Suppliers Technical Forum - Innovation

Slides:



Advertisements
Similar presentations
The ePractice. Yesterday 1900s Word Processing about 30 words per minute.
Advertisements

Managing Hardware and Software Assets
Date Application of Innovation and Technology to reduce the Safety Risk at Level Crossings and deliver Value for Money Name of presenter here.
Mid-market server campaign – thru partner presentation: Slide for presenter only: do not show Speaker: Partner Title of Presentation: Giving you the power.
AUTONOM - Integrated through-life support for high-value systems
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Love your 2070 Readers digest version Condensing City of Portland, Northwest Signal material and a couple other notes.
Radiation Shielding Information and Guidance
Security and Surveillance Robot of New Generation
1 an online tool for GSM networks Planning and Inventory and others… IMK Consulting Simple tools for complex needs IMK – your IT tailor.
Office Solutions Presentation to NWPCSS October 2nd Delivered by Mike Low.
Pre Sales Dept. HERCULES Solar 26 1 A Condensing floor-standing boilers with built-in solar circuit.
Public Safety Related Applications Summary July, DRAFT -
Olympus DM-20 Digital Voice Recorder We’re high tech now, baby!
Ronald J. Zimmer, CAE President & CEO Continental Automated Buildings Association (CABA) HOME AREA NETWORKS in a Smart Grid.
Share with Pride Train Mounted Laser Survey of Birmingham New Street Area Resignalling Phase 7. Neil Archer – Signalling Innovations Group Rob Dutton -
Which server is right for you? Get in Contact with us
Business Critical Rules March 2015
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
April 2004 page 1 Confidential and propietary CentraLine Portfolio c l o s e t o y o u.
1. THE TRANSLATION NETWORK Case Studies 2 THE TRANSLATION NETWORK6 Intel OSTC uses Drupal for localization for the Tizen initiative into 6 languages.
We make it easier for businesses of all sizes to safely accept checks transmodus offers clients automation utilizing our online processing platform for.
Ontario International Transport and logistics Chapter 7: Rail and Intermodal.
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
1.
Xora GPS TimeTrack™ Take charge of your mobile workforce.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
First Capital Connect St Albans City & District Council Overview & Scrutiny (Public Services) Committee 13 July 2011 Neal Lawson Managing Director First.
Accelerating Product and Service Innovation © 2013 IBM Corporation IBM Integrated Solution for System z Development (ISDz) Henk van der Wijk 23 Januari.
Electrical Safety. What Are Electrical Risks? Electrical risks are risks of death, electric shock or other injuries caused directly or indirectly by electricity.
Computer communication
Service Section Technical Training Dec A Standard Wireless Networking Protocol Zigbee Wireless Technology.
Page 1 May 2010 © Siemens AG 2010 Industry / Drive Technologies Innovative Hybrid Drive Systems for Commercial Vehicles Industry – Drive Technologies Innovative.
Home Media Network Hard Drive Training for Update to 2.0 By Erik Collett Revised for Firmware Update.
Your Logo T-Scale Intermodal Intermodal communication environment.
RESTRAIL Final Conference Lessons Learned from WP4 – Mitigation of Consequences Gilad Rafaeli, MTRS3,
20.3 Electric Circuits
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
Physical ways of keeping your system secure. Unit 7 – Assignment 2. (Task1) By, Rachel Fiveash.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
Cloud Market Readiness Report Finance, Media, and Legal Sectors March 2014 Trend Consulting 2013.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Service excellence for customers world-wide The Cost Of Test: A Perspective from a Test Service Provider SETNET User Group 21 February,
„Tbilisi - Smart City“ LEPL - TECHNOLOGY DEVELOPMENT FUND (TDF) 2015.
An Overview of the Smart Metering Programme in GB.
TELEWORKING Year 13. Lesson Objectives Pupils will understand: The definition of teleworking. Use and associated hardware of teleworking. Advantages and.
Physical Security Concerns for LAN Management By: Derek McQuillen.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Innovation and Supplier Engagement Steve Yianni. 2 £5.2bn Transformation must deliver £4.1bn CP4 OUTPUTS what we need to deliver Saving money.
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
Merseytravel Driving Effective Learning Stephanie Hague - Head of Learning, Merseytravel Michael Jarvis - Technical Director of GAP Consulting.
Data Enabled Railway July 2015 Railway Suppliers Summer Conference 2015 Steve Warner, EMEAR Head of Data & Analytics.
A significant Term to ensure flawless performance Mobile App Maintenance.
Work Place Transport. Members of the BPF Health & Safety Committee.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
( ) 1 Chapter # 8 How Data is stored DATABASE.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
Constraints Space Load Capacity Costs Operating hours.
UNIT 4 NETWORK ENVIRONMENTS.
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
Manufacturing Productivity Solutions
Types of information systems (IS) projects
    PRODUCT PRESENTATION ON :   INCREASING REVENUE BY USING GLO 3G NETWORK TO SUPPORT REMOTE AUTO DIAGNOSIS AND MANAGEMENT (GLO VEHICLE DIAGNOSIS AND MANAGEMENT)
Increasing Asset Lifecycle through the application of Innovative Technology
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
East Coast Route Study November 2016 update.
480 to 30 7 to 1 Automating the Law Wednesday 14th December 2016
Automated Fare Collection 2.0 Next Generation MBTA Fare System
Presentation transcript:

Suppliers Technical Forum - Innovation David Pinkney Date 13.02.2013 Date 00.00.00 Create your footer by changing copy in the Header and Footer section 1 1

Innovation on Thameslink Using new products equipment and tools to reduce costs and create efficiencies Often teamed with headquarters, maintenance, or another programmes Most have a large engineering content and the development of a new product Often involve product acceptance and changes to ways of working Need to flexible, adaptable, thinking out of box But still supporting programme delivery Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 2 2

Example of a successful project - New CCTV technology for London Bridge Use of mega pixel technology to reduce the number cameras needed for London Bridge station. The reduction of cameras produces reductions in brackets, power, cables The like for like saving for the London Bridge installation is £1m (25%) but the big saving is in maintenance – circa 60% Project Manager’s role was to gain acceptance by the HQ CCTV group and NR Head of Security and have the standard changed Date 00.00.00 Create your footer by changing copy in the Header and Footer section 3

Mobile Maintenance Unit The MMU is a train with a workshop, stores, messing, worker transport Self contained train for installation and maintenance Moving green zone – work force protected Realisation is that MMUs will radically change the way we plan and manage our site work Date 00.00.00 Date 00.00.00 Presentation title to go here Create your footer by changing copy in the Header and Footer section 4 4

Mobile Maintenance Unit Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Mobile Maintenance Unit Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Mobile Maintenance Unit – Status Nationally 7 units are needed (4 specifically in the south east) Aligning Thameslink with Kent In the tender process – 5 companies bidding Planning visits to users Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 7 7

Mobile Maintenance Unit – Status Continued For Thameslink two extra variants For tunnel working - To reduce costs – TOC compensation, 7 day railway Keeping one track open while working on the other track Still a mobile green zone Expanding slides and opening side doors Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 8 8

Mobile Maintenance Unit – Status Continued Second variant Enables slim-line gantries to be used Efficiencies in installation and maintenance The necessary kit is there Difficult bit – How are we going to use it? Define the processes Which variants do we need? Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 9 9

Cable Management Sleepers Replace Under and Over Track Crossings Orange Pipes and Yellow Split Ducting Savings of the order 95% Reduce risk as the track bed is not disturbed Two variants product accepted In use across the whole of Network Rail as well as Thameslink Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Cable Management Sleepers – further work Modified Wider rebate Clips Inserts to mount third rail insulators Production moulds for GV54 sleeper on order Thameslink requirements until 2018 defined Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 11 11

Cable Management Sleepers Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Negative Short Device The Negative Short Device will be used to improve the efficiency and safety of third rail isolations. Replace short circuiting straps and strap-men (can have up to 25) Simplifies the process considerably Project timescale 40 weeks Proposed fit NSDs to London Bridge low level Manual switched solution – not using SCADA Only 25 NSDs needed Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 13 13

Increase in Work Time with NSDs Current situation Available work time 2h 30m Complicated Many phone calls With NSDs Available work time 4h 00m Much simpler Far fewer phone calls Date 00.00.00 Create your footer by changing copy in the Header and Footer section

NSD Savings Reduction in resource needed over 2 years = £840k Reduced communication over 2 years, 208 hours = 52 extra shifts Not cancelling the first and last trains over 3 years = £300k Reduction in risk Reduced requirement for line blockages Less staff on the infrastructure Reduced involvement from interface stakeholders No strapping in the wrong area Reduced communications Reduced staff on track / less chance of injury Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Snow displacer Very simple, inexpensive length of foam that sits in the point ends Stops snow (anything else) from entering and jamming the points Saves delay minutes Saves energy (30%) by insulating the point heaters Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 16 16

Snow displacer installation Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Snow displacer – status Thameslink is part of the national programme Trial underway at Hither Green Further work – Develop a version for the very narrow end of the points Arrange for points to be automatically fitted to the points at the factory ‘Productionise’ the existing snow displacer for easier fitting Date 00.00.00 Date 00.00.00 Create your footer by changing copy in the Header and Footer section Create your footer by changing copy in the Header and Footer section 18 18

Electro-luminescent PPE Worked very closely with the suppler Fhoss to complete final development Thameslink Route Access Team is testing 10 sets of PPE Battery life 12 hours A worker can be seen 1 ½ miles down the track Compliant with Rail Standards Additional cost is not significant Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Pavegen – electrical energy from foot falls Sustainable renewable energy Floor tiles form the green area in the ‘mock up’ photo Hopefully drive assets such as destination boards Trial site in the station to be set up Date 00.00.00 Create your footer by changing copy in the Header and Footer section

CCTV Scanning of Pantographs A damaged pantograph or shoe can cause much damage to the infrastructure and very many delay minutes Even more when we are at 24 trains per hour CCTV scanning will allow damaged trains to be sidelined before they enter the Thameslink central core An installation at Farringdon will check that the pantograph is down as the train travels south into the third rail area Probably the trial site will be at Farringdon A camera installation showing the housing containing the radar, flash and camera Date 00.00.00 Create your footer by changing copy in the Header and Footer section

CCTV Scanning of Pantographs A drawing of a typical installation in the Nederlands Date 00.00.00 Create your footer by changing copy in the Header and Footer section

Balise Bars Can be used for Balise Bars from Siemens, Alstrom and others Can be fitted or removed in less than 2 minutes using standard tools Use standard rail fittings so no drilling or digging out the ballast

AWS magnets Ordinary ferrite magnets – Lose strength due to interference in third rail areas Bulky heavy  Require frequent maintenance or rebuilding Vortok - Rare Earth Magnets With an opposing coil and digital control electronics Smaller and Lighter Little or no loss of strength Plug coupled so quick to fit

Innovation on Thameslink Not just be confined to Network Rail Surely our partners have innovations as well Example – Invensys use the IBM Rational tool provides platform for integrating and synchronizing product development processes The need - Invensys Rail Dimetronic needed to improve its competitiveness and reduce time- to-market for its solutions. This required automating, streamlining and increasing control over development processes. The solution The company used integrated IBM® Rational® software to automate code generation and speed developers' response to frequent changes and new traffic signal requirements. The benefit The company reduces time-to-market for products by 40 percent and reduces cost and risks of development by generating all code in compliance with coding standards. This case study has been published by IBM Please tell me of your innovations on Thameslink Are there opportunities for partnering? Date 00.00.00 Create your footer by changing copy in the Header and Footer section