Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGs Process, July Date: Author: July 2009 July 2009

Similar presentations


Presentation on theme: "TGs Process, July Date: Author: July 2009 July 2009"— Presentation transcript:

1 TGs Process, July Date: 2009-07-16 Author: July 2009 July 2009
doc.: IEEE /811r1 July 2009 TGs Process, July Date: Author: Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

2 July 2009 doc.: IEEE /811r1 July 2009 Abstract Slides for discussion of the IEEE TGs process in getting through Sponsor Ballot and beyond. Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

3 Mesh Networking Task Group Process
July 2009 Mesh Networking Task Group Process TGs Motto: “Perfection is achieved not when there is nothing left to add but when there is nothing left to take away.” Donald E. Eastlake 3rd (Stellar Switches) Donald Eastlake 3rd, Stellar Switches

4 Process of Getting to Letter Ballot and Beyond
July 2009 doc.: IEEE /811r1 July 2009 Process of Getting to Letter Ballot and Beyond Completed Steps | Future Steps (early steps) Refine Draft 1st Letter Ballot – November 2006 – Fails Resolve Comments 2nd Letter Ballot – March 2008 – Fails 3rd Letter Ballot – March 2009 – Passes! Recirculation – September 2009 Resolve Comments and Recirculate – November 2009 Resolve comments and Recirculate – January 2010 Sponsor Ballot – March 2010 (?) Recirculations Final WG/EC Approval IEEE SB REVCOM Approval Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

5 July 2009 doc.: IEEE /811r1 July 2009 Refining the Draft Letter Ballot #93 on Draft D1.0 authorized at November 2006 meeting. Approval: 48%. 5,713 comments Letter Ballot #126 on Draft D2.0 authorized at the March 2008 meeting. Approval: 61%. 1,964 comments Letter Ballot #147 on Draft D3.0 authorized at the March 2009 meeting. Approval: 79%, 1,195 comments, PASSES Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

6 3 Cycles of Comments and Resolution
July 2009 3 Cycles of Comments and Resolution Call for Informal Comments Comment Resolution Comment Resolution WG Letter Ballot / Recirculation Sponsor Ballot / Recirculation Comment Resolution Donald Eastlake 3rd, Stellar Switches

7 LB #147 Comment Resolution Progress
July 2009 LB #147 Comment Resolution Progress Total Editorial Technical Open Closed Initial 1195 418 777 Montreal 47% 53% 21% 79% 61% 39% San Francisco Waikoloa Donald Eastlake 3rd, Stellar Switches

8 Schedule Projected at Montreal, Quebec, (May) Meeting
July 2009 doc.: IEEE /811r1 July 2009 Schedule Projected at Montreal, Quebec, (May) Meeting March 2009 (Vancouver, British Columbia) Comment Resolution, Third Letter Ballot Authorized May 2009 (Montreal, Qubec) Comment Resolution July 2009 (San Francisco, California) Comment Resolution, Letter Ballot Re-circulation September 2009 (Waikoloa, Hawai‘i) Comment Resolution, LB Recirculation November 2009 (Atlanta Georgia) January 2010 (Garden Grove, California) Comment Resolution, Sponsor Ballot Authorized March 2010 (Orlando, Florida) May 2010 (Beijing, China) Comment Resolution, SB Recirculation Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

9 Schedule Projected at San Francisco, California, (July) Meeting
doc.: IEEE /811r1 July 2009 Schedule Projected at San Francisco, California, (July) Meeting May 2009 (Montreal, Qubec) Comment Resolution July 2009 (San Francisco, California) September 2009 (Waikoloa, Hawai‘i) Comment Resolution, Letter Ballot Re-circulation November 2009 (Atlanta Georgia) Comment Resolution, LB Recirculation January 2010 (Garden Grove, California) March 2010 (Orlando, Florida) Comment Resolution, Sponsor Ballot Authorized May 2010 (Beijing, China) July 2010 () Comment Resolution, SB Recirculation Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

10 September– Waikoloa Meeting Schedule
July 2009 doc.: IEEE /811r1 July 2009 September– Waikoloa Meeting Schedule September is an Interim meeting. We will probably have about 20 hours (10 regular 2 hour sessions): 1 hr Opening Session: Administrivia, Minutes, Agenda, Process 18 hour Comment Resolution and Draft Improvement 1 hr Closing Session: Process, Teleconferences /Ad Hocs Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

11 TGs Activity Between Meetings
July 2009 doc.: IEEE /811r1 July 2009 TGs Activity Between Meetings TGs Activities Between Meetings Requiring Notice: One or more face to face ad hoc meetings, requires 30 days notice. One or multiple Teleconferences, requires 10 days notice, not more often than weekly. Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

12 TGs Activity Between Meetings
July 2009 doc.: IEEE /811r1 July 2009 TGs Activity Between Meetings Previously scheduled: Completed Teleconferences: 2009: May 6, May 27, June 24, July 8 (all at 10AM Eastern Time) Possible future Teleconferences Suggest scheduling teleconferences through the Waikoloa meeting every three weeks: July 29, August 19, September 16 Time: 5pm or 6pm Eastern US Time. Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches

13 Future Inter 802.11 Meeting Activities
July 2009 Future Inter Meeting Activities Ad Hoc possibilities We could meet somewhere between San Francisco and Waikoloa or shortly after Waikoloa. However, travel budgets seem to be limit and hopefully we will be in Letter Ballot Recirculation after Waikoloa. Donald Eastlake 3rd, Stellar Switches

14 References Earlier TGs Process Submissions Draft P802.11s D3.02
July 2009 doc.: IEEE /811r1 July 2009 References Earlier TGs Process Submissions May 2009, 11-09/523r0, Montreal, Quebec March 2009, 11-09/352r1, Vancouver, British Columbia January 2009, 11-09/175r1, Los Angeles, California November 2008, 11-08/1326r1, Dallas, Texas September 2008, 11-08/1049r2, Waikoloa, Hawai‘i July 2008, 11-08/831r2, Denver, Colorado May 2008, 11-08/570r2, Jacksonville, Florida March 2008, 11-08/320r1, Orlando, Florida January 2008, 11-08/82r1, Taipei, Taiwan November 2007, 11-07/2812, Atlanta, Georgia Draft P802.11s D3.02 11-09/471r11, LB#147 Comments Resolution Spreadsheet Donald Eastlake 3rd, Stellar Switches Donald Eastlake 3rd, Stellar Switches


Download ppt "TGs Process, July Date: Author: July 2009 July 2009"

Similar presentations


Ads by Google