Optimisation of Entry Capacity Modification Proposal

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Transfer & Trades Special Transmission Workstream
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Transfer & Trades Special Transmission Workstream
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
DRSEC Update Transmission Workstream 06 November 2008.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Trades and Transfers Workshop, 6 th November 2007.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
CMP Transparency Requirements
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
Update on Exit Capacity Substitution and Revision
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
LTSEC Auction Timetable
Review of Trade and Transfer Winter 09/10
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Information Provision for Transitional Exit Capacity
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Optimisation of Entry Capacity Modification Proposal Transmission Workstream 7th September

Optimisation of Entry Capacity Why is this required? Under the current regime we are obliged to release up to baseline levels at all ASEPs until a clearing allocation has been held. This can create a scenario where capacity is effectively sterilised In the last AMSEC auction we had some ASEPs that had sold out and were oversubscribed whilst others had unsold capacity. We can release non-obligated capacity If the revenue generated from releasing this capacity is not exceeded by the forecast costs associated with the release i.e. entry constraints and buy backs. Historically we have only released non-obligated capacity in the constrained period close to the gas day. In the event that we did look to release non-obligated capacity at more than one ASEP we do not have a non discriminatory process by which it could be achieved The Modification Proposal looks to address these issues

Optimisation Proposal The proposal looks to provide a non-discriminatory process that allows the optimisation of capacity between ASEPs, within a zone, in the constrained period If one ASEP has demand in excess of supply then ‘spare’ capacity from another ASEP can be transferred By transferring capacity rather than simply releasing non-obligated it is possible to reduce the cost of purchasing capacity at the ASEP. The transfer of capacity will allow the optimisation of entry capacity within a zone until constraint costs are forecast to occur.

Optimisation of Entry capacity – Key Features The process for optimisation of entry capacity can be broken down into 7 key areas;- Identification of recipient ASEPs This establishes which ASEPs require additional capacity Identification of donor ASEPs This establishes which ASEPs have capacity available for transfer Identification of capacity available to transfer This establishes the amount of capacity available to transfer within a zone Nodal Maxima This establishes the maximum level of capacity that can be transferred to the Recipient ASEP before it will start to generate costs through the management of subsequent constraints. Annual Monthly Transferable System Entry Capacity Auction This allows the User to bid for capacity which, if successful, will be transferred from a Donor ASEP. Allocation methodology This establishes how the capacity is allocated between competing recipient ASEPs and competing Users. Capacity Transfer This establishes, in the event of there being more than one possible Donor ASEP, which Donor ASEP the capacity is transferred from

Identification of Recipient ASEPs It is proposed that ASEPs which have demand for capacity in excess of baseline levels would become the ‘recipient ASEPs’ This would be established after the AMSEC auction.

Identification of Donor ASEPs ASEPs within the same zone This would identify only ASEPs in the same geographical area as the donor ASEP(s) Donor ASEPs will have a physical interaction with recipient ASEP. This would make it possible that more than one ASEP could transfer capacity to the recipient ASEP. The zones have been determined by establishing that there is a 1:1 physical interaction between the Donor and Recipient ASEP Our PCR submission for Nodal baselines has established a basis for the zones within the Network.

Transferable Capacity The proposals for identifying capacity available for transfer are as follows:- Unsold Capacity After completion of the AMSEC auction any unsold capacity at Donor ASEP(s), within the same zone as the Recipient ASEP, would be available for transfer.

Nodal Maxima This establishes the maximum level of capacity that can be transferred to the Recipient ASEP prior to generating the risk of constraints. This will be calculated after the AMSEC auction has completed. A Nodal Maxima will be established for each month that a Recipient ASEP has sold out.

AMTSEC auction An Annual Monthly Transferable System Entry Capacity auction (AMTSEC) will be held for each recipient ASEPs and for each month that the Recipient ASEP has sold out. Auction rules would be similar to existing AMSEC Pay as bid Applications would be for [April] to [March] The invitation would include:- The [1] date on which the auction would be held The transfer zones The recipient ASEP(s), and for each Recipient ASEP; The reserve price The months for which capacity can be applied for The available capacity based on the nodal maxima / available transferable capacity The Donor ASEP(s), and for each Donor ASEP; The amount of unsold capacity available to transfer Valid bids would identify level of demand for transferable capacity.

Allocation methodology The available capacity will be allocated on a price basis, with the highest priced bid allocated first. In the event there is more than one Recipient ASEP in a zone competing for capacity; then all valid bids from all the Recipient ASEPs will be considered together with the highest priced bid allocated first.

Allocation example 75 50 65 40 55 30 35 25 - Zone A Available Transferable Capacity 75 Recipient ASEP A Available capacity before Nodal Maxima reached 50 Bid List Remaining available transferable capacity in zone Remaining available capacity until Nodal Maxima reached Bid No Volume Price Allocated 1 10 Yes 65 40 2 9 55 30 3 20 8 35 4 7 25 5 6 No -

Transfer of Capacity Once the allocation has been completed the baseline at the Donor ASEP will be deemed sold to reflect the additional capacity sold at the Recipient ASEP. This will be done on a 1:1 basis For every unit sold at the Recipient ASEP 1 unit will be deemed sold from the Donor ASEPs baseline. In the event that there is more than one Donor ASEP where the capacity can be transferred from then the Donor ASEP with the lowest reserve price will have the capacity transferred first.

Treatment of revenues All revenues generated from the sale of capacity in the AMTSEC auction will be treated in the same manner as for AMSEC auctions.

Timetable Raise UNC Modification Proposal Submit to September Mod Panel 1St December implementation date

Preferred Timetable Nov 06 LTSEC Allocation confirmed Dec 06 Issue Invitation letter for AMSEC Jan 07 Hold AMSEC auction Feb 07 Establish Nodal Maxima Issue invitation letter for AMTSEC Mar 07 Hold AMTSEC auction Complete allocation process Publish allocations Apr 07 – Mar 08 Capacity transfer effective

Alternative Timetable If Mod Proposal implemented later than December 06 Feb 06 AMSEC held M+2 AMTSEC held Complete allocation process Publish allocations M+3 – Mar 08 Capacity Transfer effective for remaining relevant months in capacity year 07/08