Forest Biomass Heating and Electricity in Ely, MN Community Meeting February 9, 2012 Dovetail Partners University of Minnesota USDA Forest Service.

Slides:



Advertisements
Similar presentations
Chapter 19 Financing and Valuation Principles of Corporate Finance
Advertisements

U.S. Russia Energy Efficiency Workshop November 17, 2010 Public Sector Energy Efficiency Financing Presenter – Amy Chiang, VP Global Energy Government.
Resource and Energy Recovery Facility A technological breakthrough that redefines the waste-to-energy category June 26, 2009.
Source Separated Organic Materials Anaerobic Digestion Feasibility Study Prepared for Ramsey/Washington Counties Resource Recovery Project Board And the.
Technical & Economic Assessment Grid, Mini-grid & Off-grid Electrification Technologies Chubu Electric Power Co.,Inc. (CEPCO) Toyo Engineering Co. (TOYO)
WOOD FUEL – KEEPING THE CUSTOMER WARM 6 TH March 2010.
Karlovac County Situated in the central part of Croatian state territory Covers an area of approximately km 2 Population people, density.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
Woodfuel: The Community Choice Wood Heat Solutions New Forest Keith Richards 10 th March 2011
Dr. Nike Krajnc Slovenian forestry institute
Writing the Cambridge Climate Protection Plan MCAN Climate Training Day May 3, 2003 Tufts University.
An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
SHAREHOLDERS MEETING 2010 WATERFURNACE RENEWABLE ENERGY, INC.
Biomass Furnaces for Heating Poultry Houses November 2008 By Jim Wimberly BioEnergy Systems LLC Fayetteville, AR.
An Economic Solution to Dry and Densify Ligno-Cellulosic Biomass The BioCompactor Technology The BioCompactor Company, LLC BioBriquet ® Herbaceous Feedstock.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Water Distribution Systems – Part 1
Co-firing Coal and Oat Hulls at the University of Minnesota VIII International Oat Conference June 28 – July 2, 2008 Minneapolis, MN Your logo here.
BIOMASS AS A FUEL AND BLENDING STOCK Shawn T. Grushecky Assistant Director WVU Appalachian Hardwood Center
COST APPROACHES TO PRICING
1 UNDP/GEF Government of Belarus Biomass Energy Project Vladimir Voitekhovich (PMU) John Vos (BTG)
Montpelier District Energy Gwendolyn Hallsmith, Director Planning and Community Development City of Montpelier, Vermont.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Wood Biomass Basics Woody biomass: Thermal and combined heat and power (CHP) technology, applications & opportunities. Rick DeMark, Coordinator North Country.
Biomass Development A State Perspective Arthur Butch Blazer New Mexico State Forester.
Workshop: Opportunities for Wood Heat from Forest Residues in Alaskan Communities Alaska Wood Energy Conference November 16 Fairbanks, Alaska Tom Miles.
A hypothetical estimation of emission reductions in a biomass power plant project Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Kyrgyzstan: Climate Change Mitigation Actions Zuhra Abaihanova TNC Coordinator, Climate Change Centre Director, CC Coordination Commission Executive Secretary.
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
Presented By : Joan Chamberlain Executive Director.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
Producing energy does not have to threaten the environment. In fact, its very production can reap major environmental benefits. The United States biomass.
Covenant of Mayors Seminar 28 November, 2009 Urban Sustainable Energy Inġ. Jonathan Scerri Econing Engineering Consultancy Ltd.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions reduction George Mavrotas.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
What’s The Big Idea? The Energy Economy. It’s the Energy Economy Growth in a Time of Recession Opportunities in the Green Economy Southampton’s Track.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
First Solar FuelSmart™: Powering Energy Security
Lessons from community energy projects in Wales A brief overview Matthew Leese 1.
Example of a Decision Tree Problem: The Payoff Table
Aspen Power, LLC Danny Vines, President October 7, 2010.
Biomass for heat and power production - opportunities for land owners and buildings managers Ian Tubby Biomass Energy Centre RRSP, October 2009.
Rural Broadband, LLC Henry County Fiber Network Initiative Rural Broadband, LLC 15 Lake Street, Suite 270 Savannah, GA Contact: Allen Davis
John Ackerly President, Tatiana Butler, Program Director The Scale and Potential of Wood Heat: Why Everyman’s Renewable Will Outpace Solar.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Efficient and Sustainable Use of Biomass for Energy
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Cogeneration Facility The University of North Carolina at Chapel Hill Cogeneration Systems Energy Services Department Phil Barner- Cogeneration Systems.
FORESTS – IMPORTANT ENERGY SOURCE. Forests in the EU Apart from their importance for ecology and environment conservation forests are one of the Europe's.
VT Department of Forests, Parks & Recreation Wood Energy in Vermont January 2005 VT Department of Forests, Parks & Recreation.
Pennsylvania's Bureau of Forestry and US Forest Service Collaborate to Implement Wood-Energy Projects FRP Committee June 7, 2012 State College, PA Michael.
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Biomass Energy and its future in Wisconsin David Donovan Manager, Regulatory Policy David Donovan Manager, Regulatory Policy.
Air Emission Benefits of CHP Air Innovations Conference August 10, 2004 Joel Bluestein Energy and Environmental Analysis, Inc. Prepared under contract.
USDA FOREST SERVICEState and Private Forestry Woody Biomass: Making Wood WERC for Us Steven J. Milauskas Stephen M. Bratkovich.
Harvest residue utilization in small- and large-scale bioenergy Systems: 1 Julian Cleary, Post-Doctoral Fellow Faculty of Forestry University of Toronto.
Bio-energy Initiatives and Collaboration in New Brunswick Climate Change Hub Advisory Committee Meeting February 5, 2009 By: Bryan Pelkey Department of.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Fuels For Schools. II. Our Partnership I. Heating Schools With Wood 2 Main Topics:
National Capital Region Climate Change Report Presentation for the Bowie City Council Stuart A. Freudberg Director, Environmental Programs Metropolitan.
March 30, 2010 Michael Kelleher SUNY College of Environmental Science and Forestry Energy Use, Renewable Energy and SUNY ESF Climate Action Plan.
2012 Economic Development Administration Regional Meeting Presentation Best Practices in Sustainable Economic Development.
Biomass Thresholds for Electricity, CHP and Heat Generation Nigel Mortimer, Charlotte Hatto, Garry Jenkins and Onesmus Mwabonje North Energy Associates.
Potential for Biomass Energy Development in South Carolina Tim Adams Resource Development Director South Carolina Forestry Commission.
Cogeneration Facility
Economics of Biomass Harvest Dean Current and Dalia Abbas Woody Biomass Harvesting Workshop and Equipment Demonstration Grand Marais, MN – August 7, 2006.
Sustainable Aviation Biofuels Workshop Georgia Tech: H. Milton Stewart School of Industrial Systems & Engineering, December 3, 2015.
An Overview of Considerations of District Energy in Montpelier.
IEA Bioenergy Task 38 Case Study on the Greenhouse Gas Budgets of Peat Use for Energy in Ireland Kenneth Byrne and Sari Lappi Forest Ecosystem Research.
Presentation transcript:

Forest Biomass Heating and Electricity in Ely, MN Community Meeting February 9, 2012 Dovetail Partners University of Minnesota USDA Forest Service

Lew McCreery, NE Area State & Private Forestry Dan &Tom Wilson, Wilson Engineering Services Ely AETF Steering Committee Roger Skraba, Mayor Harold Langowski, City Engineer Dave Olsen, Retired Engineer Rebecca Spengler, Business Owner Study Teams and Steering Committee Dovetail Partners, Inc. Gloria Erickson, Local Coordinator Cheryl Miller, Project Manager Kathryn Fernholz, Executive Director Dr. Steve Bratkovich Dr. Jim Bowyer University of Minnesota Dr. Dennis Becker, Forest Resources Dr. Steven Taff, Applied Economics David Wilson Ann ONeill

Community-Driven Sustainable Bioenergy Funded by the Environment and Natural Resources Trust Fund as recommended by the Legislative-Citizen Commission on Environmental Resources (LCCMR) Provide objective information on the conversion of forest biomass to energy in Ely and Cook County. Provide model for local and state decision-makers for use in considering biomass energy options.

Project Overview Objective: Assess feasibility and impacts of community biomass energy systems in Ely and Cook County, MN Tasks: Technical / engineering assessment of biomass district heating and electricity Economic analysis of options over the life of equipment Assessment of current and projected biomass supply Environmental / lifecycle impacts of biomass energy Social assessment of supply chain issues (via community dialogue): forestry, transportation, processing, energy production, and distribution

Timeline Fall 2011 Confirm Ely participation in study Hire staff, recruit participants Develop work plan Winter / Spring 2012 o Identify and assess energy system options (in progress) o Assess and project local biomass supply (in progress) o Identify community concerns (in progress) Summer 2012o Environmental / lifecycle impact assessment o Public outreach on supply chain issues Fall 2012o Public outreach on supply chain and financing issues o Community meetings on findings and recommendations Winter 2012o Deliver final report

Step 1: Estimate forest biomass feedstock availability and cost by species and location Step 2: Assess technology options for different sized heating and/or electricity systems Step 3: Evaluate the financial performance of biomass energy systems vs. existing fossil fuel systems Study Approach

Step 1: Estimate forest biomass feedstock availability and costs 2011 harvest rate (cords) 1 Biomass Availability (dry tons) Harvest residuals (50% tops & limbs) 2 +10% of roundwood +20% of roundwood Firewise removals 3 Ownership Superior National Forest161,47421,299 39,86158,423 3,189 Minnesota DNR29,0783,745 7,07010,395 na St Louis County87,64912,020 22,08632, Private 5 152,90422,682 40,35958,036 na Total431,10559, ,376159,006 4,089 1 One cord is equivalent to 1.2 dry tons. Source: personal communication with each agency; USDA FIA 2 Residual biomass includes tops, limbs, branches and needles as defined by the USDA Forest Service FIA biomass attributes. Assumes 50% retention on-site. 3 Fuels reduction removals from the Superior National Forest based upon an estimated 12,599 cu. yards of slash generated in St Louis County estimates based upon amount of slash processed into mulch at seven local transfer sites. 4 Includes non-industrial private woodlands, corporate, non-governmental conservation/natural resources organizations, unincorporated local partnerships/associations/clubs, and tribal timberlands. Forest Biomass Availability Annual Biomass Availability (within 60-miles of Ely; all species)

Biomass Supply Area by Distance Traveled

Step 1: Estimate forest biomass feedstock availability and costs Forest Biomass Availability Clean chips=bolewood portion of tree only Hog (hogged) fuel=limbs, tree tops, small diameter wood 1 truckload of wood=23-26 green tons 1 green ton of wood=0.70 dry tons (30% moisture content) 1 cord of roundwood=1.2 dry tons (128 cu ft) 1 dry ton of wood=7,600-9,600 Btu/lb (18-22 GJ/t) Delivered Cost Harvest Costs In-woods Processing Transport Costs ++= Stumpage Cost +

Step 2: Analyze technology options Bioenergy Technology Options H HS VCC CG WC FS Ely, Minnesota IP

Ely District Energy Engineering Study (Nov 22, 2010) Step 2: Analyze technology options Bioenergy Technology Options

Configuration Annual heat loadFuel type Annual Biomass demand (dry tons/yr) 1 Annual Truckloads (25 tons; 40% MC) Ely Homes & Businesses 2 Combined-Heat-Power (CHP)197,000 mmBtuHog fuel13, District Heating (DH)125,000 mmBtuHog fuel8, West End Cluster (high school, hospital) in-progress East End Cluster (VCC, Forest Service, others) in-progress Step 2: Analyze technology options Bioenergy Technology Options 1 59,746 dry tons of residual biomass generated in 2011 from within 60-miles of Ely 2 LHB, 2011

New systemcosts: -Boiler/ building/ turbine -Backup equipment -Annual fuel price -Annual operations -Piping -Hookups New systemrevenues: -Annual heat sales -Electricity sales (if any) -City taxes -Financing / debt service Step 3: Financial performance of biomass vs. existing systems Evaluate Financial Performance Current system costs: -Annual fuel price (rising?) -Annual operations expenses -Equipment replacement -Cost? -When? -How financed? -Annual average cost of heat comparison with new system

Step 3: Financial performance of biomass vs. existing systems Evaluate Financial Performance Grand Marais, MN Heat for public buildings north of 5 th St N Thermal demand 12,100 mmBtu/yr 20-yr effective fossil fuel price 2 $32.60/mmBtu Fuel typeClean ChipsPellets Capital construction costs Site prep & building$208,000$180,000 Boiler and fuel receiving$520,000$460,000 Back-up boilers$200,000$150,000 Piping & pumping$775,000 Other misc 1 $434,000$399,000 TOTAL$2,137,000$1,964,000 Annual operating costs (20 yrs) Delivered wood costs $89,000 $185,000 O&M, utilities & electric$7,000$3,500 TOTAL $96,000$188,500 Financial Return Cost of heat ($/mmBtu)$24.20$31.00 Simple payback period7 yrs10 yrs Return on investment186%111% Outstanding capital needed $0

Other considerations Analysis of environmental impacts from transportation, harvesting, carbon emissions, and ash disposal Sustainability guidelines for biomass harvesting Community and stakeholder outreach and education to select preferred options Decision tools for other communities

For further information, please contact: Gloria Erickson, Local Project Coordinator (218) Cheryl Miller, Project Manager (651) Questions?