Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,

Slides:



Advertisements
Similar presentations
Critique of PU A&T Site Plan Alain L. Kornhauser, PhD 11/29/
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Translated from the original Italian by Cassius Carter.
Index The Region: East Tunnel 8 Av / Fulton St IND – Completed8 Av / Fulton St IND – Completed 8 Av / Fulton St IND – Service8 Av / Fulton St IND – Service.
Index The Region: Regional Transit West East North West Side Access Downtown: Transit Lines Catchment Areas BACKNEXT INDEXEND Lower Manhattan Transit.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
In Search of South Norwood Past By Malgorzata Woodham.
Models of Earth Snow Day 2.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
CEM-512 Value Engineering Highway Project: South Interchange.
BACKNEXT INDEXEND WTC Ground Level How compatible is the PATH- Lex connection with the current plans for the redevelopment of the World Trade Center site?
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Index The Region: Newark to Pelham Downtown: Lex Av IRT – 4, 5, 6 PATH PATH & Lex Av IRT – 6 Fulton Street Basic Alignment 2.8 BACKNEXT INDEXEND PATH-Lex.
AGENDA – PUBLIC FORUM October 12, Welcome and Background – Rod Lehnertz 2.Site Evaluation Progress Report – Joe Hibbard 3.Public Discussion 4.Closing.
Section 106 Clearance Application Missouri Local Programs How to Complete the Application for Section 106 Clearance.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Midtown Alliance Capital Improvements Program
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Project Slide Show. This 1893 photograph is of the Prather pump in the Shasta River Canyon about five miles upstream of the mouth of the river. Large.
1 Evaluation of Ports of Entry (POE) for the International Border in the El Paso MPO Study Area.
Partial Underground Analysis– TRTP Project Project Segment 8A Corridor October 29, 2011.
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 4-3:00PM | ROOM 1E-113.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
LIGHT RAIL SAFETY S t arts with You!. Light Rail Map.
Call to Order  What type of policy problem is it?  What policy would you propose to fix it? What is a problem that you think exists in Baltimore?
Click on icons for more detail; click on boxes to zoom in Indicates a picture Indicates directions 6. 2 Indicates distance from start of path Start of.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Advisor, Princeton Autonomous.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Slides for Nov 1 Planning Board Meeting. The Arts Campus Can be built without touching the Dinky.
Location and Type of Greenhouse
September 30, 2010 Whereas, Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
c One North Pavilion Ave MLS # Listed $1,500, Riverside, Burlington County, N.J Acres Cellular Leases Excluded.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
 Chinese Transportation How Chinese Transportation changed over the years By: Ben Gerchick.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
Map Symbols Kindergarten Social Studies Unit “Maps and Me” By Monica Chuppetta Clemens Crossing Elementary School.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
Before, you learned Stars seem to rise, cross the sky, and set because Earth turns The Sun is very large and far from Earth Earth orbits the Sun Now,
6.5 Eclipses Text pp An eclipse occurs when one astronomical body casts its shadow on another. An eclipse occurs when one astronomical body casts.
Town Road Survey - What You Should Know 1_24_17
Little Rapids Habitat Restoration St
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Route 1 Salisbury, Massachusetts
Preikestolen “The Rock Pulpit”
Analysis of Walk Distances to Major Venues from existing and proposed station locations by Alain L. Kornhauser 12/18/12 Format of labels: Name (Walk Distance.
New Public Transport Infrastructure
Joint Staff Suffolk Arrival and In-Processing Procedures
254 East Union Street Pre Development Plan Review
By Penelope Smith and Alan Vara
Radical Improvements for the Area's Transportation System
Presented at Princeton Future Princeton Public Library, Princeton NJ
About Rio Grande Pacific Corporation
Presentation transcript:

Full Kornhauser

Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure, University buildings, etc. As a practical matter, Palmer Square Station is an excellent idea… …for the future.

Half Kornhauser

As the Dinky comes into Princeton Township from West Windsor, it crosses two bridges, the first spans the D&R Canal and the second crosses Stony Brook where it empties into Carnegie Lake. We do not propose to begin to take the Dinky below its current grade until after it has crossed these two bridges. Bridge over Stony Brook Bridge over D&R Canal

This historic bridge is notable in two respects: First, it was built with a pivot point, shown here. It originally could be swung away to allow canal boat traffic to pass. It is now fixed in place. Second, it is a rail bridge (note daylight), and would need extensive modification to permit BRT traffic.

After crossing these two bridges, the Dinky begins climbing a steady grade into Princeton Borough. During this leg of the journey, we propose that the Dinky ROW gradually lower in respect to surface grade. While difficult to perceive in the picture at left (taken from Faculty Road looking south), the picture at right (taken of Alexander Road near Stony Brook) shows the rising topography in the vicinity of the Dinky ROW.

Faculty Road Crossing Next, the Dinky crosses University- owned Faculty Road at a grade crossing. In our proposal, the Dinky would pass under Faculty Road, eliminating this grade crossing.

An Example… While this picture is clearly a larger train than the Dinky, and includes two tracks, this approximates our proposal for the Dinkys route as it climbs to and passes under Faculty Road.

After Faculty Road, the Dinky continues uphill to the current Station. In our proposal, the Dinky completes its journey from here underground. Very expensive tunneling would be unnecessary, less expensive cut-and-cover construction would do the job. Current Dinky ROW North of Faculty Road

Arrival in Princeton The Dinky would then continue into Princeton Borough along its current route, but approximately x feet below its current route. In this plan, the rails, catenary wires, and protective fencing would be removed through this area. This would give Princeton University the barrier free conditions it needs for its Arts & Transit Neighborhood.

Princeton Station The New Dinky Station could either be a stand alone, below grade facility, OR …. … the station could be constructed as part of the proposed Performing Arts Building, shown here in a salmon color. While not shown in this graphic, the University intends for this building to have a huge below grade footprint, extending nearly to where the Dinky ROW is today.

Exiting the Station Exits for the new, below grade station could surface within the current station building, which the University currently proposes to repurpose as a café. It may well be that the café and station facilities would coexist nicely. Alternatively, the station exits could be located elsewhere…perhaps as part of the Performing Arts Building.

Advantages Picture of PUs Plan X needed here. Preserves rail service to Princeton. Dinky Station as close to downtown as today. Elimination of Faculty Road grade crossing. Requires little modification to Princeton Universitys current plan (site of transit plaza becomes commuter lot). No need to build new, above ground station.

Future Development University owned property West University owned property East The Dinky ROW is a barrier to development! If it were underground through this area… …think of the possibilities!

Future Development Finally, the Half Kornhauser plan takes us just that much closer to the day when we can make the Full Kornhauser a reality…a rail-based mass transit system right into the heart of Princetons downtown!