Maritsa East 3 Success Story Bulgaria Business Up, May 11 th, 2012 Sheraton Hotel Sofia, Bulgaria.

Slides:



Advertisements
Similar presentations
Sustainable Energy.
Advertisements

Environmental Management & Sustainability ALEX HETHERINGTON - Benefits Beyond Compliance Libstar Manufacturing Forum May Irene Country Club.
COPENHAGEN – KEY TO CLIMATE INVESTING
1 Intelligent Energy Europe 2009 European Commission, EACI Market Replication Eco-Innovation and Intelligent Energy Astrid Geiger, Head of Sector Energy.
1 Background EEA A European Union institution Established by EU Regulation Staff: about 80 Budget: 22 Meuro Copenhagen EEA home page:
1 Regional Policy investing in ecosystems & green infrastructure for regional development Mathieu Fichter Policy Analyst Environment European Commission.
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
Energy policy and its implementation in Estonia Renewable energy Madis Laaniste, Energy Department.
1 Environmentally friendly technology for municipal solid waste gasification From Science to Business October 2006 Kyiv Georgiy Geletukha t./fax:
Environmental Leadership The Pursuit of Cleaner Air
Duke Power Clean Smokestacks & Mercury Efforts April, 2004.
Introduction to Sustainable Solutions
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Building a Better Future Stretch Building Code October 15, 2009.
Second Amendment to Cooling Water and Landfill Gas Sale and Purchase Agreements December 16, 2008.
Innovative Applications of Technology in Engineering - Part 1
Rochester Riverside – Sustainable brownfield development Fifth European Conference on Sustainable Cities & Towns 21 March 2007 Sarah Beck Project Manager.
March, 2010 OVERVIEW April, Scrap / Recycling Steel Mills Downstream Gerdau Ameristeel | Efficient vertical integration.
Financing Renewable Energy: an introduction to FITs and RHI Andrej Miller Renewable Financial Incentives Office of Renewable Energy Deployment
Financing your Renewable Energy Technology Jos Mister Energy Saving Trust.
University of Flensburg/Germany International Institute of Management Energy and Environmental Management in Developing Countries (former SESAM) MEng (Industrial.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Crystal's Journey to Sustainability
1 Overview and Outlook for PPP Projects in Vilnius Mrs. Ruta Vainiene Adviser to the Mayor of the City of Vilnius November 22 nd, 2006 Vilnius.
The costs of reducing PM 10 emissions and concentrations in the UK A project carried out by AEA Technology for the UK Department of the Environment, Transport.
Federal Energy and Environmental Regulation Agencies and Laws
Formation of Coal The coal that we use today comes from the remains of plants in swamps millions of years ago After much time and pressure, plant remains.
A Commitment to Community. Mission Statement Provides comprehensive, long-term solid-waste solutions in a safe, responsible, economically sound manner.
10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
Environmental Science
1 RICE HUSK UTILIZATION IN THE MEKONG, RIVER DELTA, VIETNAM PHAM THI MAI THAO Angiang University The 2 nd International Conference on Sustainability Science.
Sustainability - Long Term Value Creation May 2012.
Solid Domestic Waste IB Syllabus 5.5.1, AP Syllabus Ch 21 Personal Waste Audit Trashed video.
A Sustainable Environmental Programme Enel Maritza East 3 Mike Foster CEO Enel Operations Bulgaria.
CAIR & MATS 2012 Southern Sectional AWMA Annual Meeting & Technical Conference September 12, 2012 Chris Goodman, P.E. Environmental Strategy.
Energy efficient technology and equipment implementation in plumbing and heating installations УКРІНТЕРМ 2011.
Green Manufacturing: Adopting Energy Efficiency in Manufacturing Supply Chains -Dangote Cement Strategy By Pabby Paramjit Director, Dangote Academy.
10 th June 2008 Petcoke at Drax Power Station By Ian Wright Houston.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Maximizing production efficiency for existing and new power infrastructure: Enel experience in Russia and technologies Enrico Viale Chief Executive Officer,
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
The international pipeline contractor for landmark project JCV/vs rev 0 1 IPLOCA 2008 Environment Award.
China’s Sustainable Energy Policy
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
EVN - Energy and Environment Services
4,016 2,551 Kevin Walker Chief Operating Officer Iberdrola USA.
National Seminar Role of DER in the EU and Current Status in the Baltic States 6 March 2007 Current Status of Energy Policy on Development of Distributed.
Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Solar Energy and Nuclear Power
Applying scientific thinking in the service of society Water and Sanitation Low carbon cities meeting 04 – 06 October 2010.
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
Introduction of international standards in energy sector CF “Centre of sustainable production and consumption” Almaty, July 4-6 Safargaleyeva Guzaliya.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
The Netherlands - Bulgaria Economic Relations and Co-operation.
Basic law of energy policy in Japan toward to the development of CES Takao KASHIWAGI Professor, Ph. D, Graduate school of Bio-Applications and Systems.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
What is Green Globe? It is an international environmental certification program adapted for the tourism industry It sets precise environmental performance.
TPP Stanari “First ‘new generation’ TPP in SEE”. Location: about 70 km east of Banja Luka and 25 km west of Doboj.
DSF Refractories & Minerals Ltd. The UK’s Leading Refractory producer Neale Parkin Managing Director DSF Refractories & Minerals Limited The UK’s Leading.
Challenges for Wind Farm Development in Bulgaria: The Environmental Aspect Case study: Saint Nikola Wind Farm, Kavarna April 2009.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
Introduction And Thermal Power Plant
Template for country interventions (5 min)
Pollution control methods of thermal power plants
Wind Industry Market and Policy Overview
from a Success Story to a Progress Story
Presentation transcript:

Maritsa East 3 Success Story Bulgaria Business Up, May 11 th, 2012 Sheraton Hotel Sofia, Bulgaria

Corporate Profile of ContourGlobal 2

ContourGlobal at a Glance We develop, acquire and operate large, long-term contracted power generating stations for national grids and utilities primarily in developing markets We develop and operate innovative energy solutions for multinational companies in developing markets (ContourGlobal Solutions) Increasingly, we also pursue opportunistic acquisitions and development where we leverage our regional operating presence Key facts and figures: Company headquartered in New York City Significant U.S. investor base (educational endowments, pension funds and individual investors) 2012 Revenue budget of $1.0 billion 1,500 employees globally at year-end

Global Footprint : The Americas, Caribbean, Europe and Africa Americas US (1) Brazil (3) Colombia (2) Caribbean St. Martin – France (1) Guadeloupe – France (1) Europe France UK (1) Italy (1 + Solar) Poland (1) Ukraine (2) Bulgaria (1) Romania (1) Spain (1) Africa Togo (1) Nigeria (3) Rwanda (1) Offices *Numbers in parenthesis represent our plants in operation or under construction 4

Company History and Milestones Brazil SD II Commercial Operations Acquisition of additional interest in Sochagota Completion of second boiler overhaul in KTE Rwanda PPA and concession Ploiesti Quad-Gen Commercial Operations ContourGlobal founded by Joseph Brandt and Reservoir Capital Powerminn Commercial Operations Agreement with Coca-Cola Hellenic Begin construction of SD II run-of- river hydro Acquisition of Powerminn Acquisition of Sochagota, Colombia Begin development of Togo Project Acquire Kramatorsk Heat and Power CHP Acquisition of Termoemcali, Colombia Acquisition of plants in St. Martin & Guadeloupe Togo Commercial Operations Nogara and Knockmore Hill enter Quad-Gen Commercial Operations Begin construction of Galheiros run-of-river hydro, Brazil Begin construction of Nigeria, Radzymin and Kiev CHPs Completion of construction on 5 solar plants in Italy Acquisition of Gladiator, CGs first ground mounted solar project in Italy Award of PPA for Asa Branca Wind, Brazil Completion of first boiler overhaul in KTE Acquisition of Maritsa East 3 TPP, Bulgaria Acquisition of Arrubal CCGT, Spain 5

Environmental Commitment Environmental sustainability of our projects. We are committed to the UN Global Compact and the 10 Principles. We strive to avoid adverse impacts on the environment, or reducing, mitigating, or compensating for the impacts. Social Responsibility We are active members of the local community through education, training, and economic empowerment. Responsibility to Our Employees The bedrock of our Company. Everybody Goes Home Safe, Everyday, Everywhere, Our safety commitment goes directly to our partners, contractors and everyone who visits our sites. Safety Culture 6 Our Commitments 6

7 ContourGlobal Maritsa East 3 TPP today Rehabilitated in 2009 Installed Capacity 908 MW 4 Units: 227 MW each Lignite fired boilers Efficiency over 35% Availability over 85% Fuel: Lignite Main supplier: Maritsa East Mines EAD First unit commissioned in 1978

8 Extension of the operational life of the plant by minimum 15 years Increase of the capacity of each of the units – from 210 MW to 227 MW Increase of the efficiency and availability of the plant from 30% to over 35% Improve the plants reliability Full compliance with the requirements of the European Environment Legislation now and for the foreseeable future Improve the Health and Safety Environment for Workers and Contractors The Goals of the Rehabilitation

9 Before CO 2 (g/kWh) SOx (g/kWh) NOx (g/kWh) Particulate (g/kWh) Drastic Emissions Reduction After The first lignite power plant at the Balkans in full compliance with the European Environmental Standards Major changes for environmental compliance Gross Power840MW908 MW Net Efficiency30%35% Success Indicator: Before and After

10 The Results of the Rehabilitation – Success for the Company, Success for Bulgaria Health and Safety Improvement 1,266,798 man hours worked since the last Lost Time Accident Full environmental compliance with the requirements of European legislation: reducing the SO2 emissions by more than 94%; Reducing of the dust emissions by 99,96% Reduced using of fresh water by 50% Automation of the plant with installation of new DCS system Intense Training process for the personnel Introducing of a Continuous Improvement Project and mindset

11 Success Indicator: Health & Safety Everyone goes safe, every day, everywhere Zero accidents goal has been set for the organization The H&S continuous improvement has brought a progressive reduction of the accidents Safety management system has been certified according OSHAS ISO (since 2010) Improved workplaces Improvement of Fire Fighting 11

12 The environmental management system has been ISO certified in 2009 Electrostatic precipitators purify the flue gasses from dust ensuring efficiency of over 99,96% Flue Gas Desulphurization Units: 2 FGDs connected with 4 units (as per design) The wet process of the FGD provides a further decrease of the dust content in the gases ensuring a level of dust far below the law limit of 50 mg/Nm3 Success Indicator: Environment Compliance

13 FGDs produce gypsum. Generally it is a by- product for the plant: Option 1: Dispose of in land fill site? Why? Option 2: dewater it and sell it as resource for gypsum wallboard factory Result – introducing a new investor in Bulgaria (Knauf), thus turning the country from a gypsum importer into producer and exporter. Success Indicator: Why Waste?

14 Improvement of Ash Handling The ashes from the ESPs and the bottom of the boilers are collected by a wet handling system Two fully refurbished Dredger pump stations forward the collected ashes mixed with water through new ash pipelines to the ash lagoons Sprinkling System In the past, dust was blown out from the lagoons in windy days mainly during the spring-summer period As a part of the rehabilitation our sprinkling system has been constructed, trees have been planted around the lagoons and streets have been paved in order to prevent the dust spreading Success Indicator: Less Ashes

15 Effluent Treatment Plant purifies all the process water before discharging it in the nearby river. It processes effluent waters up to 1000 m3/h with final sand filtration to meet the highest standards Sewage Plant treats the sewage water. No direct discharge in the local river anymore. Oil water separators help preventing water pollution from any contamination of oil Precipitation basins remove suspended coal dust from stockyard drainage First flushing basin removes oil from rain water before discharge Before the implementation of the environment program all water used was discharged without any treatment Success Indicator: Water Treatment 1/2

16 Two new make-up water lines from water- supplye lake (8 km each) - 50% less leaks Water Management System recycles the water, which was previously in open circuits minimizing the consumption and discharge Buffer Pond with capacity of m3 has been constructed in the ash handling water management system to equalize the peaks and reduce the consumption of water Major changes for environmental compliance Success Indicator: Water Treatment2/2

17 Thank you for your attention!