Hall C Dump Status Beam Resuscitation Review

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Progress and Plan for Superconducting RF Cavity RF Group.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
Future upgrade of the neutrino beam-line for multi-MW beam 5 th Hyper-Kamiokande open Vancouver July Yuichi Oyama (KEK) (for T2K neutrino.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
1 Building Design Progress Dan Wilcox March 2012.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
S A Griffiths CM42 June 2015 Electrical & Control.
Run coordinator report March 23 – 30, 2011 Brad Sawatzky JLab MCC 1:30pm Meeting March 30, 2011 Q weak.
HMS Status Steven Lassiter Jan 20, 2017.
Jefferson Lab High Power Beam Dump Refurbishment
2K Cold Box FDR Introduction
Subject: INJECTION SYSTEM Junction LINAC4-booster
CBETA Technical Review
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Impact of TIDVG problem on LSS5 dump design schedule
Helium spill in LHC tunnel
BPMs in the new Dump Line
News and brief overview of Beamline plans for the next few months
Run coordinator report March 23 – 30, 2011
XFEL Vacuum System Commissioning
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Summary of Session 5 Other Vibration Source
Anthony DiPette Installation / Vacuum Group Leader 7/17/2015
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Additional Upstream Coil Shielding
(WBS ) Alan Wootton, LLNL April 24, 2002
ISRC and LEBT Vacuum System Design
LEBT water cooling system
Tunnel hardware installation
Beam Halo Considerations for Back Angle Running
Isotope Readiness Review Run Plans
Presentation transcript:

Hall C Dump Status Beam Resuscitation Review Anthony DiPette 3/4/2016

Hall C Dump Status - BRR Required for March 14-17 Run Status Next Steps

Required for March 14-17 Run Hall C Dump Status - BRR Required for March 14-17 Run New Helium Tube Isolation Wall with Door & Radcon Lock Vacuum Tube with Temp Window Tune Mode Viewer

Hall C Dump Status - BRR Status Installed Install 3/4/16 Installed

Hall C Dump Status - BRR Status I & C to Complete Camera System Inst – Fill Helium and Vacuum Tube w/ Helium Radcon – Install Lock

Hall C Dump Status - BRR Status End Section of He Pipe

Hall C Dump Status - BRR Status Isolation Wall

Hall C Dump Status - BRR Status Downstream Vacuum Pipe Section Upstream Vacuum Pipe – with Actuators Installed

Camera Box with Periscope Tubes Hall C Dump Status - BRR Status Camera Box with Periscope Tubes

Hall C Dump Status - BRR Status High Power Viewer Periscope Tube, Diffuser Drive shaft, Iso Wall Door Hardware

Hall C Dump Status - BRR Next Steps Complete Mech: Diffuser Drive & Blower, Tunnel Shielding, Iso Wall Grouting/Sealing, Aperture Plate & Window Water Cooling System, Camera Box Shielding, N2 System Final Connect and Commission Complete Diag: Diffuser Drive & Blower, Tune Mode Viewer, Calibration Puck, Water Cooling System, N2 System, Helium Monitoring, Ion Chamber Install and Commission