The Global Forum Electricity Ancillary Services and Balancing | Berlin, 23.11.2017 SmartNet Pilots: The demonstration of the different TSO-DSO coordination.

Slides:



Advertisements
Similar presentations
ADDRESS A ctive D istribution network with full integration of D emand and distributed energy RES ource S Marina Lombardi, Enel Distribuzione
Advertisements

EDF R&D CIM for DA Status, Feedback & Challenges.
The future Role of VPPs in Europe Pan European Balancing Market: EU-FP7-Project eBadge Workshop on DSM Potentials, Implementations and Experiences 20 th.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
EBADGE EU wide inteligent balancing market Peter Nemček.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
FOR174 _INES B ELECTRICITY STORAGE FOR RENEWABLES NINTH MEETING OF THE COUNCIL – THEMATIC EVENTS 1 FRANCK AL SHAKARCHI ATOMIC ENERGY AND ALTERNATIVE ENERGIES.
EU policy objectives and European research on Smart Grids European Commission, DG Research Henrik Dam Research Programme Officer ADDRESS international.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
Frankfurt (Germany), 6-9 June 2011 ENEL Group Italian core European base Worldwide strategy Italy’s largest power company. Europe’s second listed utility.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Frankfurt (Germany), 6-9 June 2011 Greet Vanalme – NL – RIF Session 6 – Paper 0786 The introduction of local system services – the case of storage in the.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Smart Grids: Ireland’s Unique Opportunity Doireann Barry, Smart Grid Programme Manager.
Frankfurt (Germany), 6-9 June INFRAX 2. Regulatory framework 3. Role of DSO in an open electricity market 4. Role of DSO in Smart Grids 5. Experiences.
Local Intelligent Networks and Energy Active Regions in Flanders Carlo Mol - VITO.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Measures and regulation to increase generation flexibility and controllability for systems with large shares of variables RES-E Pierluigi Mancarella, Danny.
EXEMPLE Novare: Vehicle to Microgrid Antoni Sudrià, CITCEA-UPC 2a Jornada Anual d’UPC Alumni Casa Llotja de Mar, Barcelona, 17 d’abril de 2013 Vehicle.
The Role of Energy Storage in Supporting the Energy Transition 23 June 2016 Energy Infrastructure Forum Copenhagen, Denmark Thierry Le Boucher EASE Vice-President.
Eric Peirano, Ph.D., TECHNOFI, COO
Distribution System Planning in Hawaii
Évora demonstrator site
SmartNet: A European research project to study TSO-DSO coordination for ancillary services provision from distribution networks Gianluigi Migliavacca (RSE)
ETIP SNET WG4 : Digital Energy
Advanced market schemes for allowing ancillary services from distribution networks Guillaume Leclercq Senior Consultant N-SIDE.
Agenda TSOG 8th November
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano BRIDGE Support Team, Technofi
A new platform for testing TSO-DSO coordination schemes
Asia-Pacific Energy Regulatory Forum
DS3 and Qualifier Trials Update
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
Regulatory ‘Do’s’ and ‘Don’ts’ for DSOs to serve consumers’ interests Garrett Blaney co-chair, CEER Distribution Systems Working Group CEER Annual Conference.
Challenges of integrating Variable Renewable Energy Sources (V-RES)
Ben Voorhorst, President, ENTSO-E
PowerTech 2017, Manchester| 19 June 2017
STATE ENERGY AND WATER REGULATORY COMMISSION
Presentation of the three technological pilots
37th IG Meeting South Gas Regional Initiative
KORRR INFORMAL STAKEHOLDER WORKSHOP
RealValue H2020 Overview RealValue project funded under H2020 LCE 8 – 2014: Local / small-scale storage Commenced 1st June 2015 (duration 36 months) EU.
Évora Demonstrator Site
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
Opportunities in the Changing Energy System
EU-IPA12/CS02 Development of the Renewable Energy Sector
37th IG Meeting South Gas Regional Initiative
Smart Grid Subcommittee Report
Powering Towards Clean Energy in Europe
The SmartNet Project Gianluigi Migliavacca (RSE)
12th IEEE PES PowerTech Conference
37th IG Meeting South Gas Regional Initiative
EnergyNet The National Technology Initiative
Sami Repo Tampere University of Technology FINLAND
SMART GRID COMMUNICATIONS EMULATOR ( SYNTHETIC USERS)
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet project: TSO-DSO interaction architectures to enable DER participation.
Energy Supply Business Model enabled by the Clean Energy Package
Jim Mcintosh Director, Executive Operations Advisor California ISO
The way forward Gianluigi Migliavacca (RSE)
July update JANUARY 2019.
Energy Storage Roadmap & Flexibility Roadmap Information Session
Electricity Distribution and Energy Decarbonisation
Looking to the power system future An ENTSO-E perspective
Presentation transcript:

The Global Forum Electricity Ancillary Services and Balancing | Berlin, 23.11.2017 SmartNet Pilots: The demonstration of the different TSO-DSO coordination schemes and market structures Carlos Madina (Tecnalia)

Agenda Aims and goals of the pilots Timeline Presentation of Italian pilot Presentation of Danish pilot Presentation of Spanish pilot Key results

Aims and goals of the pilots Realisation of three complementary pilots to evaluate the performance of different TSO-DSO interactions under different market structures. Coordination with laboratory simulations to bridge the gap between present real-world implementation and the opportunities envisaged for the future. Identify & remove barriers to facilitate the way to the pan-European market for ancillary services.

Timeline SmartNet Project Functional specification SW & HW development Jan 2016 (start) 31 Dec 2018 (end) April 2016 July 2016 Oct 2016 Jan 2017 April 2017 July 2017 Oct 2017 Jan 2018 April 2018 July 2018 Oct 2018 SmartNet Project Coordination of pilots Realisation of Pilot A (Italy) Realisation of Pilot B (Denmark) Realisation of Pilot C (Spain) Functional specification SW & HW development Execution Technical specification Installation & testing Reporting

Centralised TSO control in high-DER area Description of the pilots Centralised TSO control in high-DER area

Energy context Large increasing of RES in the last 10 years New issues in terms of power management of the electrical grid Active power rise from MV up to HV grid Difficulty to predict RES production Italian NRA is opening the market to DG and DR through aggregators and requiring the DSO to improve observability for the TSO Needs to improve the infrastructure for monitoring and control of MV and LV levels

Centralised TSO control in high-DER area Aggregation of information in RT at TSO-DSO interconnection (HV/MV transformer) Voltage regulation by generators connected at HV and MV levels Power-frequency regulation / balancing by generators connected at HV and MV levels

Implementation in field Rotbach (1968 kW) HV Generation: 2 Hydraulic plants of 20MW each. MV and LV Generation: More then 30 plants with more than 40MW of total nominal power (Hydro, thermal and other) Mairhofer (2100 kW) Selva dei Molini (5425 kW)

Functionalities Aggregation of information in real-time at the interconnection point TSO-DSO (HV/MV transformer). Exchange of distribution data with the TSO: Load (total load, gross amount of load compensated by distributed generation); Total distributed generation at the interconnection point, differentiated by source (PV, rotating, etc.). Voltage regulation - development of an architecture and implementation of a system for the HV voltage regulation: One generation unit connected to HV grid; One or more generation units connected to MV grid; A device for each power plant in order to receive command from the TSO through the DSO. Power-frequency regulation - development of an architecture and implementation of a system for the power-frequency regulation: A device for each power plant in order to receive command from the TSO through the DSO (FRR).

The VPP is defined by P, Q and forecast  Needed for AS allocation Expected results TSO will receive aggregated data for control and to manage the allocation of services Data must aggregated by DSO, but other parties could also provide the aggregation service The VPP is defined by P, Q and forecast  Needed for AS allocation New device installed at TSO-DSO interconnection to collect data and make it available to the TSO (VPP) VC = Virtual capability, which must be defined by data aggregators TSO will know, for each VPP, the limits for P and Q (virtual capability) that may be used when activating AS

Common TSO-DSO market with pool flexibility Description of the pilots Common TSO-DSO market with pool flexibility

Common TSO-DSO market with pool flexibility Congestion management to better integrate PV, EV and HP Price-based control of thermal controllers of swimming pools in summer houses Balancing of wind power with decreasing contribution of thermal units

Implementation in field

Price-based control Advantages Highly scalable No data safety issues Very low transaction costs Disadvantage Application to all demand vs. to the provided flexibility Estimation of reaction curve

Demonstration of aggregation service in 30 rental houses (10 + 10 +10) Expected results Demonstration of aggregation service in 30 rental houses (10 + 10 +10) Implementation in field of ICT to exchange data: TSO-DSO-Aggregator-DER On-line services for price & load forecasting + model predictive control Development of an architecture for AS provision by DER through aggregation Estimation of DER reaction curves + unidirectional signals to gather flexibility

Shared responsibility with base station flexibility Description of the pilots Shared responsibility with base station flexibility

Energy context Poor interconnections 2030 Transmission adequacy (TYNDP‘16) http://tyndp.entsoe.eu/exec-report/ Poor interconnections Big contribution by highly-variable RES production

Shared responsibility with BS & EV flexibility Congestion management at DSO level Demand Response Aggregation by using storage flexibility (BS and EV) Power-frequency regulation / balancing by respecting the exchange program at the TSO-DSO interconnection

Implementation in field More than 400 Base Stations just in Barcelona Contracted power of each one from 5 kW to 15 kW

Software Flexible Tool for the DSO Balancing. Time plot of active power exchanged at TSO-DSO interconnection points Flexibility. Time plot of total flexibility volumes per market session at each TSO-DSO interconnection point (kW) CMPs. Time plot of aggregated load of customers’ portfolio of each CMP. Market prices. Time plot of the clearing price per market session at each TSO-DSO interconnection point Market results. Table of dispatched flexibility volumes per CMP per market session and node at each TSO-DSO interconnection point (kW) Network Status. Diagram of the distribution network downstream each TSO-DSO interconnection point:

Expected results Demonstration of DER aggregation service in 20 mobile phone base stations Creation of AS local market to solve DSO’s congestion issues and to share balancing responsibility Development of tools for DER aggregation and for bidding to DSO-managed local AS markets Development of tools for determining DSO’s balancing and congestion management needs

Key results Validated TSO-DSO interactions (technical + operational) Demonstrated interoperability and scalability to the whole European system. Identified barriers for real implementation and regulatory proposals Guidelines on best practices to implement the considered TSO-DSO schemes

Carlos Madina Contact Information Affiliation: Tecnalia Phone: +34 667 165 473 Email: carlos.madina@tecnalia.com