doc.: IEEE <doc#>

Slides:



Advertisements
Similar presentations
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
Advertisements

May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
May SG Communications Overview Matt Gillmore 02/27/2012.
Submission May 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG Washington DC Opening Report] Date Submitted: [May 4th, 2010] Source: [Don Sturek]
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
1 May 2010 SG Network TF Overview & Deliverables Ron Cunningham (vice-chair) Presented to SGAC AWP 11Jul2012.
RPL Applicability Statement for AMI IETF #81, IETF ROLL WG Québec City, Canada July 25-29, 2011 Jorjeta Jetcheva
Doc.: IEEE /0943r0 Submission July Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Submission February 2010 Don Sturek, PG&ESlide 1 Submission Title: [OpenSG San Francisco Opening Report] Date Submitted: [February 1st, 2010] Source: [Don.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task Force Re:
Draft February 2010 OpenHAN TFSlide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: February xx, 2010 Source: OpenHAN Task.
Supplementary Plenary Information - July 2010
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
2018/7/ Smart Grid Activity Will be formed as Executive Committee Study Group Depending on how PAR is developed: Option 1: Form Technical Advisory.
2018/7/ /7/29 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i May 2011 Closing report Date.
Vertical Applications TAG
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Vertical Applications TAG
Vertical Applications TAG
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
Wireless Characterization for NIST PAP#2
Faculty Champion Meeting
Supplementary Plenary Information - July 2010
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
Vertical Applications TAG
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Boot Camp - Conformity March 7, 2011 SF Bay Area.
EIM Charter Identify and articulate common EIM requirements:
<month year> doc.: IEEE < e> <March 2018>
OpenADR SRS Draft 1 Review
doc.: IEEE <doc#>
Smart Grid Teleconferences – Jan-Mar 2011
Supplementary Plenary Information - September 2010
Wireless Characterization for NIST PAP#2
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
Smart Grid ad hoc Closing Report - March 2010
EC Update on TV Whitespace ECSG
“OpenADR” “Boot Camp” Overview
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2015] Date.
Smart Grid ad hoc Closing Report - May 2010
<month year> doc.: IEEE < e> <March 2016>
Session # GRIDMAN SG Opening Report
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
TIA TR-50 M2M-Smart Device Communications
Supplementary Plenary Information - May 2010
<month year> doc.: IEEE < e> <March 2018>
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Meeting Slides Date:
Wireless Network Management
May 2015 doc.: IEEE /0496r1 May 2019 IEEE TG13 Multi-Gbit/s Optical Wireless Communication May 2019 Closing Report Date: Author:
SG Communications Boot Camp
SG Communications Sessions
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <March 2016>
Telecommunications Standards for Smart Grids
May 2015 doc.: IEEE /0496r1 May 2019 IEEE TG13 Multi-Gbit/s Optical Wireless Communication May 2019 Closing Report Date: Author:
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Closing Report Date:
doc.: IEEE <doc#>
Presentation transcript:

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> May 2010 SG-Communications TF Overview Matt Gillmore (SG-Communications Chair) 06/22/2012 Presented to OpenSG Communications Boot Camp <author>, <company>

SG Boot Camp Agenda SG Communications structure within UCAiug Overview of this weeks meeting schedule Overview of SG-Network Walkthrough of SG-Networks work Requirements Architecture reference diagram System Requirements Specification overview

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> Open SG Organization <author>, <company>

SG Communications Cincinnati Agenda <month year> doc.: IEEE 802.15-<doc#> SG Communications Cincinnati Agenda June 25th Mon 3-5 SG Communications Boot Camp June 26th Tues 10:30-noon SG-Communications WG Activity Review Tues 1-3pm SG Network SRS Working Session Tues 3:30-5pm       SG-Network / SG Simulations TBD June 27th Wed 8-10am Wed 10:30-noon SG Network Communication Requirements Session Wed 1-3pm SG-Network action items for PAP2 June 28th Wed 3:30 – 5pm OpenFAN – Review scope and charter Thur 8-10am SG-Communications Miscellaneous Work Thur 10:30-noon SG Network / PAP2 Model Issues: Payload aggregation and lose of payload volumetrics especially on latency. Page 4 <author>, <company>

SG-Network Overview Previously started as AMI-Network with a focus on network management. Scope and Charter for SG-Network within UCAiug NIST PAP 2 (Wireless standards for the Smart Grid) Supply functional requirements for Smart Grid Networks from a utility perspective Define functional domains within the Smart Grid Create a System Requirements Specification Provide information to SDO’s (e.g., IEEE P2030) Participation Utilities, Academia, Vendors

SG-Network Overview Continued Deliverables Communications Requirements Latency, How Often, Payload size, etc Database for using the requirements System Requirements Specification Pulls all of the work together Reference Architecture Diagram

SG-Network Output Progress to date: System Requirements Specification V5.1 complete Key stats: 19 payload-groupings (usecases) 204 payloads 500 payload-parent-sets 7854 requirements Database matches requirements capture V5.1

SG Network Requirements Use Cases Asymmetric payloads (with attributes, security LIC – CIA values) Payload requirement sets with: Actors (from/to pairs) for original source and consuming actors, + intermediary comm-path actor to actor flows Business focused requirements & architectural non-functional rqmts (network volumetrics e.g. how-often, reliability, latency, app-payload size) technology agnostic

SG Network Requirements (cont’d) Optional deployment scenarios per payload requirement set Commonly found/anticipated deployment profiles for AMI, Distr Apps, combinations Instructions for how to consume the requirements as documented by SG Network TF

NIST Conceptual Model

NIST Conceptual Ref Diagram

Reference Architecture from NISTIR

P2030 Smart Grid Comms Reference Architecture

Deliverables Interim Release 1.0 was published in December 2009 Requirements and some volumetric and latency requirements Interim Release 2.0 was published in February 2010 Requirements, volumetric, latency requirements, security, implications and more use cases Reference Architecture Diagram first published System requirements specification published Interim Release 3.0 was published in May 2010 Addition of the following use cases: Pre-Payment, Meter Events, DA and Outage Management System requirements specification updates Interim Release 4.0 was published in June 2010 Addition of the following use cases: DRLC, DA fault isolation and reconfiguration Interim Release 5.0 was published in October 2011 Addition of following use cases: Price Additional payload rqmts sets in especially: DR-DLC. DSDR, Field DA Maint, Firmware/Prog update, Premise Network Admin, PrePay, Volt/Var Cntl Revised How-Often syntax Interim Release 5.1 was published in March 2012

SG-Network Work output overview