PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Bubble Chamber Planning Meeting 04 September
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
CLAS12 Drift Chamber Prototyping
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
SBS Magnet and Support Status Robin Wines June 2013.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Bubble Chamber Planning Meeting 07 August
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
ELENA installation progress F. Butin / ELENA collaboration.
LDRD Brainstorming Session
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Spectrometer Solenoid Fabrication Status and Schedule
PEPPo Experiment Readiness Review
A. Freyberg Aug 2016 ECT’16 =>
Injector / Linac Installation Current Status
LCLS Undulator System Status and Schedule
Upgraded Injector Test Facility
Extraction Michael Bevins May 17, 2007
LCLS Undulator System Production Management
LCLS Undulator System Status and Schedule
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
One Coil Gun Magnet February 2, 2016.
Injector/Linac RF Status
Polarized 3He target installation
Presentation transcript:

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation Logic Part 3 – System-by-System Labor Estimate Joe Grames (v3.0 – 2/16/11)

PEPPo Experiment Layout = Composed of 4 regions Region 1 - e- beam to target Region 2 - e+ spectrometer Region 3 - diagnostic line Region 4 - Compton polarimeter Part 1 – Technical summary of layout

Region 1 - e- beam to target 5-port vacuum chamber design in process machine shop fabricate Dipole magnet (not captured) use (pre)existing magnetic measurement Vacuum valve valve + control channel + software BPMs (2) fabricate can + weld antennae cables + electronics + software Steering Coils (4) Haimson H/V – on-hand Trim 1 Amp (4) + cables + software Cross #1 (Diagnostic) viewer + viewer channel + camera + video channel + cables Ion pump + HV supply + cable Cross #2 (Target) Target ladder + motion + cable Video channel + cable Ion pump + HV supply + cable Girder layout fabricate girder channel + pedestals Alignment of elements on girder upstairs Alignment of dipole + girder in tunnel

Region 2 – e+ spectrometer RearFront Positron Spectrometer Solenoid (1) + Dipole Pair (1) MOU w/ Princeton signed February, ship from SLAC March Each magnet requires cooling + power supply + cables Magnetic measurement Vacuum chamber supplied by SLAC Design + fab support table for magnets Alignment of magnets to table upstairs Alignment of table in tunnel

Region 3 – diagnostic line Cross #1 Viewer + viewer channel + camera + video channel + cable Ion pump + HV supply + cable Solenoid on nipple Spare INJTWF magnet (on-site) Add original cooling circuit Fab two end plates w/ larger ID Magnet cooling Power supply Magnet measurement Cross #2 Target ladder (tungsten foil + viewer) + cable + software Camera + video channel + cable Ion pump + HV supply + cable Thin vacuum windows Annihilation Counter (not shown in drawing) Idaho State University (due summer) HV + signal cables + small lead shield P1 silicon Detector (not shown in drawing) Collaborator TBD Air-side diagnostic (4 cables) Table or small girder Alignment of elements on girder upstairs Alignment of girder in tunnel?

Region 4 – Compton polarimeter Analyzing Magnet + Tungsten Target Loaned from DESY (in EEL lab) LCW magnet cooling Power Supply magnet measurement Align magnet to support table Array of 9 CsI crystals (DESY) + PMTs (LPSC) Assembled at LPSC, ship to JLAB in April PMT cable pull (HV + signal) Support table (completed) Crane table to injector Lead shielding 250 lead bricks (10,000 lb) At JLAB (ISB) => crane to tunnel

MonthRegion 1Region 2Region 3Region 4 February (Design) Design evaluation Ship spectrometer & vacuum chamber from SLAC to JLAB Design evaluation Assembly at LPSC March (Design/Fab) Complete design Start fab/acquire hardware Receive hardware & QA. Design evaluation Start MFG mod Complete design Test PMTs, fab patch Analyzer magnet mapping April (Design/Fab) End fab/acquire hardware Map spectrometer Complete design Start fab/acquire hardware End MFG mod Complete full assembly and test May (Fab) Assemble beam line Pre-align Map 5MeV dipole Start table fab & vac chamber mods Map MFG End fab/acquire hardware Ship polarimeter from LPSC to JLAB Lead bricks to tunnel June (Fab) Install 5-way port at INJ Install 5MeV dipole at INJ End table fab & vac chamber mods Assemble spectrometer Pre-align Assemble beam line Pre-align QA polarimeter at JLAB DAQ integration testing July (Fab/Install) Move girder to INJ Install + vacuum connect Align Move spectrometer to INJ Install + vacuum connect Align Move diagnostic line to INJ Install + vacuum connect Align Move polarimeter INJ Install + vacuum connect Align August (Install) Cabling + connections Cabling + Connection Cabling + connections September (Float) Float October (Commission) Ready to commission Part 2 – Month-by-Month Installation Logic

Designer – continued level of support through August (total 12 pw) minor evolution of layout, design/integration of beam line components, provide drawings for shop, specs for materials, help QA assembly and installation Machine shop – fabricate and/or modify about dozen parts, mainly vacuum + some magnet 5-port vacuum chamber, BPM cans, few nipples, thin vacuum window, any mods to spectrometer vacuum chamber, add cooling circuit to solenoid, fabricate solenoid return yoke Magnetic measurement –Map 5 magnets from March to May (typ. 1-2 days/magnet => 5-10 days) 2 focusing solenoids + 1 spectrometer + 1 target solenoid + 5MeV dipole Installation – a handful of ½ days to move equipment & installation at INJ Move 4 girders + 2 pallets of lead to INJ Penetration open for cable pull Alignment – 1 week of integrated alignment April-June and handful of days July-August for installation Pre-align components to support girder/table for regions 1-3 in survey lab Final alignment of support fixtures for regions 1-4 at injector EES-DC & EES-IC – assuming each element is a person-week, I estimate 20 person-weeks (4) 1 Amp trims for steering coils (4) Bulk supplies for big magnets (1) Valve, (2) Viewers, (4) video, (2) target ladder Cable pulls Software – assuming one person is always doing something July-August, I estimated 8 person weeks Integration of about 25 different standard hardware elements (magnet, valve, viewer, BPM, video, ladder) Modest support via ACE for DAQ Part 3 – System-by-System Labor Estimate