Biomass Boiler Project Oxford Hills Comprehensive High School.

Slides:



Advertisements
Similar presentations
Associated Underwriters, Inc. © 2011 by Associated Underwriters, Inc. Ed LEX-EGPP-VIC Physical Damage Coverage Plan Including GAP and GAP Pay.
Advertisements

Renewable Energy and Energy Efficiency Program: Farm Bill Section 9006 Section 9006 Program : Rural Energy Efficiency Renewable Energy Projects May 9,
Karlovac County Situated in the central part of Croatian state territory Covers an area of approximately km 2 Population people, density.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
Dr. Nike Krajnc Slovenian forestry institute
Dr. Nike Krajnc Slovenian forestry institute
Regional Policy Common Indicators: Energy & Climate Change Definitions and Discussion Brussels, 22 nd November
Capital Reserves and EDA Grants Department of Education Division of Finance November 28, 2001.
FY2012 Caseload Projection and Options Policy and Fiscal Committee June 6, 2011.
Accounting for Bad Debts Allowance Method Accounts Receivable Approach Allowance Method Accounts Receivable Approach.
Woodward Academy and the Georgia GOAL Scholarship Program
Grants & Incentives Alternative Fuel grants and incentives are available Alternative Fuel grants and incentives are available ACFC applies for grants from.
BLACK MOUNTAIN TOWN SQUARE Building a Grander Front Porch.
Facilities Improvement Plan Roadmap to Improving the Learning Environment CROOKSTON PUBLIC SCHOOLS Public Meeting 7:00 pm October 21, 2013.
Climate Change Finance Facility (CCFF) Call for proposals: "Use of Renewable Energy Resources in the Household Sector (1st round) ( from 28 January - 24.
Wood Biomass Basics Woody biomass: Thermal and combined heat and power (CHP) technology, applications & opportunities. Rick DeMark, Coordinator North Country.
Renewable Heat & Power Specialists GET - RENEWABLES Zero Carbon Home Damien Phillips – Manager, Green Energy Technology.
Workshop: Opportunities for Wood Heat from Forest Residues in Alaskan Communities Alaska Wood Energy Conference November 16 Fairbanks, Alaska Tom Miles.
Messersmith Manufacturing, Inc.
Presented By : Joan Chamberlain Executive Director.
Or How the North Country Is Moving Forward 2013 NCEC – North Country Symposium.
Economic Benefits of Energy Efficient Building conference Opportunities from Energy Efficiency – Invest NI Hilton, Templepatrick 17 th October 2013 Ian.
BOE PRESENTATION – TONA 2020 UPDATE JANUARY 30, 2014 PRESENTED BY: CARRIE OLIVER, LISA DRMACICH, BRIAN MISLIWY AND JAMES NEWTON.
Public Informational Meeting Waterbury Municipal Complex Thatcher Brook Primary School Gymnasium Wednesday, February 19, :30pm-8:00pm.
Funding for Public Schools in Colorado School Finance Partnership June 7, 2011.
Brian T. Woods, Ed.D. Superintendent Northside ISD.
Copyright © Cengage Learning. All rights reserved.
CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007.
Aspen Power, LLC Danny Vines, President October 7, 2010.
STUDENT FINANCE ADVICE. Student Financial Support for 2011 higher education entrants Student finance is available so you can make the most of your time.
The unpopularity of property taxes and the simplicity and perceived fairness of sales taxes have made the Local Option Sales Tax for Education a popular.
Lakewood School District REFERENDUM SEPTEMBER 30, 2014.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
January 7, 2011 Overview of Governor’s Introduced Amendments to the Direct Aid to Public Education Budget (and other Public Education Funding)
Madawaska School Department Heating System Renovation and Replacement.
QZAB Kenmore-Town of Tonawanda UFSD Board of Education June 11, 2013.
Tax Credits & Financing for Energy Efficiency & Renewable Energy Projects Presented by: The Morgantown Green Team.
Impact of Incentives: Driving Demand for Efficient Products Steven Nadel ACEEE.
TOWN OF HAMPDEN 2011/2012 PROPOSED BUDGET INFORMATION.
2006 Budget Challenges Additional Increases in Pension Contributions = +$451,200 Additional Assessment from RVSA = +$315,000 Increases in Fuel and Utility.
Overview Enacted July 9, 2008 Provides $650 Million in Funding and Tax Credits for Alternative Energy and Conservation Creates Two Funding Streams: –$500.
Manufacturing Engineering Introduction to Bioenergy Copyright © Texas Education Agency, All rights reserved. 1.
Preliminary Budget Proposal and Summary.
Our School REQUIRES INFRASTRUCTURE IMPROVEMENTS to maintain the working condition of the building. The total cost of the needed work is $2,255,000. We’ve.
SCHOOL BUILDING AID Ed 321 Administrative Rule Revision.
INDEPENDENT AUDITOR’S REPORT JUNE 30, 2015 ISD #413 Marshall Public Schools HOFFMAN & BROBST, PLLP.
Biomass Heating and the Renewable Heat Incentive.
WAREHAM PUBLIC SCHOOL DISTRICT January 15, 2014 OPEN HEARING FY15 Proposed Budget.
GEF Project Eligibility and Development National Dialogue of Turkey June 2006.
Presented by: Russell M. Arnold Jr., PE Director/Town Engineer Public Works Department Christopher N. Pierce, PE Wright-Pierce.
Douglas County School District Energy Services Performance Contracting.
ENERGY FACTS In 2001, the United States imported over 11.6 million barrels (487 million gallons) of petroleum per day.
 The U.S Department of energy has financed a program called ReEnergize. They create “Start Zones” in which a decrease in energy usage is funded. The Open.
FY16/17 Governor’s Budget Estimated Revenues Community Mental Health Revenue Overview January 18, 2016.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
An Overview of Considerations of District Energy in Montpelier.
Foley Public Schools. Truth in Taxation Timeline 2015 Pay 2016 Levy for School Year or FY2017.
Woodbridge Township School District Referendum 2017
FY18 Budget Update: Berlin-Boylston Regional
Summit County – Canyons Employee Housing
Qualified Zone Academy Bonds (QZABs): An Introduction
Woodbridge Township School District Referendum 2017
Office of Sponsored Programs
Roosevelt Union Free School District SMART Schools Investment Plan
Financial Assistance Application Director, Finance Department
The energy policy and conservation act of 1975
City of Blue Earth, Minnesota
Facility Options June 20, 2019 Presented by: Dr
Company Name: Registered Number: Presentation by:
Montgomery Township School District
Presentation transcript:

Biomass Boiler Project Oxford Hills Comprehensive High School

Project Summary Estimated cost $2,000,000 Estimated cost $2,000,000 Grant awarded from the Department of Conservation $750,000. Net cost $1,250,000 Grant awarded from the Department of Conservation $750,000. Net cost $1,250,000 Project eligible to be funded via Qualified School Construction Bonds (QSCB) because of the districts free/reduced lunch percentages Project eligible to be funded via Qualified School Construction Bonds (QSCB) because of the districts free/reduced lunch percentages –These bonds require a referendum vote –These are zero interest bonds - resulting in a $600,000 savings to the district over the life of the bond

Project Summary Will reduce the amount of fuel oil consumed by 88,500 gallons Will reduce the amount of fuel oil consumed by 88,500 gallons Net savings first year $128,000 Net savings first year $128,000 Savings will increase as cost of fuel oil increases Savings will increase as cost of fuel oil increases Reduces our dependence on foreign oil Reduces our dependence on foreign oil Uses a locally grown, and manufactured project (wood chips) Uses a locally grown, and manufactured project (wood chips) Results in significant beneficial impact on the environment Results in significant beneficial impact on the environment

Why a referendum vote? This project qualifies to be financed by Qualified School Construction Bonds (QSCB) due to the districts high percentage of free/reduced lunch students This project qualifies to be financed by Qualified School Construction Bonds (QSCB) due to the districts high percentage of free/reduced lunch students These are zero interest bonds These are zero interest bonds A referendum vote is required A referendum vote is required There is a limited amount of funds available so we need to move quickly to secure financing There is a limited amount of funds available so we need to move quickly to secure financing Our goal is to get the boiler on-line early in the heating season (January 1, 2011) so that we can save on oil costs. Our goal is to get the boiler on-line early in the heating season (January 1, 2011) so that we can save on oil costs.

Referendum Public Hearing - May 3 - 6:30 OHCHS Referendum Vote - May 11 in each town PLEASE VOTE!