VHT SG November 2008 Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0065r2 Submission January 2009 Eldad Perahia, Intel CorporationSlide 1 VHT SG January 2009 Report Date: Authors:
Advertisements

Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /0815r3 Submission July 2008 Eldad Perahia, Intel CorporationSlide 1 VHT SG July 2008 Report Date: Authors:
Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
VHT SG Report to EC Date: Authors: November 2008 April 2007
VHTL6 task group work plan proposal (VHTL < 6 GHz)
VHT SG November 2008 Report Date: Authors: November 2008
China MM-Wave (CMMW) Study Group May 2012 Closing Report
TGad Process Overview Date: Authors: January 2009
IEEE aj Process Overview
VHT SG July 2007 Closing Report
TGac Documents and Timeline
TGad March 2010 Closing Report
TGad September 2010 Closing Report
Proposal for TGad Selection Procedure and Timeline
VHT SG September 2008 Closing Report
TGad July 2009 Closing Report
PAD SG Closing Report Date: Authors: November 2012
PAD SG Closing Report Date: Authors: November 2012
May Liaison Report Date: Authors: May 2010
Task Group ac Process Overview
Task Group Process Overview
TGad September 2009 Closing Report
May Liaison Report Date: Authors: May 2009
VHT SG September 2007 Closing Report
TGad November 2009 Closing Report
TGad January 2010 Closing Report
IEEE aj Process Overview
VHT SG July 2008 Closing Report
TGad March 2009 Closing Report
IEEE aj Process Overview
TGad July 2010 Editor Report
TGad May 2009 Closing Report
May Liaison Report Date: Authors: May 2009
IEEE Fast Initial Authentication Study Group Closing Report
Wake-up Radio (WUR) SG November 2016 Closing Report
VHT SG September 2008 Report
Task Group Process Overview
Proposed Modifications to VHT60 PAR
Proposed Modifications to VHT60 PAR
VHT SG July 2008 Report Date: Authors: July 2008 April 2007
QoSMAN SG Closing Report – Nov 2009
China MM-Wave (CMMW) Study Group March 2012 Closing Report
July 2010 Closing Plenary Motions
VHT SG September 2008 Report
TGad March 2011 Closing Report
Video Transport Stream (VTS) SG July 2007 Closing Report
VHT SG January 2008 Closing Report
VHT SG May 2008 Report Date: Authors: May 2008 April 2007
Proposed Modifications to VHT60 PAR
VHT SG January 2008 Report Date: Authors: January 2008
MArch 2019 doc.: IEEE /r0 March 2019
TGad May 2011 Closing Report
Nov 2011 Closing Plenary Motions
VHT SG March 2008 Closing Report
VHT SG November 2008 Report Date: Authors: November 2008
VHT SG September 2008 Report
VHT SG January 2009 Report Date: Authors: January 2009
TGad January 2009 Closing Report
TGp Motions for Tuesday
IEEE LRLP TIG Long Range Low Power January 2016 Closing Report
Simulation Scenario Floor Plans
TGac January 2009 Closing Report
EHT SG formation Motion
EHT SG formation Motion
Presentation transcript:

VHT SG November 2008 Closing Report April 2007 doc.: IEEE 802.11-07/0570r0 November 2008 VHT SG November 2008 Closing Report Date: 2008-11-13 Authors: Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

April 2007 doc.: IEEE 802.11-07/0570r0 November 2008 Abstract This document is the closing report for the Very High Throughput Study Group for the November 2008 plenary session. Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

Work Completed November 2008 PAR development Technical Contribution EC report, Eldad Perahia, 08/0813r3 Feedback received on PAR and response, Jon Rosdahl, 08/1367r0 Update to PAR, 08/806r7 PAR & response to feedback approved by SG & WG Technical Contribution Designing for Coexistence, John Stine, 08/1306r0 Joint meeting w/ TGac Summary of 802.16m Development Process, Jose Puthenkulam, Vice Chair 802.16, 08/1394 Inputs for a VHT Selection Procedure, Rolf De Vegt, 08/1392r0 Introduction to VHT Usage Models, Rolf De Vegt, 08/1323r0 Timeline update - if PAR approved by EC & Nescom: TGad starts officially in January 2009 Call for chair nominations and election would occur in January 2009 Eldad Perahia, Intel Corporation

November 2008 SG Extension Motion Request the IEEE 802 LMSC to extend the 802.11 Very High Throughput Study Group. Move: Darwin Engwer Second: Rolf De Vegt Vote Y: 44, N: 0, Abs: 0 Eldad Perahia, Intel Corporation

Goals for January If EC & NesCom approves PAR April 2007 doc.: IEEE 802.11-07/0570r0 November 2008 Goals for January If EC & NesCom approves PAR Officially begin TGad (VHT60) activity Officer elections Start working on VHT60 task group documents Selection procedure Usage model Etc… Technical contributions Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

Conference call times Dec 4 – Dec 18 - Jan 15 – April 2007 doc.: IEEE 802.11-07/0570r0 November 2008 Conference call times Dec 4 – 11:00-13:00 ET Dec 18 - 20:00-22:00 ET Jan 15 – Joint call w/ TGac Usage model Possible topics for calls selection procedure other TG documents Calls do not overlap TGac calls Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation