BCM test in low current for g2p

Slides:



Advertisements
Similar presentations
Antonin Vacheret DAPNIA/SPhN, CEA Saclay.HAPPEX II Jlab Hall A Electron detectors for HAPPEX2 and He Installation in HRS Linearity tests 4.
Advertisements

Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
Cavity BPMs for Happex and G0 John Musson. Triplet Configuration…X, Y, and I TM 010 Mode for I TM 110 Mode for X & Y –Slugs provide proper excitation,
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Noise Analysis for PREx - Pb Radius Experiment Presented by: Luis Mercado UMass - Amherst 6/20/2008.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
NA62 front end architecture and performance Jan Kaplon/Pierre Jarron.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Receiver Sensitivity Sensitivity describes the weakest signal power level that the receiver is able to detect and decode Sensitivity is dependent on the.
FLASH Toroid Review Progress since last meeting in April Next steps Summary Johnny Ng FLASH Coll. Mtg. 7/25/03.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Hall A BCM Infrastructure Dave Mack July 21, 2015.
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
PVDIS at JLab 6 GeV Robert Michaels Jefferson Lab On Behalf of the HAPPEX Collaboration Acknowledgement: Talk prepared by Kai Pan (MIT graduate student)
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
5 MeV Mott Polarimeter Progress Riad Suleiman April 10, 2012.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Diana Parno – 18 April 2009 Compton Photon Detector Upgrade Diana Parno 18 April 2009 HAPPEX Collaboration Meeting.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
Jin Huang M.I.T. For Transversity Analysis Meeting Jul 02, JLab.
PREX Issues. Outline New issue: souce systematics and Aug. 07 run. Update on old issues. Progress at SU.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Moller Polarimeter Upgrading for PREx in 1)Mollar Analysis & Upgrading Works during/after 2009 PVDIS 2)Flash ADC based DAQ dead-time measurement.
Beam Position Reconstruction Pengjia Zhu 02/15/2012.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
Analog Circuits Hiroyuki Murakami. CONTENTS Structure of analog circuits Development of wide linear range CSA system Problem of analog circuits How to.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Spin Precession At CEBAF
New pre study The setup results.
Data Acquisition (DAQ) Status
March Trip Plan Mikey Davis 01 March /7.
G0 Backward Angle Accelerator Preparations
M. Jones B. Wojtsekhowski
Conceptual design of TOF and beam test results
HRS at small angles for e+/ e- pair for APEX
Noise Analysis for PREx - Pb Radius Experiment
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
1. For a resonant cavity shown below, the transmission matrix can be written as below Z=0 Z=L Prove that the E field is continuous at the interfaces, z=0.
QWeak Collaboration Meeting
Status of the Crystal Ball
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Identify the equipment such as detector, electronics modules and NIM bin. Note down detector type, size, operating voltage.
SANE – the last few days Time Period Activities 10/24-10/25
Purpose: eliminating beam trips from DAQ data.
The first signal of GEM-TPC
Injector Setup for G0 and HAPPEX & Lessons Learned
asymmetry for different acceptance cut
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
B-Team Meeting October 28, 2009
Injector Commissioning & Optimization
Presentation transcript:

BCM test in low current for g2p Pengjia Zhu May 12th 2011

g2p Polarized target NH3 Low current running 50~150 nA Test of the low current measurement in Hall A Parasitic tests with current experiment using HAPPEX cavities and DAQ Test in 25~500nA current using regular BCM and cavity with HAPPEX DAQ

BCM setup Cavity Regular BCM Beam 25~500nA Up Down Up Down -3dbm Splitter -3dbm PreAmplifier PreAmplifier emily preAmplifier ~15dB PREX preAmplifier ~30dB Downstream HAPPEX receivers Upstream V to F HAPPEX ADC Scaler

Crosscheck of upstream and downstream signal Test of signal to noise ratio of electronics and check of linearity

500,250,125,75,50,25nA emily preAmplifier ~15dB Pregain of electronic upstream 9 downstream 10

Current Dadc 500nA 130 250nA 107 125nA 95 75nA 91 50nA 88.4 25nA 87.6

Current Dadc 500nA 130 250nA 107 125nA 95 75nA 91 50nA 88.4 25nA 87.6

Current Dadc 25nA 110 50nA 113 75nA 117 100nA 128 200nA 149 PREX preAmplifier ~30dB 25,50,75,100,200nA Pregain of electronic upstream 4 downstream 6

emily preAmp Current Dadc 25nA 110 50nA 113 75nA 117 100nA 128 200nA 149

emily preAmp Current Dadc 25nA 110 50nA 113 75nA 117 100nA 128 200nA 149 75nA 91 50nA 88.4 25nA 87.6