The Integration and Test Program of the James Webb Space Telescope
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
ISIM Integration & Test Mike Drury JWST-PRES
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
KU Leuven MIRI team meeting
James Webb Space Telescope Update Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate.
1 NIRCam Monthly Science Team Telecon March 6, 2008.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
James Webb Space Telescope Integrated Science Instrument Module Status Jamie Dunn JWST/ISIM Manager JWST Partner’s Workshop May 19, 2009 JWST-PRES
GLAST Large Area Telescope:
Summary of the JWST Integrated Science Instrument Module (ISIM) and Structural/Thermal Subsystem Systems Requirements Reviews (SRRs) Jerry Kriss 04/15/2004.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
The Integrated Science Instrument Module Ground Test Matt Greenhouse ISIM Project Scientist NASA Goddard Space Flight Center 23 July 2010.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
James Webb Space Telescope (JWST) Project Status for the AAS Town Hall Phil Sabelhaus JWST Program Manager January 5, 2010.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Project Status for the James Webb Space Telescope Partner’s Workshop Phil Sabelhaus JWST Program Manager May 19, 2009 JWST-PRES
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
Hubble Science Briefing
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 Using In-situ Cryogenic Radiometers to Measure the Performance of a Large Thermal Vacuum Chamber Michael DiPirro 1, Edgar Canavan 1, James Tuttle 1,
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
JWST ISIM Primary Structure and Kinematic Mount Configuration Jonathan Kuhn, Tim Carnahan NASA/GSFC Code 542 Andrew Bartoszyk, Steve Hendricks, Charles.
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
SPP FIELDS V1234 Thermal PSR
Capitalization style for Presentation Title is “Title Case”
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
James Webb Space Telescope
Peer Review Agenda (Suggested).
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Experimental equipment Edgar L. Black February 17, 2019
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Presentation transcript:

Ray Lundquist, NASA GSFC Status of the James Webb Space Telescope Integrated Science Instrument Module Ray Lundquist, NASA GSFC

Collaborators Michael P. Drury Jamie L. Dunn Stuart D. Glazer Matthew A. Greenhouse Ed Greville Gregory Henegar Eric L. Johnson John C. McCloskey Raymond G. Ohl Pam Davila Robert A. Rashford Gurnie C. Hobbs Scott Lambros Doug McGuffey Mark F. Voyton Vicki Balzano 8442-92 SPIE ISIM Status Juli 6, 2012

JWST Full Scale Model at the Baltimore Inner Harbor 8442-92 SPIE ISIM Status Juli 6, 2012

Purge Lines and GSE Panel Harness and Harness Radiator ISIM Subsystems The Integrated Science Instrument Module contains Four Science Instruments NIRCam; NIRSpec; MIRI; and FGS/NIRISS And the supporting Infrastructure Primary Structure ISIM Electronics Compartment (IEC) Harness Radiator (HR) ISIM Command and Data Handling (ICDH) ISIM Remote Services Unit (IRSU) Thermal Control System (TCS) ISIM Flight Software (IFSW) On-Board Script System And Electrical Harnessing Purge Lines and GSE Panel ISIM Structure Thermal Straps NIRSpec IEC Radiator Baffle Electrical Harness and Harness Radiator Kinematic Mount MIRI NIRCam Harness Radiator 8442-92 SPIE ISIM Status Juli 6, 2012

Instruments are being tested and delivered NIRCam starting vacuum testing NIRSpec fully tested, but re-build is needed MIRI Completed testing and delivered to Integration and Test FGS completing vacuum testing and ready for delivery 8442-92 SPIE ISIM Status Juli 6, 2012

Instrument Status Instrument Current Testing Upcoming Test Delivery Date NIRCam Thermal/Cryo Vac Second thermal test and vibration at GSFC November 12 NIRSpec Bench level assembly Full test program April 13 MIRI Post ship functional ISIM test program Delivered (May 12) FGS/NIRISS Complete July 12 All NIR instrument detectors have a slow degradation process, called “hot pixels” which impacts sensitivity. Replacement detectors are being procured and will be replaced prior to the final ISIM system level test 8442-92 SPIE ISIM Status Juli 6, 2012

Structure Structure delivered to I&T in 2011 after completing proof testing and cryo soak/cycle to survival temperatures Fit check of MIRI STM and FGS ETU 8442-92 SPIE ISIM Status Juli 6, 2012

IEC Progress Preparation for IEC thermal balance test Thermal balance and moisture capture test of the IEC vent IEC ready for acoustics test 8442-92 SPIE ISIM Status Juli 6, 2012

Thermal Control System NIRS-1A NIRS-1B NIRS-2 Assembly NIRS-3 NIRS-4 NIRS-5 NIRSpec OA Strap - Example 13 of 30 heat straps systems have been delivered to ISIM Update to heat strap routing following the Return-to-Green effort 8442-92 SPIE ISIM Status Juli 6, 2012

Electronics ISIM remote services unit (IRSU) has been delivered and are undergoing integration verification testing Both ISIM command data handling (ICDH) units are delivered. They have completed integration testing and are ready to support ISIM integration and test 8442-92 SPIE ISIM Status Juli 6, 2012

Harnesses and Harness Radiator Aluminum Radiator Panels Two-layer Aluminum meteoroid shields; outer layer is radiating surface IEC (hot) Sis – cold side Meteoroid shield removed to show harness routing/clamps Electrical harnessing All detector interface harnesses complete and delivered Flight or test versions of all instrument interface cables have been completed. Final flight builds are continuing. No assembly picture yet All piece parts received and assembly has begun 8442-92 SPIE ISIM Status Juli 6, 2012

Software ISIM Flight Software Core software build 12.6 is complete and tested Initial version of all Science Instrument software applications have been successfully integrated with the Core Updated versions of instrument software expected with instrument delivery Modification of detector read-out schemes under investigation to reduce/improve system noise 8442-92 SPIE ISIM Status Juli 6, 2012

Optical simulator (OSIM) being installed in the test chamber Test Systems Optical simulator (OSIM) being installed in the test chamber 8442-92 SPIE ISIM Status Juli 6, 2012

Test Systems ISIM level full system test configuration 8442-92 SPIE ISIM Status Juli 6, 2012

Summary ISIM subsystem development is progressing well First cryo-vacuum test planned for March 13, without NIRSpec. Two cryo-thermal tests planned with NIRSpec NIR detector replacement plans are being developed Test equipment, facilities, and plans are in place for a successful ISIM test program 8442-92 SPIE ISIM Status Juli 6, 2012