Series 5300 Lithium Cell Formation System

Slides:



Advertisements
Similar presentations
BPS12 Battery Power Supply. December 2003 Page 2 Better Than Standard UPS systems Longer battery life –unique charging scheme DC power output –instead.
Advertisements

This lesson covers the following outcomes Unit 54 P1, P7, P8 Unit 6 P10, P11.
3U ATCA Shelf October Proprietary and Confidential-
Electrical Notes.
MP530 Maintenance. General Description  The MP530 maritime computer is used in a wide range of Operator Stations (OSs) produced by Kongsberg Maritime.
Data Logger for Water Meter Function Continuously counts pulses from pulse output of the water meter (or other meters with pulse output) and periodically.
Spectrum Analyzer Ray Mathes, Nirav Patel,
1 INPUT & OUTPUT ■ INPUT * Voltage Side ( PT side ) Operational range : 0-110% Permissible over range : 150% for 10 seconds 120% continuously * Current.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Techniques for establishing and maintaining constant temperature in ICT systems in order to reduce energy consumption Mihail Radu Cătălin Truşcă, Ş. Albert,
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
POWER PLANT USED IN TELECOM
UPS Battery Battery Sizing
Confidential / Property of Danfoss Drives A/S DKDD-SMC 1 Drives Division Danfoss presents - VLT ® 2800 Series.
Welcome to our World of Energy Storage Device Test Systems.
Maccor, Inc West 40 th Street Tulsa, Oklahoma USA Telephone: Facsimile: Web:
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
A new class in PC Data Acquisition Delphin Technology AG Felix Ottofuelling V5.0.
Presentation of the DriveLab Board Opal-RT Real-time institute 2009.
Electrical energy. Summary questions a)Electrical energy is energy transfer by an electric ______________. b)Uses of electrical devices include: heating.
Vadodara Institute of Engineering kotanbi Active learning Assignment on Single phase AC CIRCUIT SUBMITTED BY: 1) Bhatiya gaurang.(13ELEE558) 2)
TECHNICAL TRAINING SMART COMMANDER System Requirements CPU : 800MHz and aboveCPU : 800MHz and above Memory : 256MB RAM or HigherMemory : 256MB.
Introduction to training
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
CUE – Make Any Pump an E-Pump
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
Smart Streetlight Proof of Concept Group 3 02/25/16 Thor Cutler Tucker Russ Anthony Giordano Brandon Berry.
Smart Streetlight Proof of Concept Group 3 03/26/16 Tucker Russ Thor Cutler Brandon Berry Anthony Giordano.
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
FLATPACK Rev.5 September 2002 Updated versions may be available.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
Digital Light Sources First introduced in 2001.
Transient Waveform Recording Utilizing TARGET7 ASIC
Next Generation Calculator Measurements
APFC-03 Reactive Power Compensation Method & Settings
System Design, Implementation and Review
Hardware, Installation & maintenance
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
BioTector Diagnostic Download
I-Station Hardware, Installation & maintenance
Calorimeter Mu2e Development electronics Front-end Review
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
Newton-500 Series CAS Corporation CAS Marketing Team.
HD POWER TRANSDUCER SERIES
HD POWER TRANSDUCER SERIES
Understanding Olympian Generator Set Schematics
BCTW calibration status and future
10TR Nominal Glycol Chiller
Maximize your availability
Product Training Module
McCrometer Nano Board Test Procedure
Batteries and DC Power Supplies
Neurochip3.
Stand-By Emergency Lighting Inverter
Stand-By Emergency Lighting Inverter
Module 1 – Power Supply AMC APS-PBC-60
HD POWER TRANSDUCER SERIES
Product Training Module
Online Emergency Lighting Inverter
Online Emergency Lighting Inverter
EEG Probe Project Grant G. Connell.
Online Emergency Lighting Inverter
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Electrical traditional Chinese Instrument - Xun
Online Emergency Lighting Inverter
Online Emergency Lighting Inverter
Door Heat Exchanger: Specification
AUTOMATIC AIR-CONDITIONING SYSTEM OPERATION
Presentation transcript:

Series 5300 Lithium Cell Formation System

3 Generations of Lithium Formation Systems Series 5000 Series 5200 Series 5300

Series 5300 New Features Individual progression of each cell through the complete formation process. Higher current 2.5 amps. Up to 128 steps for each formation procedure. Cycling capability. Data collection during the formation. AC impedance (1 KHz) available as an option. Reduced size and complexity for UPS backup. Lower cost per channel (<12%).

Overall System Layout

Electronics Hardware (1) Rear view showing interface connections to cell fixture Front view showing filtered air inlet and guarded AC power switch

Electronics Hardware (2) 32 cell controller board. From left to right, cell interface connectors, output current fuses, isolation relays, heat sink,charge/discharge relays, electronic components, dc power input. Internal view, with 8 x 32 cell controller boards in top section, power supplies in bottom section and air filter on hinged door. All service access is through front door only.

Electronics Hardware (3) Interface cable for 4 cells, with 37 pin DIN style connector. Maximum cable length 3 m. Interface cables to cell fixture exit the rear of the electronics cabinets

System Functions (1) Charge and discharge at up to 2.5 amps. Charge CC to voltage limit, then CV to current limit. Charge can end on time, voltage current, amp-hours, and others including faults and safety conditions. Discharge at CC. Discharge can end on time, voltage, amp-hours, and others including faults and safety conditions. Each cell progresses individually through the formation, thus at any one time some cells can be in charge and some in discharge.

System Functions (2) Data can be recorded at intervals of 1 minute or multiple thereof. Data recorded includes voltage time, current, amp-hours, watt-hours, cycle no., and step no. Each cell has its own data file. Each cell tray has a summary data file. Up to 128 steps in each formation procedure. > 1000 cycle capability. Each group of 128 cells can be running a different formation procedure.

Technical Specifications (1) Voltage measurement range: 0 to 5.0 V Maximum charge voltage: 5.0 V Minimum discharge voltage: 2.0 V Voltage accuracy: +/- 5 mV Maximum charge current: 2.5 A per cell (limited to 400 A maximum per 256 cell cabinet) Maximum discharge current: 2.5 A Current accuracy: +/- 2.5 mA

Technical Specifications (2) Capacity accuracy: +/- 2.5 mAh at the “C” rate Time resolution: 500 mS Data recording rate: minimum 1 minute or multiple thereof Operating temperature: 5 to 35 deg.C at full current AC power input: 180 to 264V, or 360 to 500V, 3 phase, 2.5 KW per 256 cell cabinet

Software Maccor formation software is 32 bit, and normally runs under Windows 98. The control program is virtually identical to our laboratory test system software, and has a high level of maturity. Around this is a shell program that functions as an interface to the formation system hardware.

CC/CV Charge Profile

Formation Procedure (1)

Formation Procedure (2)

Grade Profile

System Safety Screen

Layout of Trays in the System

Layout of Cells in the Tray

Scramble Table

Start Screen

Main Screen

Cell Detail Screen

Individual Cell Data File

Tray Data Summary File

End of Formation Report

Report Set-Up Screen

Calibration

Start-Up and Training Maccor engineer on site for approximately one week. Check installation Power–up system Check for correct operation Re-calibrate all channels Run cell samples if available Train operator personnel Train maintenance personnel to board replacement level

Thank you