London Infrastructure Development

Slides:



Advertisements
Similar presentations
Learning from Events 12th June 2013 The Tata Steel Approach
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
September Wood to Warmth – Fuel Delivery and Storage Michael Beech TV Energy.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
FAÇADE RETENTION IN CITY-CENTRE DEVELOPMENT
How Governments Have Made Broadband Network Rollout Possible CANTO Conference & Exhibition 22 nd – 25 th July, 2012 – Miami Andrew Gorton Group Head of.
© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Houston Region Import Capacity Project Planning for Reliable Power.
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
Gdpack 40.5kV Technical Data Sheet MV-LV Prefabricated Substation
Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
Infrastructure Projects 1 FHR6 Blockade Works 12th August 2013 Network Rail & Northern Rail Co-ordination Meeting.
CITY CENTRE Neighbourhood Environmental Projects Overview Environment Forum 17 th December 2013.
10 to 15 Year Golf Course Development Plan. There are currently 3 greens that have been upgraded to/close to USGA specification (1st, 4th, 17th) and 2.
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
Innovative solutions in rights of way to support broadband development Antti Kohtala Ministry of Transport and Communications Finland Digital Agenda Assembly,
Tuesday 13 th December 2005 Substation SB400. Final testing in 10Kv substation.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
July 6th1 “Laying the foundations for Growth” “Connecting Nottingham” NextGen Roadshow - Nottingham.
Luas Cross City Main Infrastructure Works April 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Innovating in a compact environment
The Al Huwailah Link Road Project (P021)
A127 Ardleigh Green Bridge replacement - update EPAGRA Meeting 2 July 2015 Ardleigh Green Bridge replacement – update.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Other Construction Projects
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
World Cup Readiness Presentation to the Joint Committee 19 May 2010.
Tower Bridge. Tower Bridge is a suspension bridge in London, over the River Thames. It is close to the Tower of London, which gives it its name. It has.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
1 An overview of our workforce requirement Our aim is to create and develop a motivated and inspired workforce to help to deliver a memorable Olympic and.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Crossrail: Station Accessibility Matthew Lodge 10 July 2013.
About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
West Cambridge Data Centre Ian Tasker Information Services.
High Temperature Superconducting (HTS) Cable Project
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
Brixton Green Brixton People Know What Brixton Needs Dinah Roake
Progress Briefing - Energy Initiative
The fibre journey for fibre-to-the-cabinet (FTTC) solutions
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
Electric Utility Master Plan Update
Background B513 built in early 1970’s for mainframe era.
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
A future benefit for the South Cheshire infrastructure
A future benefit for the South Cheshire infrastructure
Delivering East West Rail
New Public Transport Infrastructure
ED1SON alliance.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
FAÇADE RETENTION IN CITY-CENTRE DEVELOPMENT
Presentation transcript:

London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks

Central Area Supergrid Substations

Central area supply network

EHV (132kV) network enhancements

Increased Resilience

Work in Progress

Additional Requirements Additional operational sites Continue and enhance co-operation in gaining new sites within new and existing developments that can feed out onto the network. Third party consents for tunnels, new sub-station works and modifications to existing operational sites.

Future: Calshot St Establish 132/11kV Substation

Future: Farringdon satellite 11kV switchboard

Wider EHV Network

Central EHV Network: Summary 860MVA of new transformer capacity by 2016 Matched by new National Grid supergrid exit capacity City of London supply diversity facilitated by the New Cross-Finsbury Market cable tunnel New resilient 33kV network to accommodate large point loads Planned new installations at Calshot St 86MW firm & Farringdon Further new substations being designed Further sites required, obtaining consents in a timely way.

33kV Network Delivery Dedicated Project Team to deliver the 33kV feeder infrastructure and dedicated services Frequent Client Liaison Including Progress Reporting Project Plans Spend Profiles Risk Management Close collaboration and assistance from CoL and TfL.

33kV network feeder spines

Central London – 33kV network Comprises of 3 new feeder groups Red Lights on Q3 2012, full functionality Q3 2013 Committed load, five customers, 59MVA Green Lights on Q4 2012, full functionality Q4 2014 Committed load, five customers, 63.2MVA Blue Osborn Street upgrade dependant, post 2017 Currently receiving enquiries 15

Red Route Progress Ducts and cables installed from Back Hill to junction of Camomile Street. Final jointing in progress to energise from Back Hill Switchgear for first customer has been manufactured - delivery and commissioned within the next two months. All switchgear has been ordered for the other customers. Final section from Camomile Street to Finsbury Market will be completed after the Olympics. 16

Green Route Progress Ducts installed from Great Sutton Street to Fan Street. Expected completion from Great Sutton Street through to Finsbury Market by August 2012. First two feeders to be live by end 2012 to connect one customer via temporary circuit breakers. The rest will be made live following the completion of the new switchboard at Finsbury Market July 2013. Excavation from Great Sutton Street to Back Hill to take place in 2013. 17

This excavation by Murphy Ltd in December 2010 was at the junction of Cheapside and King Street in the City of London and forms part of the Pinnacle 33kv route; as you can see there are many existing services present making trench excavation very difficult along with the installation of trench support prior to duct installation.

This excavation in Cheapside was adjacent to St Mary-Le-Bow Church and shows the additional trench support required for a deep excavation along with steel beams and nylon straps to support existing services. The excavation at this point was moving from the Westbound carriageway into the Southbound carriageway; a shallow bank of approx 30 telecoms ducts with a concrete surround was uncovered in the middle of the road; beside this was a large Water main followed by a large Gas main therefore the only space available for our new ducts (26 in total) was a 250mm gap below the exposed mains and just above the Victorian brick built sewer approx 3.5 meters deep. The trench had to be extended to approx 5 meters wide to create enough room for the ducts to be installed in a flat formation by 3.5 meters deep; an excavation of this size required a temporary works design and this section alone took approx three weeks to complete.

This excavation in Cheapside by Laing O’Rourke shows the four x 200mm and 6 x 89mm ducts for the Pinnacle 33kv scheme along with 16 x 11kv ducts installed as part of the One New Change scheme; the 4 x 200mm ducts laid flat in the trench are ready to be connected following the installation of a cement bound sand bed.

This section of work in Worship Street Hackney was completed by Compass Infrastructure (formally Nacap) and shows 200mm ducts installed for four separate 33 kv schemes, 4 ducts for the Pinnacle Tower (red route); two ducts to Bishops Place (Green Route); two ducts to the Interxion Data centre at Brick Lane and four ducts for the Blue route; the 89mm ducts for the pilot cables were installed shortly after; all 12 33 kv ducts have been surrounded by cement bound sand. Also noticeable in the photo each side of the 200mm ducts is a layer of very hard dark coloured aggregate which is believed to be the original 17th century road construction as confirmed by the Museum of London archaeologist who visits site on a regular basis.

This photo shows 24 x 500 metre drums of 33kv Copper cable recently delivered to our contractors Compass Infrastructure (formerly Nacap) and currently stored in Bishopsgate adjacent to the Pinnacle Tower; cable installation has now started and will continue into 2012. Compass did provide overnight and weekend security.