1 Pilot operation on price risk management for cotton sectors in West and Central Africa Philippe Chédanne – Agence Française de Développement (AFD) International.

Slides:



Advertisements
Similar presentations
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) SP meeting Becici, 11 November 2010.
Advertisements

European Commission DG Development EC Responses to Soaring Food Prices Philip Mikos – DG Development Policies for the Sustainable management of natural.
Mutual accountability and aid transparency Mutual accountability and aid transparency Republic of Moldova 1IATI meeting, OECD Conference center.
Visit African Trade Policy Centre at Dialogue of the Executive Secretaries with the Second Committee October 2007 Abdoulie Janneh, ECA.
OECD Development Centre The OECDs Knowledge Broker on Development DAC Senior-level Meeting, Paris 6 December 2005.
Re-shaping the Role of Bretton Woods Institutions New Progress, New Trends, New Challenges, and New Directions By ZOU Jiayi World Bank Executive Director.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
ClimDev-Africa Program & African Climate Policy Center (ACPC)
1 The Food Crisis: Global Perspectives and Impact on MENA Fiscal & Poverty Impact Ruslan Yemtsov, MNSED MENA BBL Monday, June 16.
The Africa Action Plan An IEG Evaluation CSO Forum April 15, 2011.
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Spencer Henson & Oliver Masakure International Food Economy Research Group Department of Food, Agricultural & Resource Economics University of Guelph.
1 Reflections on the future Cohesion Policy DG Regional Policy European Commission.
1 18/02/ nd Regional Consultative Meeting for Disaster Risk Reduction in Central Asia Bishkek, November Adam Yao, ECHO, Head of Office for.
1 EU-AU Workshop on Social protection - in the informal economy Nairobi March 2011 Hjördis Ogendo/ Tamás Várnai European Commission DG EuropeAid.
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
1 Syria at a Turning Point Trends in the Syrian Economy University of Reading 23 rd February 2005 Dr Ken Charman.
1 Presentation to the Overseas Development Institute Friday, 30 January 2004 London Development Cooperation Report 2003 Presentation by Richard Manning,
New EU Forest Strategy and Update on Forest Information and Monitoring
Setting the scene: Improving project implementation in a changing environment 2005 Project Implementation Workshop, Bamako Improving project implementation.
PARTNERSHIP S IN SUPPORT OF CAADP Vision for next 10 years: Commitments to Sustain the CAADP Momentum Martin Bwalya
IMPLEMENTING FINANCIAL AND ACCOUNTING SYSTEMS FOR GOVERNMENT CHRISTIAN T. SOTTIE THE CONTROLLER AND ACCOUNTANT-GENERAL GHANA.
EU-Africa Cotton Partnership - concise update & CRM - Dakar, November 2005.
1 Assessment of Cambodia’s Statistics Capacity Prepared by Zia A. Abbasi IMF Multi-sector Statistics Advisor, Cambodia for the International Conference.
Progress in PRS Implementation: The Republic of Serbia Presented by Ivana Aleksić, Team Manager Poverty Reduction Strategy Implementation Focal Point Deputy.
Improving Market Access to the Poor in Africa Assefa Admassie Ethiopian Economic Policy Research Institute.
MALAWI CAADP IMPLEMENTATION PROGRESS A PRESENTATION MADE AT THE FANRPAN REGIONAL POLICY DIALOGUE- MAPUTO, MOZAMBIQUE. 3 rd September, 2000 By K. Ng’ambi.
Agricultural Policy Analysis Prof. Samuel Wangwe Executive Director REPOA 28 th July 2012.
Meeting of the CEI Working Group on Agriculture – Rome, 22 May 2006 FAO’s Technical Assistance Framework for Trust Funds in the Western Balkans 2006 –
1 Sustainable Agriculture strategy Zurich 8 th June 2011 Neil la Croix Director of Supply Chains.
PARIS21 - Meeting of Statistical Capacity Development Donors 27–29 April 2011, Paris, France Pietro Gennari, Statistics Division FAO Developing the Implementation.
A Model for Lowering Inter-Annual Revenue Variability for the Cotton Chain in WCA Countries by Jean Cordier Professor, Agrocampus Rennes ITF CRM annual.
1 From Disseminating Knowledge to Promoting Innovation: Challenges in reforming agricultural extension Rasheed Sulaiman V Centre for Research on Innovation.
AGENCE FRANCAISE DE DEVELOPPEMENT The quest for sustainability in National Development Banks Ignace MONKAM-DAVERAT Financial and Private Sector Development.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Lessons and implications for agriculture and food Security in the region IFPRI-ADB POLICY FORUM 9-10 August 2007 Manila, Philippines Rapid Growth of Selected.
With the financial support of MAFAP project overview.
IMPACT OF HIGH FOOD PRICES ON PRODUCERS AND REQUIRED INTERVENTIONS John Purchase Agricultural Business Chamber (ABC) Gauteng Food Summit 10 & 11 July 2008.
Food Security Strengthening the Supply Response: The Role of EBRD and MDBs Prepared for the Meeting of the G20 Ministers of Agriculture, Third Deputies.
WB Group Support to the Cotton Sector in Selected African Countries EU-Africa Cotton Forum, Paris, July 5 th and 6 th, 2004.
Finnish Trade Policies and Developing Countries: Case Africa Antti Loikas. Senior Adviser Department of Africa and the Middle East.
Planned Commission Communication on the role of the Private Sector in Development A contribution to the reflexion on How to Innovate International Cooperation.
World Bank Perspectives Global Conference on Veterinary Education and the Role of Veterinary Statutory Bodies Foz do Iguazu, Brazil - December 4-6, 2013.
By Ntando Ndlovu - ZIMCODD1 Removal of subsidies on cotton trade and growth of the cotton industry in Africa SARPN/EJN Regional Strategy Meeting on Hong.
1 Development of the Cotton Sector in West and Central Africa Gobind Nankani, Vice President of the Africa Region, World Bank Wilson Center conference.
FOURTH CABINET RETREAT 20 – 21 DECEMBER 2011 PRESENTATION BY MOTIE.
Distributional Analysis of Fiscal Policies at the IMF PREM 2011 Knowledge and Learning Forum World Bank April 25, 2011.
IMPACT ASSESSMENT OF THE MULTILATERAL AGRICULTURAL TRADE NEGOTIATIONS ON CEMAC COUNTRIES By: Ernest BAMOU & Jean Pierre TCHANOU UNCTAD workshop on Trade.
Agence Française de Développement – AFD – Page 1 Alexis BONNEL Sector Operations Agence Française de Développement Infrastructure Trust Fund.
Conclusions and Recommendations 3 rd Agribanks Forum Mary Nandazi, Calvin Miller, Dorothy Nduku & Mumbi Kimathi.
TOWARDS BETTER REGULATION: THE ROLE OF IMPACT ASSESSMENT COLIN KIRKPATRICK IMPACT ASSESSMENT RESEARCH CENTRE UNIVERSITY OF MANCHESTER, UK UNECE Symposium.
Methodology for preparing national cotton strategies in Africa Alexander Sarris Director, Commodities and Trade Division Food and Agriculture Organization.
Financing for Development: A Progress Report on the Implementation of the Monterrey Consensus Meeting of the Committee of Experts of the 3rd Joint Annual.
DG Enlargement – Effective Support for Enlargement Conference, Brussels 19 October 2009 Concluding Remarks of the Co-chairs.
Risk Management Schemes for West African Cotton Christopher L. Gilbert Panos Varangis Commodity Risk Management Group, World Bank EU-Africa Cotton Forum,
CIS meeting Budapest 3-4 July 2013 Christophe Duhamel the Global Strategy to Improve Rural and Agricultural Statistics Reminder on GS objectives Specific.
07/02/2011Rural Development in the CAP post RURAL DEVELOPMENT IN THE CAP POST 2013 Attila JAMBOR Assistant Professor Corvinus University of Budapest.
Monitoring and Evaluating Rural Advisory Services
International Livestock Research institute
Under What Circumstances Can the Use of Price Policy Contribute to Improved Food Security Ephraim W. Chirwa Presented at FAO Consultation on “Trade Policy.
Claudia Uribe Colombian ambassador to the WTO
FINANCIAL STABILITY- NEW CHALLENGES FOR CENTRAL BANKS
UN ECONOMIC COMMISSION FOR AFRICA
Promotion of Coffee certification and contract farming for better livelihood : The case of Ethiopia Yadeta Bekele Jimma University ,Ethiopia.
Emerging issues on PRGF –
Rural Partnerships between Small Farmers and Private Sector
Stakeholder consultation on the CAFÉ baseline agricultural scenario
AGRICULTURAL INSURANCE IN TANZANIA
Presentation transcript:

1 Pilot operation on price risk management for cotton sectors in West and Central Africa Philippe Chédanne – Agence Française de Développement (AFD) International Conference on cotton ; Woodrow Wilson Center ; October 26, 2006

2 PLAN of the PRESENTATION Introduction : Background context : Main factors of the success Major evolutions What roles for Aid ? French aid strategy Pilot operation on PRM (Price risk management) Conclusions

3 INTRODUCTION : background context Cotton production in WCA : a success production * 3 in 50 years ; growth rate cotton : 6,6% per year (over 30 Y) Today Africa : 2 nd world exporter, after USA 2 millions farms grow cotton (in rotation with cereal) => 16 millions depend on cotton revenu important driver of economic growth, rural development (rural infrastructure, organisation of producers, modernisation of agricultural practices : access to input, credit, improvment of food security…)

4 Cotton production in WCA : a success

5 Main Factors of the success One fact : current (or traditionnal) use of PRM in WCA cotton sector is low… Price mechanism to determine the producer price : garanteed, announced before sowing, second payment at the end of the season if commercial profit Minimum price garanteed thanks to stabilization fund => producers bear fairly no price risk => ginning companies : bear intra-seasonnal price risk and inter-annual (minimum price). In practice : State donor of last resort when stabilization fund exhausted or insufficient Consequences : low volatility of prices at the producer level / high budget risk - rapid volume growth over decades (and rural monetary revenue) - lower share of world prices for the producers - low incentives for ginners to manage price risk (poor commercial policy => traders) - large risk (and rising) on the State budget New institutionnal framework => need to develop PRM capacity Privatisation of ginners + rising nber of traders => ginners bear PR and have to manage cmcial policy New price mechanism ex Mali => producer bear PR (receive 60% of world price) Still cotton sector important for economy => State bear some responsability (macro and social policy)

6 Major evolutions Todays challenges for cotton sector in WCA Countries vulnerable to world price volatility more than 90% of cotton is exported (very limited textile industry) Macro level (growth rate, budget), social (poverty), politicaly Competitiveness challenge for the WCA cotton World price decline in recent years, worsened by dollar depreciation against EUR Subsidies ( wide range of estimated impact on level of world prices : from 2% to 72%) Productivity gains (GMC,…), India, Brazil : rising yields ; stagnation or decline in WCA Quality issue of the cotton fibers and US standards dominating the market Institutional issues : reform undertaken to strengthen the producer org involvment in the management of the commodity chain, privatisation to bring new capital and skills, incentives… => low alternative products in the sahel region

7 What roles for Aid ? French Coop / AFD strategy to address those challenges : Mitigate the impact of world price volatility to the sector => pilote operation on price risk managment combining different instruments (smoothing funds, market instrument, and safety net) to mitigate world price volatility impcat on the income of cotton sectors and cotton producers in WCA Enhance the competitivness of the cotton chain Projects aiming at rising yields (dev equipment credit, improved extension services, strengthen PO capacity…), reduce ginning costs,… Support institutionnal reform (special attention for critical functions : credit, input,…) Support to the C4 negociation capacity on the Doha round trade negociations Promote donor coordination in cotton interventions : UE-African Partnership : Action Plan adopted july 2004 in Paris Cotton-Club (include WB, and open to new cotton donors) Scheme proposed to manage price risk : joint Feasability Study with WB and CRMg, participation of EC, and result will be shared with WB, CE, NL, Germany in a informal steering Committee

8 Pilot operation on PRM (price risk managment) Development of PRM capacity : a necessity for cotton sector in WCA Donor consensus on that issue because of the assessed negative impacts of price volatility on poverty, performance of the cotton chain, and macro policy =>macro level : FLEX (EC), ESF (IMF), WB research to introduce vulnerability index in aid allocation Donor commitment to deliver on that issue PRM is one of the 7 issues that constitute the Action Plan of EU-Africa Cotton Partnership Where do we stand ? e French Coop /AFD have launched several studies since 2004 => proposed this PRM scheme These studies were regularly shared with donors (WB, CRMG, EC, cotton club) => improvement At the beginning, first discussions tensed (ideological opposition : market instrument vs stabilisation funds =>then progressive convergence on the complementarity of these tools : market based instrument deal with intra-annual volatility, whereas smoothing funds deal with inter-annual volatility This scheme was presented to all the stakeholder of cotton sector in Dakar in Nov 2005 (producers, Ginners, public Administration from 6 WCA couontries, banks, traders, regional institutions, donors, NGOs) ; april06 FZ => strong demand on PRM capacity building, improved tools and funds Joint feasability study (WB, CRMG, EC) => result shared « informal » Steering Committee ( Cotton Club)

9 INTRODUCTION : pilot operation on PRM (price risk managment) PRM scheme objective : The objective of the scheme is to mitigate excessive variations of prices for producers, without running against long term market trends, by using a series of tools adapted to the nature and scope of the risk. = transmit long/medium term market signal to producers, withdrawing noise (volatility) => Optimise economic decisions on resource allocation

10 1. Use of reference markets (NYBOT/Cotlook A and exchange rate USD/EUR to define a « fair » CIF-FCFA reference price 2. Non manipulable reference prices : establishment of a pivot price linked to an international price index and automatic operating modalities of the smoothing fund 3. Design « price layers » with respect to probability of occurrence Layer A : Risk retention layer Prob(Layer A) 90 % Layer B : Market instrum. layer Prob(Layer B) 10 % Layer C : Market failure layer Prob(Layer C) 1-5 % 4. Design tools matching each layer with portfolio consistency and governance potential 5. improvement of banking services to the sector (mangmnt of smoothing funds, sell market instruments ?…) 6. Define a formula pricing for sharing cotton value between ginners and producers The model

11 INTRODUCTION : pilot operation on PRM (price risk managment) PRM scheme : design and implementation issues design issue : Modeling of world price behavior (choice of price index, deflator, time period) has an impact on the asumptions to simulate forecasted price series, and thus parameters of the sheme =>ongoing expert technical discussions implementation issue : how to build on current practice and move toward this intended better managed PR ? - transitional period and measures must take into account country specificities (relative importance of cotton in the economy, institutionnal organisation of the cotton chain, bargaining power and capacity of the different stakeholders…) - Parametrisation of the different tools of the mechanism must be defined within the interprofession, according to the level of risk smoothing desired/acceptable. => Issues to be adressed by the joint feasibility study for a pilot operation in BF and Senegal.

12 INTRODUCTION : pilot operation on PRM (price risk managment) Schedule for the pilot operation : Joint Feasibility study : M ay to June (5 experts + expertise from J. Cordier and Ch. Gilbert) Informal Steering Committee (Cotton Club) : Ju ne /July2006 Joint evaluation mission : end of 2006 pilot project : AFD : Board decision in January 2007 for 10 MEUR (funding the regional smoothing fund, training and capacity building on the PRM scheme,…) ?? BM / CRMG ?? : funding the training and pilote introduction of market based instruments ? EC ? …

13 Thank you for your attention

14 PRESENTATION OF THE MODEL price risk managment scheme combining smoothing funds, market instrument, and safety net to mitigate world price volatility impact on the income of cotton sectors and cotton producers in WCA …by Professor Jean Cordier