3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Norman W. Garrick Transportation Forecasting What is it? Transportation Forecasting is used to estimate the number of travelers or vehicles that will use.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009.
Mod 186 July Assumptions No provision for TMA or Tax re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October 2009.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
EHV generation charging methodology change Harvey Jones.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Three Year Preliminary Budget Forecast Our goal is to continue to provide quality education for all children in the Onondaga Central School District. Purpose.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
SGN’s July 09 Mod 186 Report DCMF Meeting – July 27 th 2009.
Mod 0428 Charge Impact October Affected Supply Point Population.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Customer Charge On behalf of all DNs 19 November 2010.
Background Current balance of LDZ System and Customer charges
Logistics Facilities Ad-Hoc Committee
DCMF Meeting – January 26th 2009
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 0283 Update
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Modification 0282 Action 002 Update
Transmission Planning Code – Draft Document
Transmission Planning Code
Historical T&D charge volatility
Mod 0621 Amendments to Gas Transmission Charging Regime
Mod 0621 Amendments to Gas Transmission Charging Regime
2008 DN Interruption Tender
LDZ System Charges – Structure Methodology 26 July 2010
Mod 0621 Amendments to Gas Transmission Charging Regime
NTS Entry Charging Review Update
Danishtah Parker 0621 Workgroup 26 April 2018
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
UNC 0621L: Amendments to Gas Transmission Charging Regime
Consideration of issues raised by UNC Modification Proposal 0244
Questions for Consultation
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
Draft Capacity & Connection Plan
Information related to auction premium
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
EU/GB Charging Project – Delivery Timescales
Parameters used on revenue aproval for period
Key movements from September 17
Mod 0621 Amendments to Gas Transmission Charging Regime
SGN 2010 Annual Tender Interruption Requirements
UNC Transmission Workstream 7th December 2006
UNC 0621L: Amendments to Gas Transmission Charging Regime
Consideration of issues raised by UNC Modification Proposal 0244
Open Letter - Summary of Responses
Overview of RbD Risk Modelling 31 March 2008
Simon Trivella – 27th March 2009 Gas Customer Forum, Elexon
Transmission Workstream, 1 Mar 07
DN Charging Methodology Forum SGN March 2019 Mod 186 Summary
Pricing and Margins Manager National Grid Distribution
Information regarding the total revenue determined according to the provisions of Order no. 99/2018 of ANRE Chairman a) The total revenue allowed to be.
Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.
First Interim Budget Highlights
Status of Preliminary Reasonable Progress Analysis
Information on accrual reconciliation account
2015 January February March April May June July August September
Introduction to the Budget Process
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

Denis Aitchison/Rob Hetherington Distribution Charging Methodology Forum Indicative Charges for October 2008 6th May 2008 Denis Aitchison/Rob Hetherington

1 October Indicative Charges Scotland -3.3% Southern +3.5% Scotia Gas Networks 1 October Indicative Charges Scotland -3.3% Southern +3.5% After change to 95:5 A Gibson Capacity manager

Implement 95:5 charges from 1 October 2008 Scotia Gas Networks Effect of change to 95:5 Method: Set 95:5 charges on full year basis to recover same revenue as existing 50:50 charges Implement 95:5 charges from 1 October 2008 A Gibson Capacity manager

Impact on Revenue Oct 08-March 09 Scotland - £15m Southern - £37m Scotia Gas Networks Impact on Revenue Oct 08-March 09 Scotland - £15m Southern - £37m A Gibson Capacity manager

Scotia Gas Networks After taking these reductions into account charges are estimated to recover the latest forecast Allowed Revenue for 2008/09 A Gibson Capacity manager

Scotia Gas Networks On 1 April 2009 will be further change to the level of charges to set to a more appropriate annual level. A Gibson Capacity manager