September 13, 2018.

Slides:



Advertisements
Similar presentations
Bexar Regional Watershed Management Program Bexar Regional Watershed Management Partnership Pre-Proposal Meeting for Bexar County Program Management of.
Advertisements

Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
Phase 1 Project Status: Design Continued development of alternative station design concepts for stations in the vicinity of USC and Expo Park Received.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
PROGRESS REPORT JULY 2012 Published August 20, 2012.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
2007 & 2012 BOND PROGRAM UPDATES San Antonio Military Engineers Market Research Conference Presented by: Mike Frisbie, P.E., City Engineer & CIMS Director.
Project Status: Design Initiated development of alternative station design concepts for stations in the vicinity of USC and Expo Park Received 85% design.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
1 August Accomplishments Conducted the 4 th Urban Design Committee meeting, which consisted of a tour of the Metro Orange Line. Conducted one-on-one briefings.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
July Accomplishments: Authority and Design Build Contractor staff conducted the 3rd Urban Design committee meeting. Committee members viewed proposed station.
Public Safety Committee September 28, 2015 David O. Brown Chief Of Police Pedestrian Safety.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners November 4, 2015.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
California’s Experience with HFST 1.  Overview  Challenging Locations  Collision Reduction (State and Local Roads)  Typical Placement and current.
Standards Review Subcommittee Update August 19, 2014 Co-Chairs Rebecca Berdahl, BPA Marie Knox, MISO.
Maintenance and Temporary Traffic Control
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
Capital Metro Downtown Station Improvements CMTA Board Briefing – October 2016 Interlocal Agreement (ILA) with City of Austin.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Arizona Forward Update
Presented By: Sean Campion P.E. Assistant Division Chief,
Hays County Commissioners Court
Project Status & Right-of-Way Acquisition
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Deputy Executive Director, Operations Virginia Port Authority
IA 122 RECONSTRUCTION PRE-BID MEETING
SAN PEDRO CREEK ARTS Program Update.
Phase 1 Project Status: Design
Highway 169 Bridge Replacement & Pavement Resurfacing
San Pedro Creek Status Update
August 28, 2018.
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
June 14, 2018.
July 12, 2018.
Status Report on Rochester’s DMC Transportation Plan
October 11, 2018.
January 10, 2019.
Est. May 5th 2018.
Bicycle and pedestrian roundtable
Est. May 5th 2018.
February 14, 2019.
March 14, 2019.
DESIGN ENHANCEMENTS DESIGN UPDATE. DESIGN ENHANCEMENTS DESIGN UPDATE.
Harbour Island Force Main Replacement
Richland Creek Water Supply Program Program Update
May 9, 2019.
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
I Street Bridge Replacement Project
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
ARCHIE BRIGGS Traffic Calming
National Organization of Minority Engineers Leadership Summit
June 13, 2019.
Presentation transcript:

September 13, 2018

Updates Phase 1.1 Phase 1.2 Partner coordination Remaining items Santa Rosa pedestrian crossing Phase 1.2 Design status Construction activities Calder Alley archaeological mitigation Commerce Street closure Partner coordination

Phase 1.1 Update Remaining Items Santa Rosa Pedestrian Crossing Additional railing at Travis Gatehouse Inlet lighting Temporary lighting to be installed Trash screen at inlet pump station Under design Santa Rosa Pedestrian Crossing Design submitted to COSA Comments Received

Increased Pedestrian Safety Constant flashing advanced crosswalk warning sign Rumble strips prior to crossing Pedestrian-activated RRFBs at crossing Mirror to allow pedestrians to see around curve

Phase 1.2 Construction Update Early Work Package (EWP) 11: Demolition and Utility relocation Utility relocation work ongoing Additional archeological investigations required in Calder Alley 3rd trench between first two trenches

Phase 1.2 Construction Update EWP 12: Heavy Civil Construction Drilled pier construction Former Dollar General site Penners parking area Dolorosa to Commerce EWP 13: Commerce bridge decking, Penners overhang

Commerce Street Closure Impacts will delay opening of one lane Underground conflicts Void under Continental building Weather delays Additional pedestrian wayfinding signs have been installed

Phase 1.2 Design Update 100% design plans submitted July 31 Design review meetings Subcommittee: August 28 Executive Committee: September 14 Bexar County: September 18 Guaranteed Maximum Price (GMP) submittal September 21 Presentation of design and GMP to Bexar County Commissioners Court in October

Partner Coordination Calder Alley coordination Camaron Street construction Project construction will be added to SDJV contract Currently at 50% design Commerce Street construction First phase to begin early 2019

Partner Coordination Executive Committee Next Meeting – September 21st David Smith, County Manager, Bexar County Lori Houston, Assistant City Manager, City of San Antonio Mike Frisbie, Director, Transportation and Capital Improvements, City of San Antonio Suzanne Scott, General Manager, San Antonio River Authority Next Meeting – September 21st

QUESTIONS & COMMENTS