Cure at 50-90 °C for 1 hour Mix the 2 parts in equal quantity Good electrical and mechanical characteristics, see the data sheet Feature: Does not spread The cost is medium not so high

ARALDITE RAPID Araldite rapid Ciba, epoxy 2 component like the other. Hardens at room temperature in 1 hour The spot of glue spreads during hardening Low cost

Positioning of the glue spot Manually with a sharp pointed tool under microscope (5 minutes for the operation). Otherwise with an automatic dispenser gantry like but in this case we must use normal araldite (AW101), not rapid.

Negative issues For 87GT a problem is the curing (minimum temperature: 50°c for 1 hour) For all it is impossible to repair without damaging the detector. The bonding jig must take into account this glue ball for up-face detector bonding

The two glues tried

Comparison between glues