Who We Are Alaska Native Tribal Health Consortium Division of Environmental Health & Engineering June 2011.

Slides:



Advertisements
Similar presentations
Alternative Sources of Energy Distributed Generation economics, variability factors, capacity contributions, and environmental considerations related to.
Advertisements

New ecology, inc. July 19, 2007 New Ecology, Inc. Green Homes and Sustainable Communities 2007 Achieving Sustainable Rehabilitation Lauren Baumann Senior.
Power Smart for Business Community Workshops on Climate Change Pinawa – February 1, 2005.
The Newton Eco-Project The Challenge The Project The Goals Why Are We Here? Partner Presentation December, 2011.
Water Distribution Systems – Part 1
Federal Reserve Bank of Boston Case Study
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
ANTHC DIVISION OF ENVIRONMENTAL HEALTH & ENGINEERING Wagner ANTHC Rural Energy – Washeterias Briefing for the Arctic Research Commission January 2014 Daniel.
Buckeye Wood Energy Converting Waste Wood Into Energy.
An Approach to Heat Recovery in Rural Alaska Introduction Introduction Background – Maintenance & Repair Background – Maintenance & Repair Small Scale:
HumidiClean. New After 400 Hours After 800 Hours Ionic Bed.
Overview of Funding and Needs for Rural Alaska Water and Sewer Improvements Bill Griffith Alaska Department of Environmental Conservation.
First Solar FuelSmart™: Powering Energy Security
Air-Driven Odor Neutralization Technology Putting dollars on your customers bottom line and giving them eco-bragging rights.
Waste Heat to Power Recovery from Diesel Generator.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Program Overview Alan Shedd, Touchstone Energy 9/28/10.
A Potentially Valuable Component of Texas Bioenergy Projects
Summer 2014 Internship Projects John Venables Alaska Center for Energy and Power 1.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
Heat Recovery for Commercial Buildings
Geothermal Heat Pumps in residential and commercial HVAC systems Dan Winters 4/18/11.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
POWERING REMOTE NORTHERN VILLAGES WITH THE MIDNIGHT SUN Lance Whitwell, Tribal Energy Manager Marjorie John, Assistant Energy Manager Joshua Roberts, Energy.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Energy Consumption and Carbon Footprint of Secondary Aluminum Cast House WENJING WEI TTMVM Supervised by Docent Weihong.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
University of Alaska Fairbanks An Energy Solution for 2017 and beyond.
Competition based heat markets help delivering EU climate targets Building heat markets, Brussels, February 27 th 2015 Markus Rauramo, Executive Vice President.
Don ’ t blow off steam- microturbines make cheap, clean energy from waste heat Presented By: Ahmad Sabri El-Sayed Nagy By: Lindsay Audin Web Address:
Kongiganak Wind Farm Picture by Puvurnaq Power Company Josh Craft Assistant Wind Program Manager Alaska Energy Authority (907)
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Genesis Solar Module Brochure ™
Introducing the Oman Green Building Centre 19 January 2013 City Season Hotel, Muscat Eng. Issam Mansour Chairman.
DOE OFFICE OF INDIAN ENERGY Tribal Solar Working Group Meeting Sarai Geary Program Manager, Office of Indian Energy.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Electric Vehicle Teacher : RU-LI,LIN Student : 4A YING-TI,LAI 4A CHIH-TING,WANG.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
RURAL DEVELOPMENT WATER & WASTE PROGRAMS WATER AND WASTE FACILITIES WATER SYSTEMS OR COMPONENTS OF WATER SYSTEMS SEWER SYSTEMS OR COMPONENTS OF SEWER.
Bill Harrison New Jersey Chapter February 3, 2009.
Sustainable Water Infrastructure and Opportunities in Rural Idaho April 2011 Cyndi Grafe.
Development of a Tribal Utility Why is the Development of a Tribally Owned Utility a Why is the Development of a Tribally Owned Utility a “Good Thing”
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Pecan Street Project Inc.. Two energy economies ElectricityTransportation Percentage from petroleum: 0.6 percent Percentage not from petroleum: 0.3 percent.
Livable Delaware Energy Task Force - the Key to Energy and Environmental Co-Benefits.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Carnegie Mellon University Evaluating Rooftop Solar Parity for Commercial Customers Shelly Hagerman, Paulina Jaramillo, M. Granger Morgan Carnegie Mellon.
Geothermal Energy ECON 343 A NDREA V ESTMANN, T IMON R UTH, A ND E DDIE A DAMS.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
T172 Tutorial 2. Maths Day school for Technology Students Saturday 27 March Regional Centre, Manchester (Details to be sent in post) The day school clashes.
Manitoba Association of Regional Recyclers “Presentation on Methane Gas Recovery” Tom Keep Community Development Coordinator – Environment November 7,
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
Solar Energy Ashley Valera & Edrick Moreno Period 6.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Unfulfilled Needs: Energy - Resource Constraints  High Cost of Irrigation … lack of productivity and reduced profitability  Lack of power for local value-addition.
Greenhouse Gas Initiatives: progress and perspective Sandra Meier Environmental Energy Alliance of New York.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
Cogeneration at UC March 09, Welcome Central Utility Plant.
Meera Kohler President and CEO Alaska Village Electric Cooperative.
Dan Reitz, P.E. Rural Energy Program Manager
Annual Water and Sanitation Renovations for the Arctic
Eric Hanssen, P.E., LEED AP, CEM ANTHC Rural Energy Initiative
District heating in Finland 2017
Impact and Opportunity:
Presentation transcript:

GENERATOR HEAT RECOVERY CONSIDERATIONS IN ARCTIC VILLAGE APPLICATIONS LCDR William Fraser, P.E.

Who We Are Alaska Native Tribal Health Consortium Division of Environmental Health & Engineering June 2011

ANTHC Non-profit, statewide organization Provides a range of medical and community health services for more than 125,000 Alaska Natives. Part of the Alaska Tribal Health System, which is owned and managed by the 229 federally recognized tribes in Alaska and by their respective regional health organizations.

ANTHC History 1970s-1990s: Regional health organizations in Alaska Passage of P.L. 105-83 established ANTHC, the only THO established by statute December 1997: ANTHC incorporated as non-profit 501(c)(3) June 1998: Initial contract with IHS.

ANTHC History October 1998: Contract expanded to include Environmental Health & Engineering October 1998: ANTHC becomes a P.L. 93-638 Title III Self-Governance entity, signing the Alaska Tribal Health Compact

DEHE Designs and Constructs Health and Sanitation Facilities Provides operations support Monitors & develops standards for mitigating climate change impacts Health impact studies Environmental Grants & training

Water & Sewer- Why?

What does this have to do with Heat Recovery? Hospitalizations are 5 times higher in communities w/o piped water & sewer. Typical Fuel consumption for an Arctic WTP w/ piped water & sewer: 8000-25,000 Gal / Year Fuel Oil Fuel Prices between $6.00 & $8.00 / Gal. and rising. Heat recovery can help make it affordable.

Extreme Climate

High Energy Use

HEAT RECOVERY FROM POWER PLANTS 2 basic types: Jacket recovery Stack recovery Small Scale: 50 KW to 3500 KW Ideal for space heat and process heat Considered a fuel saver, not a primary source of heat.

Kwigillingok Generator Facility

ADVANTAGES OF HEAT RECOVERY Very green- reduces carbon footprint. Can dramatically increase the economic viability of a community water system. Adds additional redundancy to the building heating system.

DISADVANTAGES OF HEAT RECOVERY Requires an agreement with the power utility, often with a charge for waste heat. Usually increases the complexity of the heating system, especially in Washeterias. Requires additional maintenance and coordination between power utility and building owner.

Other Solutions

SO YOU WANT TO BE GREEN What do you need to know before you start? Estimating available waste heat Deciding on a heat recovery strategy Selecting system components

WHAT DO YOU NEED TO KNOW BEFORE YOU START? Who owns the generators and what are their conditions? Do you have a viable path between the waste heat source and the building? What type of building are you serving? Are there other buildings served by the waste heat? What type of monitoring do you want? Who is going to maintain it?

ESTIMATING AVAILABLE WASTE HEAT QA = QGEN – QPIPE - QO QA: Minimum available waste heat for your building QGEN: Average generator output during peak heating season (typically much less than rated capacity) in BTUs / Hour QPIPE: Heat loss from distribution piping during peak heating season. Typically about 50-60 BTUH / LF QO: Heat used by other buildings on the waste heat system (sometimes this is prioritized by order of connection, so be careful)

HEAT RECOVERY RULES OF THUMB: Generator Output: 1/3 Electricity, 1/3 Jacket heat, 1/3 Stack loss 1300-2000 BTU / KW-Hr (Available Jacket Heat) 100,000 BTU delivered heat = 1 gallon of diesel Annual Fuel Saved = .3 x Power plant annual fuel used x 0.6 Pumping Energy Costs <= 10% Fuel Value

BREAK EVEN TEMPERATURE DIFFERENCE PPUMP x CE x 100 PPUMP x CE x 100 TBR = + COIL x UAHX 900 x GPM x COIL TBR: Break even temperature difference between Generator Heating Supply and Building Heating Return (Deg F) PPUMP: Pump power (W) CE: Electrical cost ($ / kWh) COIL: Fuel cost ($ / Gallon) (80% efficiency assumed) UAHX: Heat exchanger U factor multiplied by HX area (BTU/ Hr x Deg F) GPM: Heat exchanger glycol flow rate (GPM) (This formula only applies in special case of counterflow HX with matching flow rates and sufficient heating demand to use all of the waste heat) An example: AVEC charges 30% of offset fuel cost, electricity is $0.20 / KWH (PCE price), Fuel is $7.00 / Gal, Pump power is 850W TBR =

ESTIMATING WASTE HEAT DEMAND QD = QBLG + QPROC QD: Waste heat demand (typically does not include dryers) QBLG: Building envelope heat losses (must engineer heating system for lower temperatures than typical heating systems) QPROC: Heat required by process systems (includes circulation loops, raw water heat add, storage tanks, etc. This is where waste heat really shines)

SELECTING A HEAT RECOVERY STRATEGY Direct heat add to potable water: Double wall shell and tube, independent of boiler system (Kiana) Small system with single boiler: Pipe heat exchanger in series with boiler (Chenega Bay) Large system with multiple boilers: Pipe heat exchanger in primary / secondary arrangement (Kwigillingok)

GENERATOR HEAT RECOVERY ARRANGEMENT

RECOVERED HEAT INTO POTABLE WATER

HEAT EXCHANGER IN SERIES WITH BOILER

PRIMARY / SECONDARY HEAT EXCHANGER DIAGRAM

Minto Heat Recovery

WASTE HEAT CONTROLLER Turns on at 8 Deg F difference Turns off at 4 Deg F difference Built in HOA switch. Provides 1p/2t switch which can handle a 1 HP pump.

BTU METER

Plate / Frame Heat Exchanger

Brazed Plate Heat Exchangers

Shell & Tube Heat Exchangers

Typical pumps

AMOT Valve

DESIGN COMMENTS Use Brazed Plate or Plate / Frame heat exchangers Provide controls to ensure heat is not transferred back to generator cooling system. Provide controls to minimize electric power consumption Provide BTU monitoring if being billed by local utility Provide pressure relief on pipeline Provide strainers on both sides of heat exchanger (reduces cleaning of heat exchanger). Provide air separator on pipeline side of system. Provide glycol system monitoring and makeup. Provide expansion compensation Don’t use HDPE pipe. Copper, Steel, PEX, Stainless steel. Monitor pipeline for leaks and pressure.

Questions?