Presentation is loading. Please wait.

Presentation is loading. Please wait.

November 2014 IG CUB Opening Report

Similar presentations


Presentation on theme: "November 2014 IG CUB Opening Report"— Presentation transcript:

1 November 2014 IG CUB Opening Report
Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE TAG. If you have questions, contact the IEEE Patent Committee Administrator at Hyunduk Kang, ETRI Steve Shellhammer, Qualcomm

2 Interest Group: Coexistence on Unlicensed Frequency Bands
November 2014 Interest Group: Coexistence on Unlicensed Frequency Bands WG formed an interest group on coexistence in unlicensed bands at the March 2014 plenary meeting 19-14/0032r0: March 2014 WG Minutes The 1st face-to-face meeting held on July 2014. The CUB IG held 7 conference calls up to now The November 2014 plenary meeting is the 3rd face-to-face meeting. Hyunduk Kang, ETRI

3 November 2014 Purpose of IG CUB To explore coexistence issues in unlicensed frequency bands Current situations Potential problems To discuss possible solutions to solve coexistence problems A possible common coexistence solution which could be adopted to different systems To decide main topic of work of Study Group Hyunduk Kang, ETRI

4 Topics discussed up to now
November 2014 Topics discussed up to now Interference discovery (a.k.a., neighbor discovery) Connection establishment among neighbors Information needed to be exchanged among neighbors Fairness among neighbors Qualcomm’s vision on LTE-U technology LTE-U Coexistence Mechanisms Impact of LTE in Unlicensed Spectrum on Wi-Fi Status of ISM Bands LTE-U activities Coexistence Metric Fair spectrum sharing in unlicensed spectrum Update on UNII over 5GHz band in U.S.A. Coexistence between LTE-U and Wi-Fi Hyunduk Kang, ETRI

5 Pending candidates for SG work items
November 2014 Pending candidates for SG work items Two straw polls regarding suggested focus on Study Group are approved by the group Method for Wireless Coexistence Evaluation (19-14/0067r1) Coexistence Methods for Wireless Dissimilar Systems over Unlicensed Bands (19-14/0071r1) Hyunduk Kang, ETRI

6 Action items during this week
November 2014 Action items during this week To explore issues on coexistence Potential coexistence problems Technologies suitable for solving coexistence problems Scenarios or roadmap Other issues related to coexistence To discuss and decide focus of Study Group considering Title Target area of standardization To request EC approval of Study Group formation Hyunduk Kang, ETRI

7 November 2014 Hyunduk Kang, ETRI


Download ppt "November 2014 IG CUB Opening Report"

Similar presentations


Ads by Google