January 2015 SG CUB Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0072r0 Submission September 2014 Hyunduk Kang, ETRISlide 1 September 2014 IG CUB Closing Report Notice: This document has been prepared.
Advertisements

Doc.: IEEE /0085r0 Submission November 2014 Hyunduk Kang, ETRISlide 1 November 2014 IG CUB Closing Report Notice: This document has been prepared.
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
LB73 Noise and Location Categories
Call for Contribution to IG CUB
Call for Contribution to SG CUB
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
March 2014 Election Results
TV White Space Coexistence Plan
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
November 2013 Opening Report
Decision Topology Definitions
March Opening Report Date: Authors: March 2010
March 2007 Opening Report Date: Authors: March 2007
Contribution on Location Privacy
January Opening Report
IEEE P Project Status Date: Authors: July 2013
Decision on SG Formation
November Opening Report
TVWS Coexistence Study Group Extension Request
July Opening Report Date: Authors: July 2009
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
November 2014 IG CUB Closing Report
July 2015 SG CUB Opening Report
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
Discussion on SG Formation
Decision on SG Formation
September Opening Report
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
Addressing White Spaces Across all of IEEE 802
IEEE P PAR Extension Request
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
November 2014 IG CUB Opening Report
January Opening Report
March 2015 SG CUB Opening Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
EC Study Group on TV White Space
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
November 2012 Opening Report
September 2012 Opening Report
TV White Space Coexistence Plan
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Motion for Study Group on TV White Space Coexistence
July 2015 SG CUB Opening Report
July 2015 SG CUB Closing Report
TGu-changes-from-d0-03-to-d0-04
July 2014 Opening Report Date: Authors: July 2014
July Opening Report Date: Authors: July 2010
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November 2014 Opening Report
July 2013 Opening Report Date: Authors: July 2013
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

January 2015 SG CUB Closing Report Date: 2015-01-15 Authors: Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.19. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <shellhammer@ieee.org> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.19 TAG. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Hyunduk Kang, ETRI Steve Shellhammer, Qualcomm

January 2015 Abstract This is SG CUB closing report from January 2015 interim meeting in Atlanta, U.S.A. Hyunduk Kang, ETRI

Results of the Week Technical contribution January 2015 Results of the Week Technical contribution Coexistence Scenario and Use Cases (19-15/0010r0) Consideration on Neighbor Discovery (19-15/0013r0) Discussion on SG tentative timeline SG CUB tentative timeline (19-15/0011r0) Discussion on direction of PAR Revisit 802.19.1-2014 as in contributions, IEEE802.19.1 overview (19-14/0056r1) and IEEE802.19.1 overview presentation notes (19-14/0061r0) Two options A new standard An amendment of 802.19.1-2014 Hyunduk Kang, ETRI

Straw Poll Do you support which direction of PAR for SG CUB? 1: 0 2: 3 January 2015 Straw Poll Do you support which direction of PAR for SG CUB? A New Standard An amendment of 802.19.1 Too early to decide 1: 0 2: 3 3: 10 Abstain: 0 Hyunduk Kang, ETRI

Teleconferences January 2015 Day Date Start Time End Time Call Host Tuesday February 10 5:00 PM Eastern Standard Time 6:00 PM Eastern Standard Time Hyunduk Kang Wednesday February 25 7:00 PM Eastern Standard Time Hyunduk Kang, ETRI

Tentative Timeline January 2015 Interim March 2015 Plenary Contributions on study items March 2015 Plenary Draft of PAR and CSD (Title, Scope, and Purpose) May 2015 Interim PAR and CSD submission to WG June 2015 PAR and CSD submission to EC (30 Days before July meeting) July 2015 Plenary PAR and CSD review by other WGs Hyunduk Kang, ETRI

March 2015 Plenary Objectives January 2015 March 2015 Plenary Objectives Continue to explore study items Decision on direction of PAR A new standard An amendment of 802.19.1-2014 Prepare draft of PAR and CSD Title, Scope, and Purpose Hyunduk Kang, ETRI