Elliptical Mobile Solutions Micro-Modular Data Centers™

Slides:



Advertisements
Similar presentations
Challenges in optimizing data center utilization
Advertisements

Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Text Chiller Plant Optimization that Reduces Energy Consumption 20-50%
Tivoli Storage Manager v. 4.1 Executive Presentation.
Presented by Paul Almond – Datacentre UK
SAN DIEGO SUPERCOMPUTER CENTER at the UNIVERSITY OF CALIFORNIA, SAN DIEGO Green Datacenter Initiatives at SDSC Matt Campbell SDSC Data Center Services.
< C ² Carbon Reduction Technology Ltd A Revolution in Lighting - The e-lamp.
Introduction to Sustainable Solutions
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
ACTIVE LEARNING PROCESS
Arizona Priority Lists Charlie Gohman Az Dept of Commerce Energy Office.
Building a Better Future Stretch Building Code October 15, 2009.
Emerson in the Energy Sector Stephen C. Hassell President, Avocent 17 August 2012.
Presentation Heading Air Source Heat Pumps Jordan Jeewood
Scotch Marine Boiler Design
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 Building Data Entry Issues in NEAT/MHEA and Oak Ridge National.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Optimizing High Density Cooling Solutions for Data Centers
© 2010 IBM Corporation Data Center Actions That Your CFO Will Love Bob Tierney IBM, Site and Facilities Services March 26, 2010.
1 Room Planning Service Area.
Data Centre Capacity and Electricity Use How the EU Code of Conduct can help your data centre electricity bill Chris Cartledge Independent Consultant
Chapter 1 Introduction to the Programmable Logic Controllers.
Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
Chapter 1: Introduction to Scaling Networks
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Saving Energy In Schools Okehampton College - Devon.
North American Mechanical Inc. School District of Cambridge A Business Relationship Presentation Use our energy to save yours®
PRESENTED BY: FELIX A. NEGRON AMERICAN PRECIOUS METAL RECYCLING LLC As of 23 February Mining Projects in 7 Countries.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
Transportation Engineering Name Title Company School, Date, or Other information on where you are making the presentation.
Hot Aisle vs. Cold Aisle Containment
A/C Final Project: Design Builder
WELCOME to JBT Food Tech presentation Food Town Concept Bulgaria
On-Demand Architecture for Network-Critical Physical Infrastructure
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Introduction to ikhlas ikhlas is an affordable and effective Online Accounting Solution that is currently available in Brunei.
Chapter 4 Ohm’s Law, Power, and Energy. 2 Ohm’s Law The current in a resistive circuit is directly proportional to its applied voltage and inversely proportional.
EMS Case Studies 1. Mobile Hardened Infrastructure 2 NATO/OTAN Confidential 2012 – Challenges: NATO needed a data center.
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Cooling Product Positioning
02/24/09 Green Data Center project Alan Crosswell.
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
Architecture for Modular Data Centers James Hamilton 2007/01/08
Current trends in data centre outsourcing
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
CHAPTER FIVE INFRASTRUCTURES: SUSTAINABLE TECHNOLOGIES
Mission Energy: Energy Efficient Cooling How Data Centre energy consumption and operating costs can be significantly reduced through readily available.
MISSION CRITICAL COLOCATION 360 Technology Center Solutions.
1 Nassau Community CollegeProf. Vincent Costa Session 7 Infrastructures Sustainable Technologies CMP 117 Business Computing: Concepts &Applications.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Name of Building(s) or Project Speaker(s) Organization(s)
Progress Energy Corporate Data Center Rob Robertson February 17, 2010 of North Carolina.
ThinDesk, Inc.. What is Thin Computing?  IT Industry is buzzing about Green IT, Virtualization both in the Data Centre and on the Desktop, Public / Private.
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
© 2014 Eaton. All Rights Reserved.. Eaton 93PM: Value, Benefits, and Features.
1 PCE 4.4 New Development In DC Containment Steve Howell.
A Simply Smarter Solution economical, secure, integrality, peace of mind User Friendly Information Systems, Inc. Data Co-location Center, the ultimate.
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
Liebert DSE High efficiency thermal management
Presentation transcript:

Elliptical Mobile Solutions Micro-Modular Data Centers™ EMS Introduction

Agenda Industry Product Data Center Challenges Modular/Container Based Data Center Evolution Product Product Overview and Walk-Through Value Proposition for EMS Products Applications

Industry and Market Review

What is a data center? The data center is a physical place that houses a network's most critical systems, including backup power supplies, fire protection systems, air conditioning, and security.

The Challenge Data Centers, Network Closets, Remote Office and Cloud Computing applications are inefficient, expensive to build and operate, and don’t scale well to match business and infrastructure needs. Huge construction costs (Up to $1,300/sq ft) Long time to build (up to 24 months) Have to build the whole thing up front and hope IT catches up Inefficient = high cost to operate

Mechanical Aspects of Today’s Data Centers

Why Containerized Systems? Connect the “Facility” (building shell) together with the complete package for the best possible efficiency. Reduce starting costs and operational expenses. Create a standardized platform that can adjust to the rapidly changing information technology environment.

Early Adopters of Containerized Data Centers

What is a “Micro-Modular Data Center” (MMDC)? The natural evolution from large, brick and mortar data centers to 40ft/20ft data centers built in shipping containers to rack-level data centers. Simply add power, network and IT equipment . BRICK & MORTAR CONTAINER MMDC

Product Review

Elliptical Mobile Solutions MMDC Line All EMS Micro-Modular Data Centers share the following characteristics: Standard 19” Vendor Agnostic Rack Enclosures Closed-Loop Cooling —deliver cooling directly to the equipment with no wasted energy Hardened and Sealed Enclosures—designed for indoor and outdoor use Built-in Shock/Vibration Isolation—designed to be moved fully populated without damaging equipment

Elliptical Mobile Solutions C3-S.P.E.A.R. line 24U of rack space Standard with single AC, optional top mounted AC for redundancy or added capacity NEMA 12 (Indoor) or NEMA 4 (outdoor) models available Provides cooling for 2.5KW to 6KW of IT Load C3-S.P.E.A.R. MOBILE C3-S.P.E.A.R. RELOCATABLE C3-S.P.E.A.R. RUGGEDIZED C3-S.P.E.A.R. NEMA 4 DUAL COOLING Confidential 2011 – www.ellipticalmobilesolutions.com

Patented Closed Loop Cooling All of our products allow you to establish a computing environment or data center anywhere. All that is needed is power and connectivity. Cooling, fire protection, EMI shielding, security, raised floor, hot and cold aisle, are all self- contained in each enclosure. INSIDE AIR AND OUTSIDE AIR NEVER MIX Confidential 2011 – www.ellipticalmobilesolutions.com

Elliptical Mobile Solutions R.A.S.E.R. Line 42U of rack space Air-cooled (DX) or water-cooled (HD) enclosures available All models rated for both indoor and outdoor use Provides cooling for 12KW to 80KW of IT load R.A.S.E.R. HD R.A.S.E.R DX R.A.S.E.R WITH MISSION CRITICAL VENTING

R.A.S.E.R. DX In addition to standard features of all MMDC’s, the R.A.S.E.R. DX features: 12KW Closed-Loop Cooling Industrial A/C unit with manufacturer spec mean time between failure of more than 52 years NEMA 3R or NEMA 4 (both can be used outdoors Mission critical venting (optional) Protects equipment in the event of an A/C failure

R.A.S.E.R. HD The most powerful MMDC, supporting between 20KW and 80KW of IT capacity Water chilled unit with the ability to provide a 2N redundant solution with redundant water inputs and multiple hot-swappable fans “High Temperature” Water Cooling option due to the extreme efficiency of the enclosure. (removing chillers can reduce energy costs by up to 40% alone!) Field upgradable heat exchangers Built-in environmental monitoring for air temperature, water flow and temperature, leakage, humidity and fan speed

Value Proposition

Data Center Challenges Today Limited Cooling/ Electrical Capacity Unable to Adapt to Changing Requirements Runaway Electrical Bill Cost Expensive Retrofit for High Density Zone Constant Demand for Expansion Under Utilized Compute Resources Virtualization Infrastructure Challenges Technology Refresh Data Center Consolidation Energy Saving Initiatives Expensive Build Cost Floor Space Constraints Inflexible Infrastructure

Confidential 2011 – www.ellipticalmobilesolutions.com EMS Value Proposition Reduce capital costs (more economical to build) Reduce Operating Costs (more economical to operate) Ultimate scalability and flexibility in deploying infrastructure to support IT Confidential 2011 – www.ellipticalmobilesolutions.com

Critical IT Facility Issues Critical Problem 1 Problem: Upfront capital cost associated with facility infrastructure deployment Effect of Problem: Facilities built for future needs inefficient and expensive How does EMS Resolve the Problem: EMS enclosures are flexible and perfectly scalable Value Proposition: Capital Expense reduction Lower costs vs. traditional data center deployments Lower costs vs. modular/container deployments Lower costs vs. remote office/network closet deployments Confidential 2011 – www.ellipticalmobilesolutions.com

Critical IT Facility Issues Critical Problem 2 Problem: Limited Energy and highly inefficient cooling in data center Effect of Problem: Data Centers running out of power due to so much power allocated to cooling the IT equipment How do you Resolve the Problem: Cool equipment within the enclosure rather than the entire facility Value Proposition: Operating expense reduction Efficiency demonstrated in cooling “only the equipment” vs the entire room achieves up to 75% reduction in electricity costs. Power Usage Effectiveness (PUE) as low as 1.1 (typical PUE for a standard data center is 2.0, meaning that for every watt of power delivered to the IT equipment, an additional watt is used to support the equipment from an electrical and cooling perspective) RASER HD allows for “high temp” water cooling, removing water chillers from the OPEX equation. = Would you take the milk out of your refrigerator and cool your whole house to keep the milk cold? 21

Critical IT Facility Issues Critical Problem 3 Problem: Space constraints / Lack of flexible space to deploy IT Effect of Problem: Computing requirements outrun facility physical capacity, limited options relative to where IT is deployed How do you Resolve the Problem: EMS enclosures reduce the data center footprint by 75% and offer the ultimate flexibility in where IT is deployed. Value Proposition: Footprint Optimization Due to the ability to deploy higher density equipment, significant floor space reduction can be achieved. Due to the nature of the hardened enclosures, IT can be deployed in unimproved spaces, even outside. EDI Case Study Comparing a Traditional Data Center Design to a Design Based on Elliptical Mobile Solutions’ R.A.S.ER. Micro-Modular Data Centers Greater Flexibility in Use of Space The EMS Cabinet offers a drop in place infrastructure that can be placed in any environment. This allows flexibility in site with strict floor space limits and even allows the client to implement this solution in less traditional spaces (boiler room, outdoor space, etc). The traditional approach requires a finished space within reasonable distances of an exterior wall or roof area where supporting mechanical equipment can be placed. The development of the finished space would include basic improvements such as floors, ceiling, walls, insulation, access, access control, grounding, lighting, and general power. 22

Practical Applications and Examples

Practical Applications R.A.S.E.R. DX R.A.S.E.R. HD C3-S.P.E.A.R. New Data Center and Data Center Consolidation HPC Cloud Computing High Density Zone Remote Locations Disaster Recovery Remote Office IT on the Move Telco Industrial / Harsh Environments Data Center Closet

Example 1: Small Office Data Center High growth company in need of a data center closet ECOtality, Inc. is a leader in clean electric transportation and storage technologies. ECOtality is the parent company of ECOtality North America, Innergy Power Corporation, and Fuel Cell Store. Challenges: Ecotality needed to build a data center closet to support the rapid growth of the company. Solution: The C3-S.P.E.A.R. allowed them to deploy a data center in one of their manufacturing warehouse in under 8 weeks. The C3-S.P.E.A.R. also provided a “Clean IT” solution consistent with the company’s mission. Benefits: Rapid deployment; $120,000 capex savings by not converting valuable office space into a data closet; scalability, and the ability to relocate the data center to a new location as the company grows. Confidential 2011 – www.ellipticalmobilesolutions.com

Example 2: Disaster Recovery Medical Group in need of a relocatable disaster recovery solution CVC is the largest provider of cardiovascular medicine in Arizona. Its state-of the-art facilities offer sophisticated medical consultations and advanced testing including vascular and cardiac ultrasound, surgical diagnostics, nuclear cardiology, electrophysiology and sleep studies. Challenges: The client was in need of a disaster recovery solution, but did not want to use a hosting facility or build a data center closet in a separate location. Data Center Retrofit Solution: The group purchased a C3-S.P.E.A.R. with a skid cart bottom to house its IT equipment. Located in an empty room in one of its offices, the enclosure can easily be relocated to a different location using a pallet jack. Benefits: Rapid deployment in 8 weeks and under budget; drop in place architecture which greatly reduced CapEx and OpEX costs; improved performance and simplified implementation.

Example 3: Remote Office Support Largest trial court in the United States in need of remote office support. The Los Angeles County Superior Court is the largest trial court system in the United States with 600 courtrooms and 50 courthouses. The Courts serve 9.5 million people throughout the 4,000 square mile county. About 100,000 people use the court system each day for traffic violations; family law and probate matters; small claims; as well as civil, juvenile and criminal cases. Challenges: Los Angeles County had a budget deficit with little money to spend while needing remote data centers for their court system. A strained California power grid provided constant problems to power and cool their existing data center. Additionally, Los Angeles is located in one of the most disaster prone areas of the country, requiring the court to have a disaster tolerant infrastructure. Solution: The courts purchased six C3-S.P.E.A.R.s with Mission Critical Venting. This allowed them to eliminate downtime while providing remote offices with a secure, flexible infrastructure to protect their court records and data bases. Benefits: Rapid deployment in 10 weeks; security,; scalability for long term growth; mobility; and shock and vibration protection. Confidential 2011 – www.ellipticalmobilesolutions.com

Example 4: Harsh Environment Native American Tribe in need of a data center closet/mobile disaster recovery solution. The Hopi are a Native American people who live on the 2.5M square foot Hopi Reservation in Northeastern, AZ. The Hopi Headquarters are in Kykotsmovi, a remote area of Arizona, prone to severe rain, floods, snow and ice. Challenges: The Hopi Data Center often experienced IT downtime due to frequent power outages, unreliable backup power generation, flooding during monsoon season, and snow during the winter. The Hopis wanted to have the ability to relocate their environment to their location in Flagstaff if necessary. Data Center Retrofit Solution: The Tribe purchased 1 C3-S.P.E.A.R. And 1 C-S.P.E.A.R. which provided it with a secure, reliable and flexible infrastructure to protect their data bases. The mobility feature of the enclosure made it the most practical choice as both can easily be relocated in the event of severe weather. Benefits: Rapid deployment in 8 weeks and under budget; drop in place architecture which greatly reduced CapEx and OpEX costs; improved performance and simplified implementation.

Example 5: High Density Data Center Consolidation White Sands Missile Range New Mexico Challenges: Needed to build a data center to support High density Cisco UCS and EMC without upgrading or modifying Legacy traditional raised floor. They are planning to move in next 24 months and wanted to go GREEN at the same time. Solution: The RASER DX allowed them to deploy a GREEN data center in under 8 weeks. The RASER DX can be moved into new facility without upgrading the new building and not having to un-rack the IT equipment. Benefits: Rapid deployment; $900,000 cap ex savings by not retro fitting current data center, scalability, and the ability to relocate the data center to a new location as planned.

Example 5 (cont): High Density Data Center Consolidation Facility was only 3% of total cost vs. 50%. Less than a $100,000 to deploy $1.8 Million in new IT vs. $900,000 to upgrade the entire facility. Eliminated CRAC units and Chillers completely UPS AND GENERATORS can now support HVAC and IT load. Allowed client to upgrade everything this year instead of 24-36 months from now.

Q&A