Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.

Slides:



Advertisements
Similar presentations
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
PN UNC Workgroup iGT Services 7 th February 2012.
Distribution Network Interruption - Initialisation 28 September 2010.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Références, date, lieu Xoserve Service Model – Shipper’s View Total Gas and Power Ltd Gaz de France ESS.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
IGT and Shipper Workgroup meeting 28 th February 2011.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Distribution Workgroup 24/11/16
Revised registration for unregistered sites
Must Read Process Guide For Shippers
Confirmation Notice Period for Certain ‘Unique’ Sites
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
Project Nexus Workgroup
Connected System Exit Points Administration Options
Project Nexus Workgroup
CSEPs Reconciliation Proposals
Chris Warner Network Code Manager
Chris Warner UNC Modification Panel 21 December 2017
Connected System Exit Points Administration Options
MOD 258A Demand Estimation Sample Point – Shipper Report.
COR1072 Enduring Transfer and Trade Arrangements
Topic raised at July 2009 Distribution Workstream
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
DSC Change Committee Summary – 13th March ‘19
Mod Proposal 0268 : AQ Backstop Date
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
XRN4249 – Part B Data Migration Plan
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Proposer: Debbie Brace Panel Date: 20th March 2014
Deferral of Retrospective Updates Functionality
Project Nexus Workgroup
DN Interruption Phase II
Proposed June 2020 UK Link Major Release Scope / Governance Timeline
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
Implementation Approach Distribution Workgroup – June 2014
Unregistered and Shipperless Process
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
DSC Change Committee Update
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
DSC Change Committee Update
DSC Change Committee Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
Presentation transcript:

Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee

Transporter Initiated Confirmations As a result of the implementation of Modifications enabling Transporters to register sites on behalf of Users, Xoserve are assessing solution options to confirm sites into Shipper Portfolios. Xoserve are conducting analysis on these modifications – but propose discussion points are considered by UK Link Committee Modification 0345 - Removal of Daily Metered voluntary regime (implementation date 01/10/2013) (NB: Mod442) Modification 0424 Re-establishment of Supply Meter Points – prospective measures to address Shipperless sites (implementation date 01/04/2013 Other Modifications (not approved) may utilise this functionality: Modification 425 Modification 410A

Transporter Initiated Confirmations The Transporter Agency may register supply points on behalf of a User after a period of notification where the User has not initiated a supply point confirmation in line with the requirements of the Modification. This may be the registration of the site using historical data or new data items dependant on the requirements. It is anticipated that existing SPA file formats will be used. Nomination and Confirmation processes

Transporter Initiated Confirmations Xoserve are still assessing the solution options and wish to consult with UK Link Committee regarding Impact to User systems. Impacts to Users include the receipt of unsolicited files (e.g. SPA files of NMR/NRF,CFR and TRF; Other files – e.g. MRI) Duplicate file sequence numbers being utilised – multiple options exist Re population of historic supply point data may no longer be applicable to sites and this may lead to issues with loads and associated obligations.

Other Challenges – UNC Modification 424 Other data items may need to be updated as part of the activity Modification 424 requires asset data be attached Subsequent Modifications may require additional data items be updated Charges will be recovered from Shippers as a result of 424 Abortive Site Visit costs for Transporter visit Retrospective Transportation Charges.