GLAST LAT System Engineering

Slides:



Advertisements
Similar presentations
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T/Online Workshop October 29 to November 1, 2002 R. Claus1 EM1 EGSE Configuration VME/cPCI Chassis LAT-COMM Electronics/OnlineSubsystem/simulator.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project IA Workshop, July 14, 2005 ACD subsystem Alex Moiseev 1 GLAST Large Area Telescope: IA Workshop July 14, 2005 AntiCoincidence Detector.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST Large Area Telescope Engineering Meeting 23 November 2004 Charge Injection Calibration James Swain Stanford Linear Accelerator Center
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectInstrument Analysis Workshop, June 2004 J. Eric Grove Naval Research Lab Washington DC Gamma-ray Large Area Space Telescope CAL Detector.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT Project SVAC Workshop, February 27, 2006 ACD subsystem Alex Moiseev 1 GLAST Large Area Telescope: SVAC Workshop February 27-28, 2006 AntiCoincidence.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
CMS Preshower: Startup procedures: Reconstruction & calibration
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope
GLAST Large Area Telescope:
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Calorimeter calibrations with Flight Software.
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
Eduardo do Couto e Silva Feb 28, 2006
GLAST Large Area Telescope:
CAL crosstalk issues and their implications
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT System Engineering Gamma-ray Large Area Space Telescope GLAST LAT System Engineering LAT Test Planning Meeting - ACD Testing Bob Hartman GSFC rch@egret.gsfc.nasa.gov 301-286-7178

ACD Testing Outline Types of tests done at GSFC Tests to be done at SLAC before integration EGSE MGSE and Handling – Worked out during visit to SLAC, week of 7/18-22, by Tom Johnson and Craig Coltharp. No further information in this presentation about this topic. Testing suggested after integration Suggested testing with other subsystems

Types of ACD Tests Done at GSFC Comprehensive Performance Test (CPT); includes Full Functional Test (next 2 slides) – nominal voltage and frequency Abbreviated functional using redundant interface - nominal voltage and frequency Margin tests (high and low voltages, high and low frequencies) ACD-triggered operation, using ROI coincidence mode - nominal voltage and frequency Externally triggered operation (triggered by two small NIM-based hodoscopes, with the trigger signal translated and input to a Tracker port on the GASU) – This was done with the ACD in several orientations, to get vertical muons through all faces of the ACD.

ACD Full Functional Test Completely script-based (nested suites) Content Outline Power-up scripts (2) Register tests (GARC and GAFE registers) GARC (digital ASIC) parity test GAFE (analog ASIC) tests (next slide) Hitmap timing test Crosstalk test Hardware counter test HVBS and PMT aliveness test

GAFE Tests (part of Full Functional) Content Bias calibrations Hold Delay scan Hitmap Delay scan GAFE noise test VETO discriminator calibration HLD (CNO) discriminator calibration Discriminator enable/disable test Charge injection and PHA calibration test (high and low ranges) Pedestal test

Pre-Integration Testing at SLAC All of CPT except External Triggering Full Functional 3 hours Redundant Interface 1 hour Margin Tests (probably) 6 hours Triggered Operation 3 hours Total 12-13 hours

EGSE ACD will bring the system we have been using – GASU, workstations, cables, margin test interface boxes, temperature readout system, and power supply, plus all other LAT-supplied EGSE except one system kept at Goddard for testing. Some items (e.g. temperature readout) are Goddard property and will not stay at SLAC. Pre-integration tests will be run using the existing ACD system. Once on the LAT, we assume the GASU will be one being used by I&T (which has known differences from the GASU ACD has been using). We have the choice of using an I&T workstation (since all the ACD test scripts are in the CVS repository with the Online group) or the ACD system.

Suggested Testing after Integration Try starting the Full Functional Power-up tests Register tests – At this point it is conceivable that clock phase error will cause failures. In that case, it will be necessary to go into a debug mode, using the initial power-up script, the GARC register test (which exercises the registers with many pattern), and an existing script which commands the GARCs to flip the phase of the return data, to clarify the clock phase requirement for each GARC. If permanent clock phase changes are needed, the Full Functional script will need (simple) modification. Once the clock phase question is settled, the Full Functional, the Redundant Interface Test, and the Triggered Operations can be run as before. There is no intention to run margin tests or external triggering with the hodoscopes while on LAT. TOTAL TIME after clock phase resolution, 6-7 hours

Suggested Testing with Other Subsystems Crosstalk test – All subsystems running in a noisy mode (ACD can use the Noisy Mode script from EMI testing.) Operations triggered by Tracker and Calorimeter – ACD needs data of this type to complete the demonstration that it meets efficiency requirement. In addition, we need (off-line, for analysis) muon trajectories from Tracker, to correct for cosine effect on pulse heights. VETOing test – Test ROI VETOing to prevent triggering by muons. (Assumes FSW is ready to do this.)