TGs Process, September Date: Author: September 2009

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /2142r1 Submission July 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, July Date: Authors:
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE P /187r1 Submission January 2009 Donald Eastlake 3rd, MotorolaSlide 1 TGs Los Angeles Closing Report Date: Authors:
Doc.: IEEE /0235r0 Submission February 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, February Notice: This document has been prepared.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /1386r0 Submission September 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, September Notice: This document has been prepared.
Doc.: IEEE /840r1 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /0380r1 Submission March 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
Doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared.
TGs Dallas Closing Report
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, July Date: Author: July 2009 July 2009
Mesh Networking Task Group Process
TGs Atlanta Closing Report
TGs Process Date: Authors: November 2005 November 2005
TGaf Waikoloa Closing Report
TGs Process Date: Authors: July 2005 July 2005
TGs Montreal Closing Report
TGs London Closing Report
TGs Process Date: Authors: September 2005 September 2005
IEEE TGaf Waikoloa Closing Report
TGs Process, July Date: Author: July 2009 July 2009
TGs Process Date: Authors: March 2005 March 2005
TGs Process, March Date: Authors: May 2006 May 2006
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGs Process Date: Authors: July 2005 July 2005
IEEE TGaf Dallas Closing Report
TGs Process Date: Authors: March 2005 March 2005
TGaf San Antonio Closing Report
TGs Process, March Date: Authors: March 2006 January 2006
TGs Process, September Date: Author: September 2008
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, November Date: Authors: November 2007
TGs Process, November Date: Author: November 2009
TGs Process, July Date: Authors: July 2006 July 2006
TGs Process, November Date: Authors: November 2007
TGaf Waikoloa Closing Report
TGs Process, March Date: Authors: March 2007 March 2007
July 2009 Mesh Meeting Agenda
TGs Process, July Date: Author: July 2009 July 2009
TGs Process, February Date: Authors: February 2007
TGs Process, March Date: Authors: May 2006 May 2006
IEEE TGaf Palm Springs Closing Report
TGak November Closing Report
TGs Process, September Date: Authors: September 2007
TGs Process, January Date: Authors: January 2007
TGs Dallas Closing Report
TGs Process, November Date: Authors: November 2006
TGs Process, November Date: Authors: November 2006
TGs Process, March Date: Author: March 2009 March 2009
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGs Process, January Date: Authors: January 2007
TGs Process, May Date: Authors: May 2007 March 2007
Closing Report Date: Authors: July 2009 July 2009
TGaf San Antonio Closing Report
TGs Denver Closing Report
TGs Process Date: Authors: March 2005 March 2005
TGs Process, May Date: Authors: May 2007 May 2007
TGs Process Date: Authors: May 2005 May 2005
TGs Taipei Closing Report
Mesh Networking Task Group Process
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

TGs Process, September Date: 2009-09-16 Author: September 2009 doc.: IEEE 802.11-09/971r0 September 2009 TGs Process, September Date: 2009-09-16 Author: Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

September 2009 doc.: IEEE 802.11-09/971r0 September 2009 Abstract Slides for discussion of the IEEE 802.11 TGs process in getting through Sponsor Ballot and beyond. Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

Mesh Networking Task Group Process September 2009 Mesh Networking Task Group Process TGs Motto: “Perfection is achieved not when there is nothing left to add but when there is nothing left to take away.” Donald E. Eastlake 3rd (Stellar Switches) <d3e3e3@gmail.com> +1-508-634-2066 Donald Eastlake 3rd, Stellar Switches

Process of Getting to Letter Ballot and Beyond September 2009 doc.: IEEE 802.11-09/971r0 September 2009 Process of Getting to Letter Ballot and Beyond Completed Steps | Future Steps (early steps) Refine Draft 1st Letter Ballot – November 2006 – Fails Resolve Comments 2nd Letter Ballot – March 2008 – Fails 3rd Letter Ballot – March 2009 – Passes! Recirculation – September 2009 Resolve Comments and Recirculate – November 2009 Resolve comments and Recirculate – January 2010 Sponsor Ballot – March 2010 (?) Recirculations Final WG/EC Approval IEEE SB REVCOM Approval Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

September 2009 doc.: IEEE 802.11-09/971r0 September 2009 Refining the Draft Letter Ballot #93 on Draft D1.0 authorized at November 2006 meeting. Approval: 48%. 5,713 comments Letter Ballot #126 on Draft D2.0 authorized at the March 2008 meeting. Approval: 61%. 1,964 comments Letter Ballot #147 on Draft D3.0 authorized at the March 2009 meeting. Approval: 79%, 1,195 comments, PASSES Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

3 Cycles of Comments and Resolution September 2009 3 Cycles of Comments and Resolution Call for Informal Comments Comment Resolution Comment Resolution WG Letter Ballot / Recirculation Sponsor Ballot / Recirculation Comment Resolution Donald Eastlake 3rd, Stellar Switches

LB #147 Comment Resolution Progress September 2009 LB #147 Comment Resolution Progress Total Editorial Technical   Open Closed Initial 1195 418 777 Montreal 47% 53% 21% 79% 61% 39% San Francisco  28%  72%  8% 91%  38%  62% Waikoloa Donald Eastlake 3rd, Stellar Switches

Schedule Projected at San Francisco, California, (July) Meeting September 2009 doc.: IEEE 802.11-09/971r0 September 2009 Schedule Projected at San Francisco, California, (July) Meeting May 2009 (Montreal, Qubec) Comment Resolution July 2009 (San Francisco, California) September 2009 (Waikoloa, Hawai‘i) Comment Resolution, Letter Ballot Re-circulation November 2009 (Atlanta Georgia) Comment Resolution, LB Recirculation January 2010 (Garden Grove, California) March 2010 (Orlando, Florida) Comment Resolution, Sponsor Ballot Authorized May 2010 (Beijing, China) July 2010 (San Diego, California) Comment Resolution, SB Recirculation Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

November– Atlanta Meeting Schedule September 2009 doc.: IEEE 802.11-09/971r0 September 2009 November– Atlanta Meeting Schedule September is an Interim 802.11 meeting. We will probably have about 16 hours (8 regular 2 hour sessions): 1 hr Opening Session: Administrivia, Minutes, Agenda, Process 14 hour Comment Resolution and Draft Improvement 1 hr Closing Session: Process, Teleconferences /Ad Hocs Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

Schedule Projected at Waikoloa, Hawai‘i, (September) Meeting doc.: IEEE 802.11-09/971r0 September 2009 Schedule Projected at Waikoloa, Hawai‘i, (September) Meeting July 2009 (San Francisco, California) Comment Resolution September 2009 (Waikoloa, Hawai‘i) November 2009 (Atlanta Georgia) Comment Resolution, Letter Ballot Re-circulation January 2010 (Garden Grove, California) Comment Resolution, LB Recirculation March 2010 (Orlando, Florida) May 2010 (Beijing, China) Comment Resolution, Sponsor Ballot Authorized July 2010 (San Diego, California) September 2010 (Waikoloa, Hawai‘i) Comment Resolution, SB Recirculation Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

TGs Activity Between Meetings September 2009 doc.: IEEE 802.11-09/971r0 September 2009 TGs Activity Between Meetings TGs Activities Between Meetings Requiring Notice: One or more face to face ad hoc meetings, requires 30 days notice. One or multiple Teleconferences, requires 10 days notice, not more often than weekly. Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

TGs Activity Between Meetings September 2009 doc.: IEEE 802.11-09/971r0 September 2009 TGs Activity Between Meetings Previously scheduled: Completed Teleconferences: July 29 & September 16 Time: 10am Eastern US Time. Possible future Teleconferences Suggest scheduling teleconferences through the Atlanta meeting ~ every three weeks: October 7, October 28, November 11 Time: 10am or 5/6pm Eastern US Time Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

Future Inter 802.11 Meeting Activities September 2009 Future Inter 802.11 Meeting Activities Ad Hoc possibilities TGs could meet somewhere between Waikoloa and Atlanta or shortly after Atlanta. However, travel budgets seem to be limited. Donald Eastlake 3rd, Stellar Switches

References Earlier TGs Process Submissions Draft P802.11s D3.03 September 2009 doc.: IEEE 802.11-09/971r0 September 2009 References Earlier TGs Process Submissions July 2009, 11-09/811r2, San Francisco, California May 2009, 11-09/523r0, Montreal, Quebec March 2009, 11-09/352r1, Vancouver, British Columbia January 2009, 11-09/175r1, Los Angeles, California November 2008, 11-08/1326r1, Dallas, Texas September 2008, 11-08/1049r2, Waikoloa, Hawai‘i July 2008, 11-08/831r2, Denver, Colorado May 2008, 11-08/570r2, Jacksonville, Florida March 2008, 11-08/320r1, Orlando, Florida January 2008, 11-08/82r1, Taipei, Taiwan Draft P802.11s D3.03 11-09/471r13, LB#147 Comments Resolution Spreadsheet Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches