Limited Streamer Tube Project Summary

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Status of the ATLAS MM project
1 Sep. 19, 2006Changguo Lu, Princeton University Induced signal in RPC, Configuration of the double gap RPC and Grouping of the strips Changguo Lu Princeton.
Limited Streamer Tubes for the IFR Barrel Installation Review SLAC, Oct 21, 2003 Stewart Smith INFN: Ferrara, Frascati, Genova, Padova, Roma, Torino US:
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
IFR barrel upgrade: status of LST option Roberto Calabrese Ferrara University 10/18/2002.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
November 15, 2003Bill Wisniewski1 Introduction Brief Status of LST project QA Review Mechanical, Schedule and Cost Review.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Laura Ingalls Huntley Office of Science, SULI Program Franklin & Marshall College Stanford Linear Accelerator Center Menlo Park, California 16 August 2006.
Wolfgang Menges, Queen Mary The BaBar Muon System Upgrade Wolfgang Menges Queen Mary, University of London On behalf of the BaBar LST Group.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
CLAS12 Drift Chamber Prototyping
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
1 R&D status report of LST technology (2) Changguo Lu Princeton University BaBar IFR Workshop SLAC, December 8, 2002.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
Production ad Quality control of RPCs for the CMS muon barrel system
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Sensitivity of Hybrid Resistive Plate Chambers to Low-Energy Neutrons
CLAS12 - CT meeting 10 October 2013
IFR detector mechanics
First of all we will remind some numbers:
SuperB SVT Definition of sensor design and z-side connection scheme
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Module Installation
Component Tracking Use computer based tracking system
Han Jifeng BESIII MUON GROUP IHEP, CAS
Limited Streamer Tubes
RPC and LST at High Luminosity
STAR TOF MRPC Mass Production & Q.C. (USTC)
Muon Detector Jiawen ZHANG 16 September 2002.
Study on 9x9 standard single cell prototypes in Ferrara
(On Behalf of CMS Muon Group)
Resistive Plate Chambers performance with Cosmic Rays
BaBar LST Upgrade Richard F Boyce
Presentation transcript:

Limited Streamer Tube Project Summary Richard Kass Ohio State University Richard Kass

Key LST Project Goals Good efficiency to detect muons and KL’s must fit in the present barrel structure thickness of detector limited to “22mm” Long Term Reliability last until the end of BaBar Installable during summer shutdowns 1/3 in 2004 2/3 in 2005 Richard Kass

The LST Team INFN Ferrara INFN Padova INFN Genova INFN Roma INFN Frascati Ohio State University Princeton University SLAC UCSD Richard Kass

The LST building blocks We need: grounding diagram signal path cabling diagram Base Design: z-strips 38.5 mm wide 96/layer, 6912 total -strips 42.5 mm wide 2 strips/tube 4074 total 10986 channels of electronics Richard Kass

Installation of the Z-strip plane decoupled from the modules Zstrip readout plane is installed before the modules corner pieces are removed Zstrip connectors located at the backward end of the Z plane will not block insertion of the modules from forward end of the IFR Z IFR BACKWARD IFR FORWARD signal connectors z plane fabricated from 3 boards Richard Kass

Z-Strip Plane Inserted into Gap before modules Installation Z-Strip Plane Inserted into Gap before modules THE Z-STRIP PLANE SLIDES INTO THE GAP A TOOLING FOR HOLDING AND MOVING THE FOIL IS NEEDED Many issues with z strips how many sections? how are they held in place? signal connections? grounds? Richard Kass

Installation Modules Are Inserted Into Gap After Z-Strip number of tubes/modules/gap varies… Summer 2004 installation issues: how much room do we have for bottom sextant? length of tubes for bottom sextant? length of z strip boards connections? what is blocking what? Richard Kass

Tube Prototypes Four different types of tubes are under study 1) pre-prototype double layer tubes (9x9=>9x8 mm) 2) “standard” cells: 9 x 9 mm tubes 3) “small” cells: 9x8 mm double layer tubes 4) “large” cells: 15x17 mm single layer tubes baseline Very detailed studies of each tube geometry: voltage plateau mechanical stability signal quality shielding issues Results from prototypes are crucial to determine final system parameters Richard Kass

Pol.Hi.Tech. will assemble and test tubes Tube Construction and Assembly Tubes will be manufactured and assembled in Italy Pol.Hi.Tech. will assemble and test tubes Focus on quality control Inspection of Comb Shape Profiles Inspection of graphite coating Surface resistivity monitor wire stringing proceedure Inspection of end caps Test for gas leaks HV conditioning Long Range Test and Plateau measurement Add Additional Checks as necessary Richard Kass

Module Assembly Focus on quality control Tubes will be glued together to make modules Assembly sites at Princeton and OSU Focus on quality control Inspection of Shipping Boxes Tube Resisitance and Capacitance Measurement Leak Test?? Burn in Procedure (~1 week) Signal Shape Test Plateau Curve (>300V) Tube Efficiency Scan Test with Radioactive Source Inspect f strips Module burn in test (~1 weeks) Add Additional Checks as necessary Richard Kass

What Do We Have To Do? Pre-production Refine Cost estimate, WBS for IFC Design cables and understand compatibility with RPC FEC Prototyping Test present prototypes Visit PolHITech to discuss manufacture procedures Aging of PVC Double and/or single layer Decide geometries to order F strip design Z strip design Obtain standard 9x9 with high resistivity Make drawings for dies, mandrils Understand finances for prototype costs Order prototypes Test prototypes Order tubes Richard Kass

What Do We Have To Do? production Design set Q/A up Follow construction at Polytech Test tubes at PolHi Tech Ship to OSU and Princeton FEC design FEC design review Test FEC prototype FEC production Crates FEC testing FEC Q/A Design and fabricate Assembly Fixtures Material Handling, Equipment, and procedures Receive and test tubes at assembly sites Assemble modules Full system test in US Ship to SLAC Data Base setup z strip construction, QC F strip construction, QC HV System HV Distribution Monitoring, Controls (Gas System, HV, environment, etc) Simulation Monitoring electronics Cabling Gas system design Gas system fabrication Ship stuff to SLAC Receive, test, store modules at SLAC Installation fixtures Installation plan and procedure Plan for replacements, repairs Richard Kass

Issues to be resolved ¨Finalize quality control requirements ¨Length of tubes??? (3.75m??) ¨What to do about layer 18? (and bottom sextant) ¨Better understanding of ground/shielding of tubes source current vs ground plane location? ¨Reduce number of module types ? trade solid angle for ease of construction/installation ¨Which layers get brass? ¨ Can we learn something about the gap size(s) this summer? ¨ LST Gas System how much of RPC system can be used? plumbing? how much flow? backpressure? ¨ Cabling how are modules cabled? cable runs in and out of detector Richard Kass