Test Beam: Calorimetry

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
Muon Detector R&D Vishnu V. Zutshi NIU/NICADD. RPC based.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
KEK meeting – September 2006 J.-C. Brient (LLR) 1 Jean-Claude BRIENT LLR – Ecole Polytechnique LLR – Ecole Polytechnique CALICE status and Plans.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
J-C BRIENT LLR AGENDA CALORIMETRY and other subdetectors session J-C. BRIENT LLR Status report on the W-Si ECAL 30’ V. VRBA IP-ASCR Silicon pad sensors.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Andy White U.Texas at Arlington (for J.Yu, J.Li, M.Sosebee, S.Habib, V.Kaushik) 01/07/04 SLAC/ALCPG Development of Digital Hadron Calorimetry for the Linear.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
P. Checchia ECFA-DESY Prague1 Status report of the tile-Si Lccal * project Prototype description Production Beam test results Future plans *
SiD R&D Priorities Andy White University of Texas at Arlington SiD Workshop at SLAC March 2009.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
SiD R&D Plan and Opportunities for New Collaborators
CALICE SiW Electromagnetic Calorimeter
CALICE Silicon ECal Sensors Status and prospects
Test Beam Request for the Semi-Digital Hadronic Calorimeter
A Digital Hadron Calorimeter Resistive Plate Chambers
SiD Calorimeter R&D Collaboration
detector development readout electronics interconnects bump bonding
Status of Ecal(s) for ILD
(My personal) CALICE Report
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
ILC Detector Activities in Korea
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
Tail-Catcher/Muon Tracker Prototype
ScECAL+AHCAL+TCMT Combined Beam FNAL
GEM-based Digital Hadron Calorimetry for SiD
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
A Silicon-Tungsten ECal for the SiD Concept
GEM-based Digital Hadron Calorimetry for SiD
On behalf of CEPC calorimeter working group
Status report of the tile-Si Lccal* project
Dual readout calorimeter for CepC
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Test Beam: Calorimetry Vishnu V. Zutshi NIU/NICADD

General Comments LC calorimetry R&D: a diverse effort Apologies for missing out or inadvertently misrepresenting any particular project Most efforts are working with the Particle Flow framework in mind Schedules are tentative and reflect the technical assessment of groups and may not reflect the funding realities 4/26/2019 V. Zutshi, Snowmass 2005

Goals Establish the feasibility of the respective technologies. Validate and tune hadronic shower Monte Carlo’s. This is essential for calorimeters hoping to use particle flow Refine detector concepts G. Mavromanolakis 4/26/2019 V. Zutshi, Snowmass 2005

CALICE Si-W ECal LLR LAL, Orsay Imperial College 4/26/2019 V. Zutshi, Snowmass 2005

Si-W ECal For dense highly segmented calorimetry Minimize dead zones Minimize readout gaps (small Moliere R) 4/26/2019 V. Zutshi, Snowmass 2005

Prototype Geometry 30 layer prototype 3 independent W-CFi structures (1.4, 2.8 and 4.6mm W plates) Detectors can be slid in the gaps Active area: 3x3 wafers Each wafer has 36 1cm x 1cm pads Total channel count ~10k 4/26/2019 V. Zutshi, Snowmass 2005

Exposure to beam Test in Feb. 2005 at DESY 14 layers (~ 3k channels) 20x106 events collected Longer run with full detector in 06 Readout integration R&D continues 4/26/2019 V. Zutshi, Snowmass 2005

Kyungpook National Univ. Si-W ECal {Korea} Ewha Univ. Korea Univ. Kyungpook National Univ. SungKyunKwan Univ. Yonsei Univ. 4/26/2019 V. Zutshi, Snowmass 2005

Si-W ECal Obtained 28%/sqrt(E) Further analysis going on Beam Direction Layers of Si sensors and Tungstens Frontend readout boards Digital and Control Boards Obtained 28%/sqrt(E) Further analysis going on R&D for thinner layers and AC-coupled sensors in progress 4/26/2019 V. Zutshi, Snowmass 2005

Si-W ECal {US} BNL UC-Davis Univ. of Oregon SLAC 4/26/2019 V. Zutshi, Snowmass 2005

Si-W ECal 4/26/2019 V. Zutshi, Snowmass 2005

Readout Electronics 1 chip/wafer Chip bump-bonded to wafer 4/26/2019 V. Zutshi, Snowmass 2005

Status and Plans 1 wafer/layer (750 pixels) 30 layers 2.5 and 5 mm Tungsten plates 64-channel chip submission soon One layer beam test in 2006 Full assembly in mid-2007 4/26/2019 V. Zutshi, Snowmass 2005

Si-Scin-Pb ECal Como ITE-Warsaw LNF Padova Trieste 4/26/2019 V. Zutshi, Snowmass 2005

LCcal 45 layers 25cm x 25cm x 0.3cm Pb 25 (5cm x 5cm) Scint. Tiles 3 Si pads at 2,6 and 12 X0 4/26/2019 V. Zutshi, Snowmass 2005

Status and Plans The LCcal prototype has been built and fully tested. Energy and position resolution as expected: E/E ~11.-11.5% /E, pos ~2 mm (@ 30 GeV) Light uniformity acceptable. e/ rejection very good ( <10-3) Looking to combined tests with HCal 4/26/2019 V. Zutshi, Snowmass 2005

Scin-W ECal Colorado 4/26/2019 V. Zutshi, Snowmass 2005

Scint. ECal ½ - ¾ X0 Tungsten 5x5 cm2 tiles WLS fiber readout Cells in alternate layers are offset Starting to work with SiPM’s Working with Fermi/NIU to produce extruded scintillator with tight tolerances 4/26/2019 V. Zutshi, Snowmass 2005

Scintillator HCal DESY Imperial College ITEP JINR LAL LPI MEPhI NIU/NICADD 4/26/2019 V. Zutshi, Snowmass 2005

Scint. HCal 0.5 cm active 2 cm steel ~1000 pixels on 1mm x 1mm Bias voltage ~ 50-60V Gain ~ 106 Quantum x geom ~ 12-15% 4/26/2019 V. Zutshi, Snowmass 2005

Prototype Geometry 30 layers 8 layers 4/26/2019 V. Zutshi, Snowmass 2005

Status and Plans In the construction and assembly phase Hoping to see beam in mid-2006 4/26/2019 V. Zutshi, Snowmass 2005

RPC HCal ANL Boston Univ. Univ. of Chicago Fermilab Univ. of Iowa 4/26/2019 V. Zutshi, Snowmass 2005

RPC-based HCal 10 RPC’s built for studying no. of gaps, resistivity, chamber configuration and size 4/26/2019 V. Zutshi, Snowmass 2005

Status and Plans 40 layers 1cm x 1cm pads 64 channel custom ASIC (1-bit readout) Also used for GEM-based HCal prototype Hope to be ready for beam in 2006-07 4/26/2019 V. Zutshi, Snowmass 2005

RPC HCal {Russia} IHEP-Protvino 4/26/2019 V. Zutshi, Snowmass 2005

RPC-based HCal Was done 1. Chamber R@D itself Ongoing 2. Tests of 1m2 RPC plane with strips -1.2 mm monogap glass RPC, 6 mm thickness - robust design with 2mm steel caps - efficiency ~94 %, nonuniformity ~2% 3 .Tests of RPCs in 5T mag field in DESY -There was no difference in RPC behavior when 5T was on or off -Prototype of 64 ch. FEE printed board was tested successfully , PCB is outside of RPC and includes 8 channel MINSK chips OKA (amp.+disc.), ALTERA EP1K50 as FPGA and RS232 driver for sequental read out with PC Ongoing Beam tests in IHEP of 1 m2 RPC plane with 32x32=1024 channels (Nov05) 4/26/2019 V. Zutshi, Snowmass 2005

Univ. of Texas, Arlington Changwon National Univ., Korea GEM HCal Univ. of Texas, Arlington Univ. of Washington Changwon National Univ., Korea Tsinghua Univ., China 4/26/2019 V. Zutshi, Snowmass 2005

GEM-based HCal Ar/CO2 gas mixture Amplification with dual foils G ~ several thousand Each layer 8-9 mm thick 1cm x 1cm pads 1-bit readout 4/26/2019 V. Zutshi, Snowmass 2005

Status and Plans Signal size, cross-talk, efficiency studies with prototype detector Assembly of five 30cm x 30cm GEMs Development and testing of long foils Completion of 1m3 prototype in 2006 4/26/2019 V. Zutshi, Snowmass 2005

Dual-Readout Calorimetry Texas Tech. Univ. UC-San Diego Iowa State 4/26/2019 V. Zutshi, Snowmass 2005

DREAM Measure the EM content event by event Copper absorber structure Scintillating (dE/dX) and Quartz fiber (Cerenkov) 4/26/2019 V. Zutshi, Snowmass 2005

Status and Plans Investigate designs suitable for an ILC detector Introduce non-hydrogenous Sci-Fi 2006-07 test beam timescale 4/26/2019 V. Zutshi, Snowmass 2005

Getting together for beam 4/26/2019 V. Zutshi, Snowmass 2005

Summary Unprecedented calorimetric performances demanded at the ILC. A world-wide effort gearing up to meet this challenge 4/26/2019 V. Zutshi, Snowmass 2005